Wilson Transformer Company’s Post

View organization page for Wilson Transformer Company, graphic

26,882 followers

Have you ever wondered how we build our transformers and what goes into their construction? Take a behind-the-scenes look into some of the processes of manufacturing of one of the biggest transformers made in Australia. This 350 MVA 330/33/33kV ONAN/ODAF transformer is the last of three units we have built for the Waratah super battery energy project - the largest committed battery project in the southern hemisphere. Given their size, every aspect of the transformers was meticulously engineered, taking into account various electrical, mechanical, thermal, environmental, and logistics factors.

Martin Mathiasen

Transformer Lead at Powertech

2mo

That was great to watch. Excellent Transformers, made by great people.

It's fascinating! Great work.

Like
Reply
Mustafa Ali

POWER & DISTRIBUTION TRANSFORMER DESIGN & SPECIFICATION SPECIALIST

2mo

Excellent Video to show the Marvels of POWER TRANSFORMER 's Engineering / Manufacturing. 👍👍👍👍👍

Vinay Kumar

Transformer Design & Engineering

2mo

Rare to see 350MVA/330kV txf managed with three limb construction.....

Peter Stewart

MIEAust RPEV(Elec) Specialist Asset Manager (Electrical)

2mo

Thanks to Bob Barbara and the Wilson Transformers team for showing a group of Melbourne Water engineers around the Glen Waverley factory. It was fascinating to see the various stages of manufacturing, along with the testing facility and oil analysis lab.

Absolutely LOVE this....fantastic display of awesome teamwork. So proud to STILL say that I worked for WTC!!

Justin Sablovs

Project/Contract/Production Manager

1mo

Go WTC Team! It was a pleasure to work amongst the Wilson Teams and I still love hearing about the projects achievements. It was a pleasure to work for a company that was always so decided to achieve such a high standard of quality.

David Farmer

Field Sales Representative (Victoria) at James Walker Australia

2mo

Local capability 💪🏻👏🏻

R K Mohapatra

Ex G M Transformer Design BHEL Director AARAMCO Transformer Consultancy

2mo

Please enlighten the Zero sequence parameters achieved

Like
Reply
David Gurrie

Project Delivery Manager

2mo

Made in Australia with Pride

See more comments

To view or add a comment, sign in

Explore topics