The $1.6 billion State Highway 183 reconstruction in Texas faced unexpected hurdles, including a crucial grade change for drainage correction.
The Operations Manager at Cheyenne Construction had revealed a surprise road elevation of up to four inches after utility manholes were already in place.
Cheyenne Construction's solution? Enter American Highway Products Pivoted Turnbuckle Manhole Risers.
The Texas Department of Transportation approved the grade match, enhancing project safety and efficacy.
Incorporating adaptability, the risers were custom-sized and stackable for varying pavement thicknesses, allowing for over 550 of our risers to be seamlessly integrated.
As their team confirmed, "They're heavy duty ribbed steel. They're not going anywhere."
The Highway 183 project showcases how pioneering solutions, like those from American Highway Products, redefine infrastructure challenges, driving progress and excellence.
#AmericanHighwayProducts #Infrastructure #AsphaltPaving #RoadwaySolutions #TrafficManagement
Freight Maestro 🎩 | Logistics Virtuoso 🚛 | Captaining Fun & Freight | Bringing Folks to Local Wineries & Breweries Since 2016 🍻 | Turning Shipping Woes into Wins One Load at a Time
6dMy lanta that's a large beam!! Some of the wind/solar projects I've managed are 140 but 122 of concrete is a different monster! I'd love to know the preparation involved in the transportation of these bad boys!