BEXEL Manager is the most comprehensive #BIM project management solution, enabling unique intelligent construction planning and management. The long list of BEXEL Manager feature sets includes: - #openBIM Interoperability - Geometry Optimization - Model Data Verification & IDS Checks - Advanced Data Enrichment & Management - #AI-powered Data Analysis - Clash Detection - Automated Quantity Takeoffs - Cost Estimation & Management - Custom Element-cutting - Unique Smart Scheduling & Planning - Schedule Optimization & Line of Balance Analysis - Resource Planning & Optimization - 4D/5D Construction Simulation - Schedule Look-ahead Planning - #BCF Team Collaboration, Approvals and Communication - BIM Progress Monitoring & Reporting - Interactive BIM Dashboards Generation - Knowledge-base Facilitating Automation BEXEL Manager in synergy with BEXEL #CDE provides an outstanding integrated BIM environment that empowers data-driven project management and informed decision-making.
BEXEL Manager
Software Development
International, - 60,764 followers
Building the future of digital construction together
About us
BEXEL Manager is a game-changer in the construction industry that integrates the most important 3D/4D/5D uses of BIM technology. Including design and data review and analyses, quantity takeoffs, clash detection, 4D schedule management, 5D cost estimations, innovative 4D/5D construction planning processes, change management, value engineering, and facility management BEXEL Manager is designed to meet major construction management needs, changing the perspective of integrated project management. Building the future of digital construction together. BEXEL Manager is based on 3D Building Information Modeling and VDC technologies. Advanced visualization and the ability to handle, analyze and simplify complex project data yield benefits to all project stakeholders, by enabling intelligent decisions based on an abundance of precise and timely information through customized reporting. Using smart 4D/5D workflow for construction planning processes, BEXEL Manager helps in the execution and coordination of complex construction tasks, management of subcontractors, resources, changes, and procurement, as well as 6D facility maintenance once the project is constructed. An intelligent update engine is designed to maintain frequent model changes during the complete project life cycle. Facility management (6D BIM) offers detailed as-built models enriched with documentation, drawings, certificates, warranties, maintenance manuals, etc., as well as planning, scheduling, and budgeting engine for analyzing maintenance dynamics and costs. Product overview: https://bexelmanager.com/
- Website
-
https://bexelmanager.com/
External link for BEXEL Manager
- Industry
- Software Development
- Company size
- 51-200 employees
- Headquarters
- International, -
- Founded
- 2005
- Specialties
- BIM , VDC, construction, 3D coordination, 4D/5D construction management, 6D facility maintenance, clash detection, IFC, BCF, and BIM integrated platform
Locations
-
Primary
International, - -, SI
Employees at BEXEL Manager
Updates
-
We are proud to share amazing new features introduced with the new release of BEXEL Manager 24 and #BEXEL #CDE! Streamlined project management has never been easier with more flexibility and unprecedented model optimization, allowing advanced project planning, monitoring, and management workflows within an integrated #BIM environment. Some of the BEXEL Manager's new features include: - Geometry cutting option is enabled! Configure geometry splitting by storey, global coordinates, along elements and more; - BCF.Server for BEXEL Manager is here, enabling team collaboration and communication with all BCF functionalities from BEXEL CDE (issues, document approvals, discussions, document sets, related documents, tags, notifications, etc.); - New Color-coded Schedule Delay Analysis Power BI dashboard is introduced providing detailed progress monitoring insights and planned vs actual status; - Configurable geometry optimization reducing option level of detail to enable smooth work with large models; - New geometry-based Calculated Properties are introduced; - Newly released IDS 1.0 support is introduced; - Optimized properties publishing to BEXEL CDE, with flexible property sets selection; - The number of improvements of BEXEL CDE Publisher that provide more flexibility; - and many more. Some of BEXEL CDE's new features include: - Introduced Data Verification (IDS) Checks results review with advanced selection and color-coding options; - Enabled sorting functions on Cost and QTO/CBS modules' - Introduced DocumentSet issue type on BEXEL BCF.Server for notifying colleagues; - BCF.Server Comments section is improved for better user experience and communication; - Improved Drag&Drop method for uploading files and folder structure to BEXEL Docs; - Improved BEXEL Docs performance for large documentation packages upload and download; - and many more. Building the future of digital construction together!
-
Explore the key steps for creating integrated 4D/5D simulations and analyses for the National Football Stadium using BEXEL Manager and BEXEL #CDE, completed in just two weeks from a fully #BIM based model: Day 1: • Revit to BEXEL Publish • Preliminary model review Day 2: • Elements Slicing and Landscape Modeling Day 3: • Automated BIM Data Enrichment • QTO and CBS creation • Automated Cost Database creation and fine-tuning Day 4: • Definition of Zones and Sub-zones • Utilisation of existing Construction Methodology for Stadiums Day 5: • Automated Detailed Schedule Generation • Construction Schedule Evaluation • Team Planning Day 6: • Meeting Project Milestones • Automated Activity Leveling • LOB Chart Optimization • Construction Animation fine-tuning Day 7: • Automated Enrichment with additional Schedule Data • Creation of QTO and CBS based on Schedule Data • Publish Model, Analyses and Simulations to BEXEL CDE Day 8: • Publish standard Power BI dashboards • Publish customized Power BI dashboards Day 9: • Video Production – creation of source video materials Day 10: • Video Production – video editing and fine-tuning • Integration of Expo and NFS projects What was created: Week1: •Federated model with 107,556 elements in BEXEL Manager • Over 2,000 elements that were split into smaller segments • 172,440 classification property values added with Data Enrichment tool • 1,367 automatically generated cost items in BEXEL Manager Cost Editor • 118,311 quantity calculations • Automatically Generated schedule with 2,952 tasks and 3,935 relations in BEXEL Manager • 4 different construction schedule versions with different what-if scenarios Week 2: • 980,268 schedule-related property values added using BEXEL API scripts • 15 different Custom breakdowns and Quantity Takeoffs created and published to BEXEL CDE • 6 versions of construction schedule published on BEXEL CDE • 12 Power BI dashboards created and added to BEXEL CDE • Over 30 video clips were created and used for the final showcase video
-
The Future Trends in the Construction Industry Conference, hosted by the Association of Consulting Engineers of Serbia (ACES), has officially started! It’s a great honor to be part of this amazing regional event, which features great speakers and provides a valuable platform to examine new digital tools and advancements in the construction industry. We look forward to sharing ideas that will improve efficiency and promote a better future in our sector. Great job Nikola Vladislav Matic Nikola Pavlovic Bojan Dinic Dragana Cukic Branislav Simovic Jelena Cvetković and the entire team! #acesFutureTrends
-
2
-
With BEXEL Manager’s advanced 4D/5D planning engine, evaluating various project scenarios is faster than ever, even from the early design stages. Quickly generate and assess multiple what-if analyses to ensure optimal project scheduling and resource allocation. #BIM #ConstructionPlanning
-
Our CEO Mr. Veljko Janjic's lecture is starting soon at buildingSMART International Summit in Marrakesh. Hear about the latest advancements in integrated #BIM project management and how to make the most of #openBIM data with innovative BEXEL Manager and BEXEL #CDE workflows. #bssMarrakesh24
-
Streamline and optimize your construction planning with the smart 4D/5D environment in BEXEL Manager. Generate dynamic, color-coded #simulations that deliver immediate visual insights for projects of any scale, phase, or #BIM model complexity. Empower your project team with real-time analysis and data-driven decisions!
-
Ensure project success with BEXEL Manager's 4D/5D scheduling engine. Visualize your monthly look-ahead with color-coded simulations for full control over every detail and stay ahead in your project planning. #BIM #ConstructionManagement
BEXEL Manager - Monthly Look Ahead
-
Explore the key steps in developing integrated 4D/5D simulations and analyses for the National Football Stadium with BEXEL Manager and BEXEL #CDE, completed in just two weeks: Day 1: • Revit to BEXEL Publish • Preliminary model review Day 2: • Elements Slicing and Landscape Modeling Day 3: • Automated BIM Data Enrichment • QTO and CBS creation • Automated Cost Database creation and fine-tuning Day 4: • Definition of Zones and Sub-zones • Utilisation of existing Construction Methodology for Stadiums Day 5: • Automated Detailed Schedule Generation • Construction Schedule Evaluation • Team Planning Day 6: • Meeting Project Milestones • Automated Activity Leveling • LOB Chart Optimization • Construction Animation fine-tuning Day 7: • Automated Enrichment with additional Schedule Data • Creation of QTO and CBS based on Schedule Data • Publish Model, Analyses and Simulations to BEXEL CDE Day 8: • Publish standard Power BI dashboards • Publish customized Power BI dashboards Day 9: • Video Production – creation of source video materials Day 10: • Video Production – video editing and fine-tuning • Integration of Expo and NFS projects What was created: Week1: •Federated model with 107,556 elements in BEXEL Manager • Over 2,000 elements that were split into smaller segments • 172,440 classification property values added with Data Enrichment tool • 1,367 automatically generated cost items in BEXEL Manager Cost Editor • 118,311 quantity calculations • Automatically Generated schedule with 2,952 tasks and 3,935 relations in BEXEL Manager • 4 different construction schedule versions with different what-if scenarios Week 2: • 980,268 schedule-related property values added using BEXEL API scripts • 15 different Custom breakdowns and Quantity Takeoffs created and published to BEXEL CDE • 6 versions of construction schedule published on BEXEL CDE • 12 Power BI dashboards created and added to BEXEL CDE • Over 30 video clips were created and used for the final showcase video
-
With BEXEL Manager's intelligent 4D/5D planning engine, fast and data-rich schedule simulations can be generated even from the initial concept design phase. Plan every step within an integrated #BIM environment to make informed decisions early, improving both efficiency and quality. With color-coded visualizations by any model attribute, every detail is under control, ensuring seamless #construction management and optimization of timelines and resources.
BEXEL Manager - 4D/5D Construction simulation in early project phase