We were happy to welcome Communities Empowered Through Construction, Inc. interns to the 1237 W. Division jobsite for a tour of Chicago's first multi-story logistics facility. Communities Empowered Through Construction is an award-winning talent management and diversity consulting firm. CEC specializes in creative outreach solutions, establishing strategic community partnerships and developing a strong workforce, while building a bridge between Chicago’s communities and the construction industry. #WalshAtWork
The Walsh Group - Walsh Construction & Archer Western
Construction
Chicago, IL 157,916 followers
About us
The Walsh Group is a 124-year-old company providing design, build, finance, operation and activation services. The family-owned company is in its fourth generation of leadership, and is listed as the 15th largest contractor according to Engineering News-Record. We operate as Walsh Construction, Archer Western and Walsh Canada; having experience in a wide variety of building, civil, and transportation sectors including wastewater and water treatment plants, rapid transit, highway and bridges, education, warehouse/distribution, hospitality, sports and entertainment, correctional and office facilities. We've invested in over $700 million in capital equipment and proudly employ over 8,000 engineers and skilled tradespeople.
- Website
-
http://www.walshgroup.com
External link for The Walsh Group - Walsh Construction & Archer Western
- Industry
- Construction
- Company size
- 5,001-10,000 employees
- Headquarters
- Chicago, IL
- Type
- Privately Held
- Founded
- 1898
- Specialties
- Civil Constuction, Healthcare, Building, Aviation, Correctional, Bridge, Airport, Highway, Hydroplant, Education, Pump Station, Entertainment, Transit, Federal Building, Waste Water Treatment, Water Treatment, Data Center, Federal Building, High-Rise Residential, Hospitality, and Finance
Locations
Employees at The Walsh Group - Walsh Construction & Archer Western
Updates
-
Across the United States, we're hiring skilled craft, experienced professionals and entry level roles to drive our cutting-edge projects to success. From the field to the office, there are hundreds of opportunities to join The Walsh Group, one of the most versatile construction companies! Click here to view our skilled craft opportunities: https://lnkd.in/gjXenmUF Click here to view our experienced professional opportunities: https://lnkd.in/ebi4JX-B The Walsh Group is an Equal Opportunity Employer, Disability/Veteran
-
-
Segment by segment, these precast sections are forming the arches of Miami's new I-395 Signature Bridge. With the first arch fully connected, work is underway on raising the second arch. In total, #ArcherWestern and The de Moya Group, Inc. will connect 345 segments to deliver the bridge's six iconic arches.
-
Walsh Construction is celebrating the milestone installation of the final girder for the I-270 Chain of Rocks eastbound bridge in St. Louis! This new structure is being built directly south of the existing Chain of Rocks Bridge, and is the first of the project's twin bridges to be built. The second will be constructed one on the same alignment as the existing bridge. Check out these construction numbers for the new eastbound structure: ✅ Number of girders = 298 ✅ Number of cross frames = 1,677 ✅ Number of laterals = 281 ✅ Number of bolts = 75,333 ✅ Total weight of eastbound bridge = 14,853,620 lbs. #WalshAtWork
-
-
Thrilled to report the expansion of the Big Creek Water Reclamation Facility has achieved its latest significant milestone, putting online 32 MGD of advanced wastewater treatment! This includes the full liquids process with a new Headworks, inclusive of 6mm Coarse Screening and Grit Removal, Primary Clarification, Fine Screening at 2mm, Biological Nutrient Removal with Large Bubble Mixing and Fine Bubble Diffusion, and a Membrane Bioreactor treatment process. The MBR technology is one of the most advanced treatment technologies in wastewater treatment. The system combines biological treatment/nutrient removal with ultrafiltration membranes that filter out particles greater than 0.04 µm (about one millionth of an inch) in diameter. The overall project, being delivered by #ArcherWestern and Brown and Caldwell, expands the Big Creek WRF from 24 MGD to 32 MGD, and is Fulton County's largest single capital improvement project to date. Using the progressive design-build delivery method, this milestone was achieved through collaboration, trust, and a project-first mentality from all project stakeholders.
-
-
Placing the Miraculous Medal in our first concrete pour at the Sunnyvale (California) Water Pollution Control Plant where Walsh Construction is rehabilitating the existing pipelines and process facilities, while delivering new duct banks, electrical, instrumentation and control system improvements. #WalshAtWork #tradition
-
Pouring the latest deck section for the new Howard Frankland Bridge stretching across old Tampa Bay. #ArcherWestern and Traylor Bros., Inc. continue great progress on the three-mile-long project, where: - 100% of pilings have been driven. - 99% of bridge footings have been completed. - 99% of bridge columns have been completed. - 96% of bridge caps have been completed. - 85% of the bridge superstructure beams have been placed. - 74% of bridge decks placed.
-
Continuing our Miraculous Medal tradition at the first concrete pour for the Canadian National Railway Spaulding to Sutton Double Track Project in Elgin, Illinois. Walsh Construction is widening 4.25 miles of the mainline track between Elgin and Hoffman Estates, as well as widening two existing railroad bridges. The first concrete pour was performed for the new footings to widen the Poplar Creek Bridge, which was built in 1915. #WalshAtWork https://lnkd.in/g2gMmkWM
-
-
#ArcherWestern and Sundt Construction structure crews install prestressed TX-54 concrete girders along the 183 North Mobility Project in Austin, Texas. Performing work as Great Hills Constructors, the Archer Western-Sundt team is working across nine miles of US 183 to construct two express lanes in both directions between SH 45 North and the MoPac Expressway, as well as express lane direct connectors with MoPac to the south. The project aims to improve mobility, reduce congestion and provide more reliable travel times for transit and emergency responders. https://www.183north.com/
-
-
Cab removal and demolition of the old air traffic control tower at the Charlotte-Douglas Internatioanal Airport (CLT). Archer Western constructed CLT’s new 370-foot-tall air traffic control tower that was commissioned in 2022. #WalshAtWork #aviation