Muheeb Valiulla

Muheeb Valiulla

Homestead, Florida, United States
834 followers 500 connections

About

13 years of experience in Project Management, Planning, Quantity Survey, Budgeting…

Activity

Join now to see all activity

Experience

  • Black & Veatch Graphic

    Black & Veatch

    Homestead, Florida, United States

  • -

    Al-Khobar Governorate, Saudi Arabia

  • -

    Jubail

  • -

    Dahej, Bhavnagar

  • -

    Jamnagar

  • -

    Viramgam

Education

  • Gujarat University Graphic

    Gujarat University

    -

    Activities and Societies: Cricket team, volley ball team. Activily participated in the management of technical and cultural festivals.

    Civil Engineer

  • -

Licenses & Certifications

Projects

  • Master Gas System Phase II Package 3

    - Present

    Master Gas System Expansion Phase II Pipeline Project Package 3 is located in the East West pipeline along Shedgum-Riyadh Gas (SRG) Pipeline corridor from EWPS #1 to KM 245.2 and consists of:
    • SRG-3 56” externally coated carbon steel pipeline, approximately 150 KM, from East West Pump Station #1 (EWPS#1) to BGCS#3. It includes six (6) mainline valve stations and one (1) scraper trap launcher at EWPS#1.
    • SRG-2 Sec III 56” externally coated carbon steel pipeline, approximately 40 KM from…

    Master Gas System Expansion Phase II Pipeline Project Package 3 is located in the East West pipeline along Shedgum-Riyadh Gas (SRG) Pipeline corridor from EWPS #1 to KM 245.2 and consists of:
    • SRG-3 56” externally coated carbon steel pipeline, approximately 150 KM, from East West Pump Station #1 (EWPS#1) to BGCS#3. It includes six (6) mainline valve stations and one (1) scraper trap launcher at EWPS#1.
    • SRG-2 Sec III 56” externally coated carbon steel pipeline, approximately 40 KM from BGCS#3 to KM 245.2 (KM 916 of AY-1. It includes four (4) mainline valve stations and one (1) scraper trap receiver at KM 245.2.
    SRG-3 pipeline includes 6 main line valve stations and permanent scraper traps at end-point locations.
    SRG-2 Sec. III pipeline includes 4 main line valve stations and permanent scraper traps at end-point locations.


    • Master Gas System Phase II: Saudi Aramco
    o Civil & Mechanical Works: US $ 50 M

    See project
  • Fadhili Down Stream Project

    -

    56” Main Pipeline FDEWG-1

    • Fadhili Down Stream project: Saudi Aramco
    o Civil Works: US $ 10 M

    See project
  • Ro-Ro Ferry Terminal Project at Gogha and Dahej, Gujarat

    -

    Roll-on, Roll-off (or Ro-Ro) ferries are special vessels on to which vehicles can drive and be accommo-dated for the sea journey on special vehicle decks within the vessel. The circuitous road distance around the gulf between the proposed terminals of Gogha and Dahej is 360 Km. The sea distance be-tween terminals is approximately 31 km

    Jan’12-Dec’12 Dahej, Gujarat, India
    Project Valuation: $50 million
    • Dahej Jetty (500m) & Gogha Jetty (1200m)
    • Pontoon (50m x 30m) & Link Span…

    Roll-on, Roll-off (or Ro-Ro) ferries are special vessels on to which vehicles can drive and be accommo-dated for the sea journey on special vehicle decks within the vessel. The circuitous road distance around the gulf between the proposed terminals of Gogha and Dahej is 360 Km. The sea distance be-tween terminals is approximately 31 km

    Jan’12-Dec’12 Dahej, Gujarat, India
    Project Valuation: $50 million
    • Dahej Jetty (500m) & Gogha Jetty (1200m)
    • Pontoon (50m x 30m) & Link Span (100m)
    • Buildings and landscaping works

    Other creators
    See project
  • Essar Oil Refinery Expansion Project

    -

    To increase the base capacity of the refinery at Vadinar from 10.5 to 18 MMTPA, subsequently optimization to 20 MMTPA and also to enhance the rating from 6.1 to 11.8 on the Nelsons Complexity Index.

    EPC for Essar Oil Refinery Expansion
    April’10-Dec’11 Jamnagar, Gujarat, India
    Project Valuation: $102 million
    • Waste Water Treatment Facilities - 42 units
    • Reverses Osmosis Plant - 13 units
    • Cooling Tower – 1,2 & 5

    EPC for Essar Oil Refinery Expansion
    Aug’09 –…

    To increase the base capacity of the refinery at Vadinar from 10.5 to 18 MMTPA, subsequently optimization to 20 MMTPA and also to enhance the rating from 6.1 to 11.8 on the Nelsons Complexity Index.

    EPC for Essar Oil Refinery Expansion
    April’10-Dec’11 Jamnagar, Gujarat, India
    Project Valuation: $102 million
    • Waste Water Treatment Facilities - 42 units
    • Reverses Osmosis Plant - 13 units
    • Cooling Tower – 1,2 & 5

    EPC for Essar Oil Refinery Expansion
    Aug’09 – April’10 Jamnagar, Gujarat, India
    Project Valuation: $35 million
    • Desalination Units A & B
    • Hazardous & Non-Hazardous Waste Sheds

    Other creators
    See project

Honors & Awards

  • Certificate of Recognition

    Saudi Aramco

    Successful Completion of Civil & Mechanical Works for Fadhili Downstream Pipeline Project.

  • Certificate of Appreciation

    Abdullah A Al Barrak & Sons Co.

    For Extraordinary , outstanding and dedicated performance.

  • Certificate of Appreciation

    Essar Projects(India) Limited

    My performance for the period of 2011-12 was rates as “Performance Significantly Exceeds Expectations” rated 4/5.

  • Certificate Of Appreciation

    Essar Projects (India) Limited

    My performance for the period of 2010-11 was rates as “Performance Redefines Organization Standards”, the highest rated 5/5.

Languages

  • English

    Full professional proficiency

  • Hindi

    Native or bilingual proficiency

  • English

    Full professional proficiency

Recommendations received

More activity by Muheeb

View Muheeb’s full profile

  • See who you know in common
  • Get introduced
  • Contact Muheeb directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Others named Muheeb Valiulla

Add new skills with these courses