Project Highlight: Murray-Massenburg Elementary School - 134,000 sq ft, three-story new school - Location: Durham, North Carolina - SPC was responsible for the mechanical aspects of this project which included: 11 rooftop air handlers, 2 air cooled chillers, 2 boilers, 8 pumps, 38 exhaust fans, 5,500 ft of carbon steel pipe, 10,000 ft of copper pipe and 170,000 lbs of sheet metal - Welcomed 800 students in August 2024! Durham Public Schools 🏫🍎 GC: LeChase Construction Architect: EVOKE Studio Architecture, PLLC SGS Contracting #construction #education #mechanical #hvac #durham #northcarolina #prefab #bim #piping #teamwork #onespc
-
7