Thanks to the 2022 Bond, Beaver Acres Elementary School is getting an upgrade – a brand-new track! Located at the back of the school, the track will provide a great space for students to stay active. As we work on bringing this new track to life, we've temporarily closed off a section of the field where construction is underway. Signs and fences are in place to mark the designated area. Thank you for your cooperation and understanding. For more information, visit the school’s bond website: https://lnkd.in/ggCYqpNM #BelongBelieveAchieve #BSDbond
Beaverton School District
Primary and Secondary Education
Beaverton, Oregon 6,778 followers
WE innovate. WE expect Excellence. WE embrace equity. WE collaborate.
About us
Beaverton School District is the third largest district in Oregon, serving nearly 39,000 students and employing 4,600 professionals. We empower all students to achieve post-high school success.
- Website
-
https://www.beaverton.k12.or.us/Pages/home.aspx
External link for Beaverton School District
- Industry
- Primary and Secondary Education
- Company size
- 1,001-5,000 employees
- Headquarters
- Beaverton, Oregon
- Type
- Educational
Locations
-
Primary
16550 SW Merlo Rd
Beaverton, Oregon 97003, US
-
Employees at Beaverton School District
Updates
-
Beaverton School District reposted this
“What we did right,” Superintendent Gustavo Balderas, D.Ed. of Beaverton School District said after a previous successful bond campaign, “was involving the board and the community right from the onset of everything we were doing. It is exhausting, but it’s the right work because of the benefit to kids.” Congratulations to Superintendent Balderas on being sworn in this week as the 2024-25 president of AASA, The School Superintendents Association! You can read more about his leadership in The Five Stage Bond Campaign:
-
Curious about what's happening at Mountain View Middle School this summer? Here's an inside look at the work being done to enhance the safety and structural integrity of the building. https://lnkd.in/gDuF3Dat #BelongBelieveAchieve #BSDbond
-
Exciting Updates for Whitford Middle School 🚧 Thanks to the 2022 Bond, we're constructing a new wall between the two counselor offices. This enhancement will provide more privacy and confidentiality during counseling sessions, helping to create a space that fosters growth and success for every student at the school. For more information, visit the school’s bond website: https://lnkd.in/geCkAma5 #BelongBelieveAchieve #BSDbond
-
Renovations are underway this summer at Ridgewood Elementary School, thanks to the 2022 Bond. Here are photos of the ongoing construction progress in the front office and the curriculum storage room. Crews are updating the main office layout with new furniture, partial removal of the interior brick wall and a paint refresh. For more information, visit the school’s bond website: https://lnkd.in/geCkAma5 #BelongBelieveAchieve #BSDbond
-
🚧 Construction Update at Five Oaks Middle School! 🚧 We’re happy to report the latest progress on our ongoing improvements at Five Oaks Middle School 🛠️ Here’s an inside look at the many renovations being done to the school — new roof construction, along with new seismic interior upgrades being done to the gyms, upper classrooms and girls' locker room. These new renovations and essential reinforcements will ensure a safer and more stable environment for our students and staff. This critical work is a key part of our commitment to maintaining a secure and resilient learning space. For more information, visit the school’s bond website: https://lnkd.in/geCkAma5 #BelongBelieveAchieve #BSDbond
-
Beaverton School District reposted this
We're proud to power the future of student transportation with TRATON GROUP. Check out how Beaverton School District is leading the charge by integrating IC Bus Electric CE Series school buses into their fleet.
Powering the future of student transport with IC Bus and Navistar Inc! 🔋🚍 We're thrilled to kick off our #TRATONGROUP Customer Electrification Journeys series, showcasing real-world examples that prove #electric trucks and buses are already a reliable and effective solution. 🌟 Our first spotlight is on the Beaverton School District in Oregon, a true leader in #sustainable transportation. As of August 2023, they have integrated 24 IC Bus Electric CE Series school buses into their fleet. With 26 more units on order and a target of 80 electric buses by the end of 2025, they are setting a powerful example in #electrification. “We are very pleased with our IC Bus EV units. They have proven to be dependable, easy to operate, and have exceeded our expectation", said Craig Beaver, Administrator for #Transportation with the Beaverton School District. The district's commitment to eco-friendly #transport is a game-changer, providing reliable and efficient service for over 28,000 students daily, and covering more than 3,000,000 miles annually. 🌍🚍 Stay tuned for more success stories proving that #ElectricVehicles are the future of transportation! #TRATONElectrifies #GreenTech #TransformingTransportationTogether
-
We're thrilled to share a sneak peek of the ongoing renovations of the restrooms across from the auditorium at Aloha High School. Thanks to the 2022 Bond, these updates are bringing much-needed improvements to the school facilities. Check out the progress photo below and stay tuned for more updates as we continue to enhance our learning environment! For more information, visit the school's bond website: https://lnkd.in/gHPWx7Yq #BelongBelieveAchieve #BSDbond
-
📽️ Check out this incredible time-lapse video of the new HVAC system installation. Watch as a crane expertly lifts the massive HVAC unit. This upgrade will ensure a more comfortable and energy-efficient environment for students and staff. https://lnkd.in/g-EAhBMp #BelongBelieveAchieve #BSDbond
-
Beaverton School District reposted this
Exciting news! CIDA is designing two brand-new 2,160 sq ft buildings for BSD Mountainside High School's baseball and softball programs. These single-story batting cage facilities will be conveniently located between the existing baseball fields, enhancing their athletic program. Stay tuned for updates! ⚾🏫 #BSDMountainside #HighSchoolSports #NewFacilities #CIDA #CIDAinc #architecture #structuralengineering #interiordesign Perlo Construction Beaverton School District