The Lane Construction Corporation’s Post

Lane's Ship Canal Water Quality project in Washington state is a new 2.7-mile, 18’10” diameter #tunnel that will capture and temporarily hold more than 29.6 million gallons of #stormwater and sewage during heavy rains. When the storm passes, flows will be released to the treatment plant. The new structures will prevent, on average, up to 75 million gallons of polluted stormwater and sewage from entering local waterways. Learn more: https://lnkd.in/evqsCRVA Seattle Public Utilities King County, WA

Pietro F.

Senior Superintendent

3w

In this case the word “pride” is the appropriate one. Proud and grateful to have had the opportunity to contribute to this project. Grazie ai mio direttore Fabrizio Fara ed ai miei colleghi Francesco Chiappalone Franco Maurizio Gasperin Alessio Andreini Andrea Codalli Per avermi sopportato!

Couldn't have had a better contractor build this.

Like
Reply

Another great company to team Up along

Like
Reply
Julian Alonso Redondo

Tunnel Survey Manager at SPARK NEL D&C, Tunnel & Underground Construction specialist, LEAN enthusiastic, BIM autodidact.

3w

Amazing job, congratulations Fabrizio Fara!

See more comments