Suntec is proud to share another #ProjectUpdate about the progress of South Pier, a 945,742 SF project on the shores of Tempe Town Lake. As these three mixed-use towers continue to rise, our team continues to achieve great results. This night's pour was dedicated to level three of tower three, pouring a total of 200 cubic yards of concrete in the middle of an Arizona summer night. This development would not be possible without a team of great partners: Clayco, BARNOLI & SONS CONCRETE INC, PK Associates Structural Engineers, DAVIS, Cemex, and Silverstein Properties. For more South Pier milestones, visit https://bit.ly/4cJgWUF today!
Suntec Concrete
Construction
Phoenix, AZ 14,729 followers
The largest commercial concrete construction company in the Southwest.
About us
Established in 1984, Suntec Concrete Inc. is a commercial concrete construction company with locations in Arizona, Denver, and Utah. Suntec performs all aspects of commercial concrete construction, specializing in structural, tilt panel, flatwork and foundation construction. Suntec also self performs all concrete placement and finishing.
- Website
-
http://www.suntecconcrete.com
External link for Suntec Concrete
- Industry
- Construction
- Company size
- 1,001-5,000 employees
- Headquarters
- Phoenix, AZ
- Type
- Self-Owned
- Founded
- 1984
- Specialties
- commercial, structural, tilt panel, flatwork, foundation, finishing, education, industrial, office, multifamily, hospitality, healthcare, and concrete
Locations
-
Primary
23751 N 23rd Ave
Suite 175
Phoenix, AZ 85085, US
-
7065 E. 54th Place
Commerce City, CO 80022, US
-
2961 California ave
Suite B
Salt Lake City, UT 84104, US
Employees at Suntec Concrete
Updates
-
Suntec is proud to have worked with a tremendous team to complete the construction of Superstition Commerce Center, a 1.6 million SF industrial park in Mesa, AZ. This project offers six buildings with spaces ranging from 99,900 SF to 203,000 SF, located near some of the Valley's biggest companies. Suntec poured and lifted 647 panels for this site, equaling 522,000 SF of panels. There was a total of 57,700 cubic yards of concrete poured. Located just three miles from the 202 Loop and less than 30 minutes to Phoenix Sky Harbor International Airport, this business hub will greatly benefit the East Valley! Thank you to our partners Dalfen Industrial LLC, Layton Construction, Pro-Low Joint Venture, Next Level Steel, LLC, Cemex, and Suncoast Post-Tension, Ltd. Completed project photography courtesy of Layton Construction. #SuntecConcrete
-
601 N Central, a 29-story mixed-use development, has topped out, bringing this project one step closer to completion in Downtown Phoenix! With 63,706 cubic yards of concrete poured and 3,831 tons of rebar used, the Suntec team is very proud of this major milestone. The foundation work began in March of 2023 on this 747-unit tower at the corner of East Fillmore Street and Central Avenue. This build has almost 29,000 SF of retail space on the ground floor and a wide range of amenities including the largest multifamily pool in Phoenix! Thank you to Layton Construction, LG Group, bKL Architecture LLC, BARNOLI & SONS CONCRETE INC, and CalPortland for being strong partners on this exciting project! #SuntecConcrete
-
Suntec Concrete reposted this
THE BASE keeps getting better! Buildings 1 through 7 are looking great and ready for your tenants! This ±144 acre industrial campus offers innovative building design, heavy power, up to 36' clear heights, dock-high and grade-level loading, trailer parking and outside storage. Contact me at 602.735.5370 or Luke Krison at 602.735.5538. Luke Krison Rose Krison Cindi Salvatore Alex Boles Danny Plapp Rodney C. Boden Mikele Keiffer Alex Briestensky ViaWest Group Suntec Concrete #industrialbuildings #industrialbuilding #industrialdevelopment #Phoenixindustrial
-
It's hard to imagine these photos were taken just two months ago. Now, Grand Canyon University's Gila River Apartments are fully poured out and on track to house students by the Fall of 2025. Gila River will be GCU's 18th dormitory complex, and our team on-site was recordable-free with no dropped objects for the entire five months of construction. With a total of 5,257 cubic yards of concrete poured, this structural podium project will have 7 levels in total. Thank you to our incredible team of partners. We couldn't do this without the expert collaboration with Pono Construction LLC, suoLL architects, PK Associates Structural Engineers, AZ Materials, CMC (Commercial Metals Company), and Orco Steel, LLC. #GCU #SuntecConcrete
-
The Suntec Engineering & Design team prides itself on innovative solutions. So, when a major semiconductor manufacturer client in Boise, ID faced challenges with its original precast wall design, we stepped in with an alternative solution. Leveraging our expertise, we introduced a concept previously completed by Suntec and Director of Engineering Valerie Granger, P.E., S.E., called "super tilts"— extremely tall, heavy, site-cast tilt panels that weigh up to 500,000 lbs and reach 52' in height. This design-build solution replaced the precast walls with site-cast panels and ensured the necessary structural integrity. Collaborating closely with the project Engineer of Record and precast designers, we delivered a seamless and efficient construction process, proving once again that at Suntec, we help build successful projects. #SuntecConcrete #SuntecEngineeringDesign
-
Wishing everyone a safe and joyful celebration this Independence Day! May we all embrace the spirit of freedom today and always. #SuntecConcrete
-
For this week's #TiltUpTuesday, we're showcasing Suntec's latest project, Pima DC1. This 300,000 SF Phoenix-based distribution center is made of 100 tilt panels and over 13,300 cubic yards of concrete poured. This state-of-the-art facility will be a great industrial addition to the City of Phoenix. Thank you to our incredible partners for helping drive this project forward: Prologis, Willmeng Construction, Inc., JLL, HPA Architecture Ltd, AZ REBAR CONSTRUCTION, Encore Steel, Inc., Panelized Structures, Inc., and Bragg Companies. #SuntecConcrete #Arizona
-
In April, Suntec Concrete won The Olympiad fundraiser, hosted by The Saguaros Children's Charities and Brokers for Kids, and was awarded the Broker's Cup! This competition supports Boys Hope Girls Hope and multiple other charities around the Valley. Before our team competed in lawn games and spent the day in the outfield at Scottsdale Stadium, we raised funds for this incredible cause to bring us to the finish line. This annual event is an amazing opportunity to team up with partners, clients, and friends in the commercial real estate industry! Thank you to all who contributed to the success of this event! #SuntecConcrete
-
It's #TiltUpTuesday! Marbella Northern Parkway Phase 1 is well underway, adding to the industrial mix in the West Valley. With 28,000 cubic yards poured, totaling 290 tilt panels, Suntec has completed the lifts in Glendale, AZ. The project will also feature cutting-edge office and warehouse space. With three buildings on the 51-acre property, this development will offer over 445,000 SF of innovative and functional industrial space. Thank you, Desert Ready Mix, Suncoast Post-Tension, Ltd., Black Iron Steel LLC, Wespac Construction, Ware Malcomb, and TLCP Structural, Inc for being such strong industry partners! #SuntecConcrete