Cumulatively, I will Never Fails & Never Sleep the same like Corrosion. So, let’s work together with the firm Oil & Gas (i.e.) CP in all respects of Supervising Manager tasks to save the Corrosion Costs of the respective Client/Owner Cumulatively from starting to end with Decorum.
“Note”:
CP Supervision Manager Tasks for Many Cross-country Pipelines, Storage Tank bottoms, Storage Vessels, Plant Piping’s, City Gas Distribution Networks, Micro Tunnelling & Inter Refinery Pipelines (IRP) (having different Diameters & Varies Lengths) have been done by me efficiently overtimes for Saving the Corrosion Costs of the Respective said Client/Owner in India as well Gulf Countries Cumulatively & Very Successfully in the said firm Oil & Gas/CP.
My Positive Strengths:
1. Strong Educational Background with Electrochemical Protection system is an elective chosen in my B. Tech final year Projects.
2. Upon successful Completion of the same B. Tech, Placed / Employed on Campus at M/s. Corrtech International Private Limited, Ahmedabad, Gujarat, who is the topmost concern in India in Oil & Gas sector & Awarded Two times especially in the year Millenium for the best Performance in working Cumulatively to save the corrosion costs.
3. Capable for saving the Corrosion Costs in CP Supervising Manager tasks Cumulatively from starting to end.
#Supervision Manager Tasks for TCP SACP Galvanic & PCP ITP ICCP system Soil Resistivity Pre-Design site survey, Soil Sample Collections, Design, & Datasheets (Supply), Equipment’s Installation at Project site, TCP SACP Galvanic anode & PCP ICCP system Testing & Commissioning wherever applicable, Post PCP ICCP System Commissioning Surveys, Project Closing following by submissions of As-Built Documents to the respective Project Client for the Completed & Commissioned Permanent ICCP Systems & also including the main an intentional Billing in time in line with Client’s approved billing breakup & an intentional Payment receipts in time in line with Client’s approved Payment Terms after frequent followings with the respective Client for releasing out outstanding Payment in time against Submitted/Certified Invoices/Bills for meeting an essential Project expenses overtime for an Intentional smooth execution of On-Going Projects.
Let's work to Save the Corrosion Costs....
Let's work together to Save the Corrosion Costs....
Let's work together to Save the Corrosion Costs Cumulatively with Decorum from Starting to finishing..
JBM Auto limited sanand Gujarat
1wIs there any opening for production supervisior, [email protected] 91-8295497428