What’s more “fab” than regular construction? “Prefab” construction! 🏗 At the Atrium Health Carolinas Medical Center in Charlotte, NC, an NBBJ-led team paired a standards-based approach with prefabrication and bulk purchasing to successfully mitigate over $100M of cost escalation exposure. The project is over 60% prefabricated, including headwalls and toilet pods in each of the 448 private patient rooms. Currently under construction, the 12-story building will also include a new, flexible OR/interventional platform and imaging modalities supporting trauma, cardiac and neuro service lines; a new emergency department; and space supporting medical education and conferencing. DPR Construction, Sean Ashcroft, Andy Snyder, AIA, NCARB #prefab #construction #healthcaredesign #healthcare #nbbjdesign
Great team and a wonderful project!
Senior Principal at Walter P Moore
3moThis has been an amazing journey with the NBBJ and DPR Rodgers team!