Progress Update Some nice progress photos from our EPC tank project on Kamoa Kakula Mine in the DRC. Our scope is the full EPC (full design and construction) of a 10,000m3 advanced diesel storage facility. We are now fully comfortable working in French in DRC as a local entity. #DRC #mining #oilandgas — Sign up for our email alerts to be notified of vacancies, new project awards and courses: https://buff.ly/3x0elpj
Good much blessing Epcm to get more jobs in the world in is team
Nice pictures, any project pictures from aluminium dome cover?
Nice work, congratulations.
Senior Electrical Design Engineer at EHL Engineering Group
1moWe are ready to serve you