Cobb's Water System is looking for an engineering division manager. This position is essential to the Water System as it manages the agency's Engineering Division, which includes water, sewer, and water reclamation facility design and construction management; sewer system evaluation surveys; planning; site plan review; inspections of developer installed water and sewer infrastructure; and infrastructure records management and mapping. You can apply for the opportunity here: https://lnkd.in/e94tQq-n #expectthebest #cobbwater #engineeringdivisionmanager #waterengineer #workforCobb
Cobb County Government’s Post
More Relevant Posts
-
Mapping the Subterranean: Exploring the Underground Utility Mapping Market! 🏗️🌐 For More Detailed info Visit @ : https://lnkd.in/eJfQ4u-6 Attention civil engineers, infrastructure professionals, and urban planners! Let's delve into the critical realm of underground utility mapping and uncover the latest trends, innovations, and opportunities shaping this essential market segment. Overview of the Underground Utility Mapping Market The #Underground utility mapping is used to assess the position of underground utilities such as pipework or electric wires. Underground utility mapping is an essential part of the #civil engineering process as it saves time and money on expensive utility repair work. The #project planners can precisely schedule costs for work to be done with the aid of a detailed utility map. The underground #utility mapping market is experiencing significant growth, driven by the increasing need for accurate, comprehensive mapping of subsurface #infrastructure to support urban #development, infrastructure projects, and utility management initiatives. Accurate mapping of #underground utilities, including water pipes, sewer lines, gas pipelines, and electrical cables, is crucial for ensuring infrastructure integrity, minimizing risks of damage during construction, and #facilitating efficient #maintenance and repairs. #UndergroundMapping #UtilityMapping #SubsurfaceMapping #UndergroundInfrastructure #UtilityLocating #GeospatialMapping #SubsurfaceDetection #GeophysicalSurvey #InfrastructureMapping #UndergroundSurveying #UtilityDetection
To view or add a comment, sign in
-
-
As a heavy civil contractor, we specialize in serving various markets that require robust infrastructure and construction expertise. Our primary markets include: Transportation: We excel in building and maintaining roads, highways, bridges, tunnels, and transit systems, ensuring safe and efficient transportation networks for communities and businesses. Energy: Our services encompass the construction of power generation facilities, substations, and transmission lines, supporting the energy sector's critical infrastructure needs. Water Resources: We contribute to the development of water and wastewater treatment plants, dams, reservoirs, and stormwater management systems to ensure clean water supply and flood control. Industrial: Our expertise extends to industrial projects such as refineries, manufacturing facilities, and distribution centers, helping industries expand and improve their operations. Environmental: We play a vital role in environmental restoration and remediation projects, working to preserve and protect natural habitats and ecosystems. Public Facilities: We are committed to building public facilities like schools, healthcare centers, and government buildings, enhancing the quality of life in our communities. Commercial and Residential Development: We support commercial and residential developers in creating infrastructure, such as utility systems, roads, and drainage solutions, to enable successful construction projects. Mining and Natural Resources: Our capabilities include work on mining sites, extraction facilities, and related infrastructure to support resource-based industries. By serving these diverse markets, we leverage our heavy civil construction expertise to meet the unique needs of each industry and contribute to the growth and development of the regions we operate in.
To view or add a comment, sign in
-
Most projects suffer due to lack of capability of the project proponent and an inept mindset among its engineers and designers that extensive inclusion of environmental mitigation measures in the project design leads to very high construction and O&M costs in the long-run. At the planning stage itself, land availability is one of the main factors that govern the establishment of a substation project. This involves a contiguous piece of land that can infringe upon scarce populated/forest/cultivated land. While identifying the power substation as part of the system for a generation project or as a part of distribution grid, preliminary site selection is done by the utility based on the shortest length of the incoming (incomer) and outgoing lines which are normally surveyed/marked on the 1:50,000 maps/topographical maps of the area with details about proximity to sensitive receptors in the area.
The life of a power substation project: Design, construction, erection and commissioning | EEP
electrical-engineering-portal.com
To view or add a comment, sign in
-
Why site inspections and utility investigations matter? Before any construction project breaks ground, thorough site inspections and underground utility investigations are crucial. Buried infrastructure can be a hidden hazard, and these assessments are essential for uncovering: • Unidentified utilities: Gas lines, electrical cables, water pipes, and sewer systems can be buried unpredictably. Striking one during construction can be dangerous and cause costly delays. • Utility condition: Even known utilities may be deteriorating or nearing the end of their lifespan. Identifying these issues early allows for budgeting for repairs or replacements before they become a project roadblock. • Conflicts with planned construction: Underground utilities can significantly impact your project design. Knowing their location upfront helps engineers create a realistic and feasible plan that avoids rerouting or disrupting essential services. By proactively identifying these utility-related risks, PRO Consultants can help: • Enhance safety for workers and the public • Prevent costly delays and accidents caused by accidentally damaging utilities • Ensure project designs are realistic and feasible, avoiding clashes with existing infrastructure Investing in upfront inspections, including utility investigations, saves time, money, and minimises headaches down the line. #undergroundutilities #utilities #digitalengineering #safety #infrastructure
To view or add a comment, sign in
-
Most projects suffer due to lack of capability of the project proponent and an inept mindset among its engineers and designers that extensive inclusion of environmental mitigation measures in the project design leads to very high construction and O&M costs in the long-run. At the planning stage itself, land availability is one of the main factors that govern the establishment of a substation project. This involves a contiguous piece of land that can infringe upon scarce populated/forest/cultivated land. While identifying the power substation as part of the system for a generation project or as a part of distribution grid, preliminary site selection is done by the utility based on the shortest length of the incoming (incomer) and outgoing lines which are normally surveyed/marked on the 1:50,000 maps/topographical maps of the area with details about proximity to sensitive receptors in the area. Read more https://lnkd.in/dNauDZjS
The life of a power substation project: Design, construction, erection and commissioning | EEP
electrical-engineering-portal.com
To view or add a comment, sign in
-
Most projects suffer due to lack of capability of the project proponent and an inept mindset among its engineers and designers that extensive inclusion of environmental mitigation measures in the project design leads to very high construction and O&M costs in the long-run. At the planning stage itself, land availability is one of the main factors that govern the establishment of a substation project. This involves a contiguous piece of land that can infringe upon scarce populated/forest/cultivated land. While identifying the power substation as part of the system for a generation project or as a part of distribution grid, preliminary site selection is done by the utility based on the shortest length of the incoming (incomer) and outgoing lines which are normally surveyed/marked on the 1:50,000 maps/topographical maps of the area with details about proximity to sensitive receptors in the area. Read more https://lnkd.in/dYMG4hZr
The life of a power substation project: Design, construction, erection and commissioning | EEP
electrical-engineering-portal.com
To view or add a comment, sign in
-
🔧 Wondering about the importance of site utility in construction projects? 💡 Our latest blog post delves into the critical role of site utility and its impact on project success. Gain valuable insights into this essential aspect of construction management. 🏗️ Here's a sneak peek of what we explore: The fundamentals of site utility and its significance in construction Key components such as water, electricity, and telecommunications Challenges and solutions for integrating site utility into project planning Best practices for optimizing site utility to enhance efficiency and safety #ConstructionManagement #SiteUtility #BehmEnterprises https://bit.ly/43hIWLl
The Role of Site Utility - Behm Enterprises - Underground Utility Installation
https://behment.com
To view or add a comment, sign in
-
Most projects suffer due to lack of capability of the project proponent and an inept mindset among its engineers and designers that extensive inclusion of environmental mitigation measures in the project design leads to very high construction and O&M costs in the long-run. At the planning stage itself, land availability is one of the main factors that govern the establishment of a substation project. This involves a contiguous piece of land that can infringe upon scarce populated/forest/cultivated land. While identifying the power substation as part of the system for a generation project or as a part of distribution grid, preliminary site selection is done by the utility based on the shortest length of the incoming (incomer) and outgoing lines which are normally surveyed/marked on the 1:50,000 maps/topographical maps of the area with details about proximity to sensitive receptors in the area. https://lnkd.in/dYMG4hZr
The life of a power substation project: Design, construction, erection and commissioning | EEP
electrical-engineering-portal.com
To view or add a comment, sign in
-
Happy New Year from OEI! As we enter 2024, we would like to take the opportunity to highlight some of the engineering services that we offer. Water and Wastewater: Oller Engineering, Inc. prides itself on our team of engineers with experience in water and wastewater. Some of our services include wastewater and water treatment design, water system design, system modeling, distribution design, groundwater development, large diameter pipe design, water rights negotiation, permitting, master planning, storage tank design, and regulatory compliance mediation. Environmental: Our environmental engineering department offers a wide variety of services, including permit preparation, site selection, Phase I and II site assessments, geological investigation, design of Type I and IV AE landfills, and environmental impact statements. We are happy to ensure the health and safety of both Texas citizens and the environment, as well as to serve as your liaison with governing bodies so that all federal and state environmental regulations are met. Stormwater and Drainage Management: Our stormwater team at OEI is proud to reduce flooding and improve drainage management for our clients by designing systems that effectively control stormwater discharge and protect surface water. Our team will also develop stormwater pollution prevention plans (SWPPPs) to protect exposed areas that may be negatively affected by stormwater flow during times of construction. Land Development and Site Improvements: At OEI, we understand that commercial, residential, multi-family, and recreational land development can come with challenges. Our team is qualified to help our clients navigate these challenges by providing water and wastewater treatment facilities and distribution system design, reuse system and utility design, system analysis and optimization, asset management, district engineering consultation services, and preparation of bond applications. Transportation: OEI’s team of engineers design and implement transportation systems that ensure the safe flow of traffic by providing traffic analysis, transportation planning, and 3D simulation and design. We are pleased to offer balanced, cost-effective solutions to our clients’ transportation challenges. GIS and Survey: The GIS and Survey department at OEI is ready to provide our clients with detailed and precise mapping and location services for use in project layout and design, permitting, and public outreach. Our survey team uses state-of-the-art equipment and technology to deliver measurements, topographic mapping, and geospatial data with cutting-edge accuracy, while our GIS team harnesses Geographic Information Systems to transform complex data into actionable insights. We are excited to continue providing our professional services through 2024 and many years beyond. If you would like to learn more, please visit our website at oei-eng.com or call our office at (806) 993-6226.
To view or add a comment, sign in
-
-
Relocating preexisting utilities on a job site so that they can coexist with new construction is a complex task that requires meticulous planning and effective communication. Coordination with providers guarantees that the utilities like water, sewer, and electricity are precisely located and marked, will be safe to work with, and that the new location meets any necessary regulations. Involving stakeholders like utility owners and government entities early in the project ensures as little delay and risk as possible, laying the foundation for a successful project. #earlyplanning #construction #coordination
To view or add a comment, sign in
-