MCE and GSCE begin first phase of 20GW solar-plus-storage plan in California. California community choice aggregator MCE and developer Golden State Clean Energy (GSCE) have partnered to work on a solar-plus-storage project in California, the first in a plan to install up 20GW of solar and 20GW of energy storage. MCE and GSCE will work on a solar and battery energy storage system (BESS) project as part of a development programme known as the Valley Clean Infrastructure Plan. The Valley Clean Infrastructure Plan aims to repurpose up to 130,000 acres of drainage-impaired or water-challenged lands in the Westlands Water District in Fresno County. The District is the largest agricultural water district in the US at 614,000 acres, or 2,400 square kilometres, and serves the agricultural sector. At full buildout, the plan would include up to 20GW of solar and 20GW of energy storage, which, if achieved, would cover one-sixth of California’s electricity requirements in 2035, MCE said. In the nearer term, MCE and GCSE have entered a memorandum of understanding (MOU) for 200-400MW of solar and BESS.
TNi Energy-BESS 1.20MW 10HR LDES, we've innovated a groundbreaking method that repurposes recycled lead-acid batteries, extending their life span to 25 years for C1 to C20 Energy Storage purposes. Previously, the industry lacked a safe and environmentally conscious alternative to lithium | sodium-ion batteries. However, our proprietary technique reveals that lead-acid batteries are not only SAFER but also 60-75% more cost-effective than their hazardous counterparts. Made in the USA
#TNiEnergy,#10HRLDES,#ELDES,#C1toC20,#nebulositycloud, #BESS,#C3Energy,#Energy, #ZEROemmissions, #ZEROcarbon, #energytransistion, #LeadAcid Battery, #windpower, #solarpower, #VPP, #MicroGrid, #DERM, #HydroPower, #BitCoinMining
4