Sydney Light Rail is covered

Sydney Light Rail is covered

One of the key components of any light rail system – any rail system for that matter – is the necessity for a complex electrical network. With Sydney well and truly in the construction of a new light rail network into the George Street/Circular Quay precinct, precision solutions to every aspect of construction is a must.

Which is why EJ has been commandeered for electrical network covers throughout the entire project. The choice made by the contractors was a wise one: quality, durability, heavy duty, easy access and of course, ERMATIC covers from EJ ticked all of these boxes.

The spec was for paver infill 3-part covers and frames (Class D) with a deep pan to allow the standard Sydney Greystone pavers to slot into the cover with a minimum of stone masonry expense. The ERMATIC covers were cast in our Picardie Foundry in France and assembled to the desired 3-part configuration prior to shipping direct into Sydney.

As exposés go, the specification of ERMATIC covers was probably no surprise to an engineer or construction company. The ease with which these covers can be installed and later accessed for servicing work makes it a no brainer to specify. And the EJ team will always make projects of this nature a breeze for those who need advice on best product solutions.

For more information about the ultimate cover-up, ERMATIC by EJ, contact your nearest branch or call 07 3216 5000. 

Greg Butler B.Pol (Inv.)

Emergency Management , WHS, Evac, Risk Management,Event planning,Consultant.

6y

I hope they have an extensive public education program. There has not been trams down Sydney main streets for decades. Unfortunately pedstrians and drivers will move into the path of the quiet trams.

Like
Reply
Jan Tusek

Project Manager at 42technology AG

6y

Jun.

Like
Reply

To view or add a comment, sign in

Insights from the community

Others also viewed

Explore topics