Update 15/08/24: Mobilised as the OCR for IMPA on a OWF 'Technical Study' Survey off the…
Articles by Paul
Activity
-
This week, the GGS team has been following some exciting industry trends and updates. Here’s what’s caught our eye! 🔥 Wärtsilä has introduced its…
This week, the GGS team has been following some exciting industry trends and updates. Here’s what’s caught our eye! 🔥 Wärtsilä has introduced its…
Liked by Paul Turnbull Tech IOSH.
-
Think of the life you want to live before you think of the career you want. It goes without saying that "living comes before work." With that in…
Think of the life you want to live before you think of the career you want. It goes without saying that "living comes before work." With that in…
Liked by Paul Turnbull Tech IOSH.
-
I'm not sure if many of you here noticed that during the festive period of Deepavali, many malls chose to put up Halloween decorations instead in…
I'm not sure if many of you here noticed that during the festive period of Deepavali, many malls chose to put up Halloween decorations instead in…
Liked by Paul Turnbull Tech IOSH.
Experience
-
-
-
-
-
-
-
-
-
-
Education
-
Matthew Humberstone School Cleethorpes
-
UK Comprehensive
Licenses & Certifications
-
Cognitive Safety Coaching Course
Omniscient Safety Innovations Ltd
IssuedCredential ID OSI/CSCG/27112020 -
Offshore Safety Professionals Register Level 4
OSPR - The Offshore Safety Professionals Register
IssuedCredential ID 64088 -
Health and Safety Practical Application (A unit of the: NEBOSH National General Certificate in Occupational Health and Safety)
NEBOSH
IssuedCredential ID GC3/00223980/591080 -
NEBOSH National General Certificate in Occupational Health and Safety (with Credit)
NEBOSH
IssuedCredential ID 00223980/591615 -
Controlling Workplace Hazards (A unit of the: NEBOSH National General Certificate in Occupational Health and Safety)
NEBOSH
IssuedCredential ID GC2/00223980/571174 -
Management of Health & Safety (A unit of the: NEBOSH National General Certificate in Occupational Health & Safety)
NEBOSH
IssuedCredential ID NGC1/00223980/572296 -
STCW95 Reg VI/1 Para 2.1.4 ~ Personal Safety & Social Responsibilities
Maritime and Coastguard Agency
IssuedCredential ID Red Ensign Maritime Training Centre 1758 -
Proficiency in Security Awareness
Maritime and Coastguard Agency
Issued ExpiresCredential ID MCA SA 000219 -
Medical - Chester Step Test
Global Wind Organisation
Issued ExpiresCredential ID Dr Maria Giouzeli OGUK/2019/2602 -
Dental Fitness for Remote Area Operations
British Dental Association
Issued ExpiresCredential ID Dr Vinnicombe - ICC Building Dental Practice - Gibraltar GX11 1AA -
OG UK - MEDICAL CERTIFICATE OF FITNESS FOR OFFSHORE WORK
OPITO
Issued ExpiresCredential ID OGUK/2017/2442 - Dr Shelly - The College Clinic Ltd - Gibraltar GX11 1AA -
Seafarer Medical Certificate ENG 1
Maritime and Coastguard Agency
Issued ExpiresCredential ID 118781 - Dr Shelly - The College Clinic Ltd - Gibraltar GX11 1AA -
STCW95 Reg VI/1 Section A-VI/1 Para 2.1.3 ~ Elementary First Aid
Maritime and Coastguard Agency
Issued ExpiresCredential ID Red Ensign Maritime Training Centre 2093 -
BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING COURSE (5700) includes HUET & EBS approved by OPITO
OPITO
Issued ExpiresCredential ID 1357000302171142491 -
BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING COURSE (with CA EBS)(5750) includes HUET approved by OPITO
OPITO
Issued ExpiresCredential ID 1357500302171142490 -
ESCAPE CHUTE TRAINING in accordance with Norwegian Oil & Gas Association requirements
Petans Limited
Issued ExpiresCredential ID 1357000302171142491 -
STCW95 Reg VI/1 Section A-VI/1 Para 3 & 4 ~Updated Proficiency in Personal Survival Techniques
Maritime and Coastguard Agency
Issued ExpiresCredential ID MCA Certificate Number 004170 Petans Certificate Number 1135988 -
STCW95 Reg VI/1 Section A-VI/1 Para 3 & 4.2 ~Updated Proficiency in Fire Prevention & Fire Fighting
Maritime and Coastguard Agency
Issued ExpiresCredential ID MCA Certificate Number 004169 Petans Certificate Number 1135963 -
Russian Federation Multi-Entry Business Visa
Ministry of Foreign Affairs of the Russian Federation
Issued ExpiresCredential ID 23 9660169 22.03.19 / 09.03.20 -
Offshore Emergency Response Team Member (OERTM) (4500)
OPITO
Issued ExpiresCredential ID 47724500210717015
Volunteer Experience
-
Medic / Project Leader
Raleigh International (Namibia 1992)
- 4 months
Took part in a three month expidition to Namibia as a project team field medic.
-
Committee Member
IOSH Offshore Group
- Present 8 years 10 months
Science and Technology
Joined the committee on a voluntary basis as I am passionate about Health, Safety and Environmental Management, particularly in my specialist field. Which is offshore in the Oil and Gas Industry on board ocean going survey vessels.
I believe that IOSH is the best media to utilise and encourage that enthusiasm and while serving on the committee I hope in conjunction with the other members to stimulate debate on issues and concerns voiced by the offshore community as a whole. To then…Joined the committee on a voluntary basis as I am passionate about Health, Safety and Environmental Management, particularly in my specialist field. Which is offshore in the Oil and Gas Industry on board ocean going survey vessels.
I believe that IOSH is the best media to utilise and encourage that enthusiasm and while serving on the committee I hope in conjunction with the other members to stimulate debate on issues and concerns voiced by the offshore community as a whole. To then consider the new developments and improvements in HSSE and Safety Coaching. So that we can publicise and promote them within the offshore community as widely as possible through mediums like Linked-In
Thoroughly enjoyed my time a volunteer on the committee and took a two year break when my commitments prevented me from devoting the time that the role deserved. Very pleased to be selected to serve again as from May 2020. -
Field Project Manager
NHS: Herefordshire Primary Care Trust
- 1 month
Health
FIELD PROJECT MANAGER – COVID-19 Treatment Facilities.
Took a phone call from a former Army colleague who is now the Chair of Primary Health Care (PHC) Trust in Hereford, UK asking if I could deploy within 4 hours to train and lead a team of NHS Clinicians to reconnoiter, select and pass for NHS Gold (Central Government Level) approval within 48 hours, two sites able to be converted to fifty bed overflow COVID-19 medical facilities. Unit Alpha to provide End of Life (EOL) care and unit…FIELD PROJECT MANAGER – COVID-19 Treatment Facilities.
Took a phone call from a former Army colleague who is now the Chair of Primary Health Care (PHC) Trust in Hereford, UK asking if I could deploy within 4 hours to train and lead a team of NHS Clinicians to reconnoiter, select and pass for NHS Gold (Central Government Level) approval within 48 hours, two sites able to be converted to fifty bed overflow COVID-19 medical facilities. Unit Alpha to provide End of Life (EOL) care and unit Bravo to provide Domicile Social Care. On arrival in Hereford on day one I wrote a reconnaissance reporting format and associated RAMS. Trained the five NHS Clinicians (Snr Dr & Nurses) in the methodology of reconnaissance of non-medical structures, for their suitability for conversion into bedded units (with all the required support services collocated wherever possible). Lead the reconnaissance team in field visits on day two of four locations in Hereford, subsequently selecting two. Compiled detailed Field Reports and presented the contents at NHS Silver (Area Trust Board Level) within the 48 hours required by NHS Gold. All reports approved at NHS Silver and submitted to NHS Gold for approval without alteration of the executive summary and recommendations. Day 3 through to 7, supported the stage two project team tasked with compiling detailed implementation plans for the conversion of the two sites. Duties include but not limited to daily liaison with 2 NHS Trust CEO’s Chair of PHC Group, Local Authority Heads of Departments and various other SME’s regarding all matters operational. Focal point during multiple site visits for the project team with clinical, infrastructure and estates SME’s and Contractors and the buildings owners’ representatives. On day eight handed over all my responsibilities to ‘full time’ NHS Trust Manager then commenced and completed 14 day self-quarantine period in Hereford before returning home.
Projects
-
Marine Purchasing Representative - Fugro YJP Surveyors 1 – Singapore (Tuas) Near-Shore Survey
-
Route survey for the installation of an offshore submarine fibre optic cable connecting Southeast Asia with Western Europe via the Middle East. The SEA-ME-WE 6 cable network design spans some 18,000km with initial landing points in 13 countries on 3 continents. The proposed System comprises some 20 Segments requiring survey operations to be split into: Deep-Water Bathymetric ‘MBES only’ WD >1000m WD Shallow-Water Bathymetric / Geophysical & Geotechnical surveys WD 15m to 1000m …
Route survey for the installation of an offshore submarine fibre optic cable connecting Southeast Asia with Western Europe via the Middle East. The SEA-ME-WE 6 cable network design spans some 18,000km with initial landing points in 13 countries on 3 continents. The proposed System comprises some 20 Segments requiring survey operations to be split into: Deep-Water Bathymetric ‘MBES only’ WD >1000m WD Shallow-Water Bathymetric / Geophysical & Geotechnical surveys WD 15m to 1000m Near-Shore Bathymetric / Geophysical & Geotechnical surveys WD <15m BMH, diver and topographic surveys of the landfall sites in the surroundings of each of the BMH’s. Geophysical spreads typically comprised of: SSS / SBP & Maggy. Geotechnical sampling comprised of CPT & Piston Cores with Vanden Grabs in locations of <10cm penetration. Stand-alone position reporting directly to the Chair of MWG & VERISUB Project Managers and other agencies within the Consortium. Duties include but not limited to: Daily liaison with the SEA-ME-WE 6 project team and other agencies regarding the progress of survey in general and outlining any concerns that would delay operations, complicate the subsequent cable laying operations and repairs. Daily liaison with the offshore / on-site team regarding all matters operational and HSE ensuring they meet the usual industry expectations in efficient survey operations, online/offline QC. Reviewing the contractors Bathymetric, Geophysical and Geotechnical Data Sets, their GAP Analysis and Route Development reports. Auditing of the survey contractors project documents. Ensuring agreed transmission of digital data backloads. Unannounced HSE compliance checks & safety observation duties. Safety coaching on complacency and avoidable incidents reduction, fatigue management assessments etc. Periodic monitoring and review with the vessel executive team and supervisors of JSA’s and RA / Operational procedures etc.
-
Marine Purchasing Representative - SubCom Ocean Surveyor – Mediterranean & Red Sea Gulf of Aden - Deep-Water & Shallow-Water Surveys
-
Route survey for the installation of an offshore submarine fibre optic cable connecting Southeast Asia with Western Europe via the Middle East. The SEA-ME-WE 6 cable network design spans some 18,000km with initial landing points in 13 countries on 3 continents. The proposed System comprises some 20 Segments requiring survey operations to be split into: Deep-Water Bathymetric ‘MBES only’ WD >1000m WD Shallow-Water Bathymetric / Geophysical & Geotechnical surveys WD 15m to 1000m …
Route survey for the installation of an offshore submarine fibre optic cable connecting Southeast Asia with Western Europe via the Middle East. The SEA-ME-WE 6 cable network design spans some 18,000km with initial landing points in 13 countries on 3 continents. The proposed System comprises some 20 Segments requiring survey operations to be split into: Deep-Water Bathymetric ‘MBES only’ WD >1000m WD Shallow-Water Bathymetric / Geophysical & Geotechnical surveys WD 15m to 1000m Near-Shore Bathymetric / Geophysical & Geotechnical surveys WD <15m BMH, diver and topographic surveys of the landfall sites in the surroundings of each of the BMH’s. Geophysical spreads typically comprised of: SSS / SBP & Maggy. Geotechnical sampling comprised of CPT & Piston Cores with Vanden Grabs in locations of <10cm penetration. Stand-alone position reporting directly to the Chair of MWG & VERISUB Project Managers and other agencies within the Consortium. Duties include but not limited to: Daily liaison with the SEA-ME-WE 6 project team and other agencies regarding the progress of survey in general and outlining any concerns that would delay operations, complicate the subsequent cable laying operations and repairs. Daily liaison with the offshore / on-site team regarding all matters operational and HSE ensuring they meet the usual industry expectations in efficient survey operations, online/offline QC. Reviewing the contractors Bathymetric, Geophysical and Geotechnical Data Sets, their GAP Analysis and Route Development reports. Auditing of the survey contractors project documents. Ensuring agreed transmission of digital data backloads. Unannounced HSE compliance checks & safety observation duties. Safety coaching on complacency and avoidable incidents reduction, fatigue management assessments etc. Periodic monitoring and review with the vessel executive team and supervisors of JSA’s and RA / Operational procedures etc.
-
OCR Team Member - SEVEN NAVICA – HARBOUR ENERGY – UK (NORTH SEA) TOLMOUNT East 12"x 4km Pipelay
-
O&G Construction – Field Development – Tolmount East. Member of a five person OCR Team (Night Shift Survey Rep).
Phase 1 - Mobilisation & Pipeline Spooling (Subsea7 Virga Spool base in Norway) inc. vessel mobilisation, pre-spooling checks and set up. Spooling of pipeline to Seven Navica main reel and straightening trials. Phase 2 - Transit, DP trials, Pre-lay survey, and Harbour Energy Verification checks. Phase 3 - Anchor installation & load test at Tolmount East, Pipeline initiation and…O&G Construction – Field Development – Tolmount East. Member of a five person OCR Team (Night Shift Survey Rep).
Phase 1 - Mobilisation & Pipeline Spooling (Subsea7 Virga Spool base in Norway) inc. vessel mobilisation, pre-spooling checks and set up. Spooling of pipeline to Seven Navica main reel and straightening trials. Phase 2 - Transit, DP trials, Pre-lay survey, and Harbour Energy Verification checks. Phase 3 - Anchor installation & load test at Tolmount East, Pipeline initiation and normal lay, Cutting to length, PLR Tie-In & Laydown at Tolmount MFP. Phase 4 - Post-lay survey, Flod, Clean and Gauge Ops, Anchor Recovery. Phase 5 = Transit to Leith, Scotland & demobilisation.
Duties include but not limited to: Jointly responsible for ‘sign off’ that the contractors correctly completed in port, and in field mobilisation of the vessel. Daily liaison with project team onshore and the onboard OCR team. Advising on / and ensuring the onboard survey team meet the usual industry expectations in efficient line running, online QC and survey operations in general. Reporting on their provisional interpretation of the various datasets & providing to the client my assessment on the quality of data being provided, and log keeping. Review the RAW & processed, positioning & navigational data to ensure compliance to the project specifications. GAP Analysis, Binning and re-shoot / in-fill plan as required. Conduct: Unannounced HSSE compliance checks and safety observation duties of the work site operations & periodic monitoring along with the vessel executive team and supervisors of JSA’s and RA / Operational procedures. -
Marine Purchasing Representative - SubCom Ocean Surveyor – Mediterranean Sea - Deep-Water & Shallow-Water Surveys
-
Route survey for the installation of an offshore submarine fibre optic cable connecting Southeast Asia with Western Europe via the Middle East. The SEA-ME-WE 6 cable network design spans some 18,000km with initial landing points in 13 countries on 3 continents. The proposed System comprises some 20 Segments requiring survey operations to be split into: Deep-Water Bathymetric ‘MBES only’ WD >1000m WD Shallow-Water Bathymetric / Geophysical & Geotechnical surveys WD 15m to 1000m …
Route survey for the installation of an offshore submarine fibre optic cable connecting Southeast Asia with Western Europe via the Middle East. The SEA-ME-WE 6 cable network design spans some 18,000km with initial landing points in 13 countries on 3 continents. The proposed System comprises some 20 Segments requiring survey operations to be split into: Deep-Water Bathymetric ‘MBES only’ WD >1000m WD Shallow-Water Bathymetric / Geophysical & Geotechnical surveys WD 15m to 1000m Near-Shore Bathymetric / Geophysical & Geotechnical surveys WD <15m BMH, diver and topographic surveys of the landfall sites in the surroundings of each of the BMH’s. Geophysical spreads typically comprised of: SSS / SBP & Maggy. Geotechnical sampling comprised of CPT & Piston Cores with Vanden Grabs in locations of <10cm penetration. Stand-alone position reporting directly to the Chair of MWG & VERISUB Project Managers and other agencies within the Consortium. Duties include but not limited to: Daily liaison with the SEA-ME-WE 6 project team and other agencies regarding the progress of survey in general and outlining any concerns that would delay operations, complicate the subsequent cable laying operations and repairs. Daily liaison with the offshore / on-site team regarding all matters operational and HSE ensuring they meet the usual industry expectations in efficient survey operations, online/offline QC. Reviewing the contractors Bathymetric, Geophysical and Geotechnical Data Sets, their GAP Analysis and Route Development reports. Auditing of the survey contractors project documents. Ensuring agreed transmission of digital data backloads. Unannounced HSE compliance checks & safety observation duties. Safety coaching on complacency and avoidable incidents reduction, fatigue management assessments etc. Periodic monitoring and review with the vessel executive team and supervisors of JSA’s and RA / Operational procedures etc. Author of segment or assignment SEA-ME-WE 6 internal reports.
-
OCR - GARDLINE OCEAN RELIANCE – HARBOUR ENERGY – UK (NORTH SEA)
-
O&G – Field Development – ‘Integrated 3D HRS Geophysical & Environmental’ Surveys. Primarily utilising integrated 3D HRS & Pseudo 3D HRS arrays along with towed and hull mounted analogue sensors (MBES, SBES, SSS Maggy, Pinger, Mini AG) across multiple sites.
Duties include but not limited to: Jointly responsible for ‘sign off’ that the contractors correctly completed in port, and in field mobilisation of the vessel. Daily liaison with: Harbour Energy / INOSYS Project Teams, Captain &…O&G – Field Development – ‘Integrated 3D HRS Geophysical & Environmental’ Surveys. Primarily utilising integrated 3D HRS & Pseudo 3D HRS arrays along with towed and hull mounted analogue sensors (MBES, SBES, SSS Maggy, Pinger, Mini AG) across multiple sites.
Duties include but not limited to: Jointly responsible for ‘sign off’ that the contractors correctly completed in port, and in field mobilisation of the vessel. Daily liaison with: Harbour Energy / INOSYS Project Teams, Captain & Party Chief regarding all matters operational and HSSE including SIMOPS avoidance with several vessels and agencies also working in the survey area. Control platforms OIM & Control Rooms, responsible for the timely completion of, renewal, extension, & suspension of PTW for 500m SEZ Ops. Onboard survey team ensuring they meet the usual industry expectations in efficient line running, online QC and survey operations in general. Onboard Lead of the MMO & PAMS Teams regarding mammal sightings and that log keeping to meet the JNCC requirements. Reporting Manager on their provisional interpretation of the various datasets & providing to the client my assessment on the quality of data being provided, and log keeping. Review: RAW & processed, positioning & navigational data to ensure compliance to the project specifications. GAP Analysis, Binning and re-shoot / in-fill plan, authorising those lines to be reacquired at the client’s expenses and ensuring those lines that failed QC because of technical issues are reacquired in a timely manner at the contractors’ expense.
Facilitating: Efficient interaction and transfer of processed data between the contractors off-line seismic processing team, and the client’s partner INOSYS ashore. Conduct: Unannounced HSSE compliance checks and safety observation duties of the work site operations & periodic monitoring along with the vessel executive team and supervisors of JSA’s and RA / Operational procedures. -
HSE & Safety Coaching – PORT OF LOWESTOFT – CEFAS & AWSM LIMITED – UK
-
HSE Adviser & Safety Coaching – ‘Vessel & Onshore Facilities’ Review, Assessment & Reporting.
Visits to a 78m Research Vessel (Cefas Endeavor) & her back-to-back crews. To an Onshore Logistic & Maintenance Base (Pinbush) & its staff. Review, assess both in regard to the collective attitude towards, general understanding of, and performance in HSE.
Cefas Endeavour Visits x2.
Provide:
A series of presentations on building and maintaining a positive and robust onboard ‘Safety…HSE Adviser & Safety Coaching – ‘Vessel & Onshore Facilities’ Review, Assessment & Reporting.
Visits to a 78m Research Vessel (Cefas Endeavor) & her back-to-back crews. To an Onshore Logistic & Maintenance Base (Pinbush) & its staff. Review, assess both in regard to the collective attitude towards, general understanding of, and performance in HSE.
Cefas Endeavour Visits x2.
Provide:
A series of presentations on building and maintaining a positive and robust onboard ‘Safety Culture’.
‘Safety Coaching Sessions’ to ascertain the current understanding by the leadership onboard of the vessel Safety Management System (SMS) and its use.
‘Safety Observer Sessions’ for assessment of, and feedback on the quality of lifting operations, undertaken by the crew as part of a series of lifts for a scheduled demobilisation.
Guidance to, and oversite of, a joint Cefas and AWSML SQEP Team.
Pinbush Facility Visit.
Utilising coaching principles:
Obtain from the workforce their understanding of AWSML requirements for them to, receive, storage and maintenance of, and preparation for / outload of equipment’s in support of Cefas survey operations.
Obtain from the site management their requirements of the workforce to, receive, store, and maintain, and prepare for / outload equipment’s.
Provide a series of presentations on building and maintaining a positive and robust ‘Operational Awareness & Safety Culture’ to ascertain the current level of the workforce involvement in site both.
No formal auditing or regulatory assessment was to be undertaken although the provision of a consultant report within 7 days of the vessel and site visits, with any recommendations for improvement was to be provided.
Specifically, for the Pinbush site, the consultant's assessment of the site operations, housekeeping, and layout. Along with the workforce understanding of their individual roles compared to AWSML requirements outlining any contradictions were to be added. -
Purchasing Representative - Meo Endeavour – Java and Celebes Sea
-
Stand-alone position reporting directly to the BIFROST and VERISUB Project Managers and other agencies within the Consortium. Geographically this project have been focused on BU Davao to BMH Singapore, with landings in Indonesia, and multiple BU's in between. Survey operations can be broadly split into the two categories. Shallow Water (SW) segments, Bathymetric, Geophysical & Geotechnical surveys (15m to 1500m WD utilising MBES, SSS, SBP, Magnetometer, CPT and Gravity Coring). Deep Water (DW)…
Stand-alone position reporting directly to the BIFROST and VERISUB Project Managers and other agencies within the Consortium. Geographically this project have been focused on BU Davao to BMH Singapore, with landings in Indonesia, and multiple BU's in between. Survey operations can be broadly split into the two categories. Shallow Water (SW) segments, Bathymetric, Geophysical & Geotechnical surveys (15m to 1500m WD utilising MBES, SSS, SBP, Magnetometer, CPT and Gravity Coring). Deep Water (DW) Bathymetric route survey racking some 6000 line KM and associated Route Development (RD) areas where slope angles and seabed topography raised concerns and required further investigation. Duties include but not limited to: Daily liaison with the BIFROST Project Team and other agencies regarding the progress of survey in general and outlining any concerns that would delay operations, complicate the subsequent cable laying operations and repairs. Daily liaison with the Vessel Project Team regarding all matters operational and HSSE ensuring they meet the usual industry expectations in efficient survey operations, online and offline QC as well as survey equipment recovery and deployments and operations. Reviewing the contractors Bathymetric, Geophysical and Geotechnical Data Sets, their GAP Analysis and Route Development reports. First line auditing of the survey contractors project DPR, particularly in relation to timings, ensuring survey elements that failed QC because of technical issues are noted and reacquired in a timely manner at the contractors’ expense. Ensuring agreed transmission of digital data backloads, to third-parties. Unannounced HSSE compliance checks and safety observation duties of the work site operations. Safety coaching on complacency and avoidable incidents reduction, fatigue management assessments etc. Periodic monitoring and review with the vessel executive team and supervisors of JSA’s and RA / Operational procedures.
-
Offshore Supervisor - RV OCEAN RESEARCHER - Ørsted – Eastern Seaboard of USA
-
OWF - Development – ‘Geophysical, Geotechnical & Environmental’ Surveys. Continuation of my assignments for this client in 2020 on their all-encompassing and ongoing survey campaigns involving multiple vessels, off the Eastern seaboard of the United States of America.
Stand-alone position of Offshore Supervisor on a vessel mobilised to acquire Integrated Geophysical datasets utilising both a towed array (M-UHRS, S-UHRS, SSS, GRAD Frame) and a hull mounted (SBP & MBES) sensor suites…OWF - Development – ‘Geophysical, Geotechnical & Environmental’ Surveys. Continuation of my assignments for this client in 2020 on their all-encompassing and ongoing survey campaigns involving multiple vessels, off the Eastern seaboard of the United States of America.
Stand-alone position of Offshore Supervisor on a vessel mobilised to acquire Integrated Geophysical datasets utilising both a towed array (M-UHRS, S-UHRS, SSS, GRAD Frame) and a hull mounted (SBP & MBES) sensor suites. Reporting directly to the Ørsted Project Manager and Senior Geophysicist. -
Purchasing Representative - RV FUGRO DISCOVERY - BIFROST – Western Pacific
-
Subsea Infrastructure – Fibre Optic Cables – ‘Bathymetric, Geophysical, & Geotechnical’ Surveys.
Western Pacific segment between Guam and the Philippines including a topographical survey of the lagoon in Guam and the proposed Beach Manhole Position. Bathymetric, Geophysical and Geotechnical surveys of three SW segments (15m to 1500m WD utilising MBES, SSS, SBP, Magnetometer, CPT and Gravity Coring) totaling some 230 km. DW Bathymetric route survey of around 2400 km. Stand-alone position…Subsea Infrastructure – Fibre Optic Cables – ‘Bathymetric, Geophysical, & Geotechnical’ Surveys.
Western Pacific segment between Guam and the Philippines including a topographical survey of the lagoon in Guam and the proposed Beach Manhole Position. Bathymetric, Geophysical and Geotechnical surveys of three SW segments (15m to 1500m WD utilising MBES, SSS, SBP, Magnetometer, CPT and Gravity Coring) totaling some 230 km. DW Bathymetric route survey of around 2400 km. Stand-alone position reporting directly to the BIFROST and VERISUB Project Managers and other agencies.
Duties include but not limited to: Daily liaison with the BIFROST Project Team and other agencies regarding the progress of survey in general and outlining any concerns that would delay operations, complicate the subsequent cable laying operations and repairs. Daily liaison with the Vessel Project Team regarding all matters operational and HSSE ensuring they meet the usual industry expectations in efficient survey operations, online and offline QC as well as survey equipment recovery and deployments and operations. Coordinating the providing onboard liaison between the ASN Client Representative and the BIFROST Project Management Team. Reviewing the contractors Bathymetric, Geophysical and Geotechnical Data Sets, their GAP Analysis and Route Development reports. First line auditing of the survey contractors project DPR, particularly in relation to timings, ensuring survey elements that failed QC because of technical issues are noted and reacquired in a timely manner at the contractors’ expense. Ensuring agreed transmission of digital data backloads, to third-parties. Unannounced HSSE compliance checks and safety observation duties of the work site operations. Safety coaching on complacency and avoidable incidents reduction, fatigue management assessments etc. Periodic monitoring and review with the vessel executive team and supervisors of JSA’s and RA / Operational procedures. -
Dual Role – Survey QC & HSE Support – RV OCEAN RESEARCHER - Ørsted – East Coast of USA
-
OWF - Development – ‘Geophysical, Geotechnical & Environmental’ Surveys. Stand-alone position of Offshore Supervisor on a vessel mobilised to acquire Integrated Geophysical datasets (Towed array S-UHRS, SSS, GRAD Frame & Hull mounted SBP & MBES) sensor suites. Reporting directly to the Ørsted Project Manager and Senior Geophysicist. Duties include but not limited to: Daily liaison with the onboard survey team ensuring they meet the usual industry expectations in efficient line running, online…
OWF - Development – ‘Geophysical, Geotechnical & Environmental’ Surveys. Stand-alone position of Offshore Supervisor on a vessel mobilised to acquire Integrated Geophysical datasets (Towed array S-UHRS, SSS, GRAD Frame & Hull mounted SBP & MBES) sensor suites. Reporting directly to the Ørsted Project Manager and Senior Geophysicist. Duties include but not limited to: Daily liaison with the onboard survey team ensuring they meet the usual industry expectations in efficient line running, online QC and survey operations in general. Ørsted QC of RAW and processed, positioning & navigational data. Discussing with the Reporting Manager their provisional interpretation of the SBP, SSS & GRAD Frame data, as well as providing general assessment on the quality of data sets being provided and of the contractors’ log keeping. Reviewing the GAP Analysis and re-shoot /in-fill plan, authorising those lines to be reacquired at the client’s expenses and ensuring those lines that failed QC because of technical issues are reacquired in a timely manner at the contractors’ expense. Daily liaison with the Ørsted Project Team, Captain & Party Chief regarding all matters operational and HSSE including SIMOPS avoidance with several vessels. Daily liaison with the onboard Lead Protected Species Officer regarding all mammal sightings and that log keeping meet the BOEM requirements. Ensured that current vessel procedures for mitigations and strike avoidance and are up to date and practiced on a regular basis. Safety coaching on complacency and avoidable incidents reduction, fatigue management assessments, and promotion of the Ørsted HSE expectations. Unannounced HSE compliance checks and safety observation duties of the work site operations. Periodic monitoring and review of JSA’s and RA / Operational procedures. Provided the Ørsted HSSE Team with a weekly contractors HSSE performance report and acted on their behalf as the Ørsted onboard lead in any incident reporting and investigation.
-
Dual Role – Survey QC & HSE Support – RV OCEAN RESEARCHER - Ørsted – East Coast of USA
-
OWF - Development – ‘Geophysical, Geotechnical & Environmental’ Surveys. Ongoing surveys involving multiple vessels. Stand-alone position of Offshore Supervisor (Client Rep) on a vessel mobilised to acquire the Multichannel Ultra High Resolution Seismic (M-UHRS) line plan, part of a multi-phase Geophysical & Environmental survey plan (Integrated towed array, M-UHRS, SSS, GRAD Frame, SBP & Hull mounted MBES, inc backscatter analysis)
Duties include but not limited to: Daily liaison with…OWF - Development – ‘Geophysical, Geotechnical & Environmental’ Surveys. Ongoing surveys involving multiple vessels. Stand-alone position of Offshore Supervisor (Client Rep) on a vessel mobilised to acquire the Multichannel Ultra High Resolution Seismic (M-UHRS) line plan, part of a multi-phase Geophysical & Environmental survey plan (Integrated towed array, M-UHRS, SSS, GRAD Frame, SBP & Hull mounted MBES, inc backscatter analysis)
Duties include but not limited to: Daily liaison with the survey team ensuring the usual expectations in line running and survey operations in general. Facilitating the efficient interaction between contractors M-UHRS processing team, and the clients third party M-UHRS analysis and interpretation company ashore. Ensuring agreed transmission of digital data backloads, to third-parties. Onboard QC of RAW and processed, positioning & navigational data to ensure compliance to the project specifications. Reviewing the contractors GAP Analysis and re-shoot /in-fill plan, authorising those lines to be reacquired at the client’s expenses and ensuring those lines that failed QC because of technical issues are also reacquired in a timely manner at the contractors expense. Discussing with the Rep Man their provisional interpretation of the SBP, SSS & GRAD Frame data, immediately notifying critical anomalies to the project team back in Europe, as well as providing general assessment on the quality of data sets being provided and of the contractors log keeping. Daily liaison with the Ørsted Project Team, Captain & Party Chief regarding all matters operational and HSSE including SIMOPS avoidance with several vessels and agencies also working in the survey area. Unannounced compliance checks and safety observation duties of the work site operations with safety coaching on complacency reduction and fatigue management assessments. Periodic monitoring and review of JSA’s and RA / Operational procedures and the overall contractors HSSE performance. -
Dual Role – Survey QC & HSSE Support – CSV BOKA CONSTRUCTOR - Nord Stream AG – Baltic Sea.
-
OWF - PRE-LAY - Cable Plough Survey.
1st May 2020; returned to the same third party PLR project for the near shore element, in the singleton, dual role of 'Nordstream AG Crossings Representative'. Reporting directly to clients engineers and managers in the Survey Inspection & Maintenance Team. Assisted with the PLR & Survey Procedures, Anchor Patterns and Risk Assessment & Method Statement (RAMS) review. Attended and contributing to the KOM video conference before embarking on the vessel…OWF - PRE-LAY - Cable Plough Survey.
1st May 2020; returned to the same third party PLR project for the near shore element, in the singleton, dual role of 'Nordstream AG Crossings Representative'. Reporting directly to clients engineers and managers in the Survey Inspection & Maintenance Team. Assisted with the PLR & Survey Procedures, Anchor Patterns and Risk Assessment & Method Statement (RAMS) review. Attended and contributing to the KOM video conference before embarking on the vessel on the 6th May 2020 to observe the field approval of the barge Anchor Management System, the Vertical Injector (VI) and Chain Trencher (CT) sea trials, along with the positioning and survey systems. Departed the vessel on the 25th May 2020 when the third party confirmed that all operations within the Nordstream AG SEZ and covered by the crossing agreement were completed.
Duties include but not limited to: Observation the preparations for, the placement of anchors, and the movement of the barge into the SEZ. Verification of the position of the VI in relation to my client’s assets prior to landing it on the seabed during all six of the required entries into the safety zone and the grade in and ploughing away from the two active gas lines. Ensuring that ploughing operations close to the assets are being conducted within the terms of crossing agreement, agreed procedures and RAMS. Daily liaison with Nordstream AG PM, Captain & Contractors (50 Hz & Boskalis) regarding all matters operational and HSSE within the SEZ. Focal point on the vessel for any Nordstream AG subsea infrastructure queries. Unannounced compliance checks and safety observation duties of the work site operations. Periodic monitoring and review of TBT’s and provide an assessment of the contractors HSSE performance.
-
Dual Role – Survey QC & HSSE Support – CSV NDURANCE - Nord Stream 2 – Baltic Sea
-
OWF - PRE-LAY - Cable Plough Survey.
Returned to the project in the singleton role of Nordstream 2 Crossings Representative. Joined a mobilised and operational vessel in anticipation of them moving into my client’s safety and exclusion zones. Completed positioning, Risk Assessment & Method Statement (RAMS) review and assessed the contractor’s procedures for deployments in the safety zone. Observed the preparations for, and movement of the vessel into safety zone, and then verified the…OWF - PRE-LAY - Cable Plough Survey.
Returned to the project in the singleton role of Nordstream 2 Crossings Representative. Joined a mobilised and operational vessel in anticipation of them moving into my client’s safety and exclusion zones. Completed positioning, Risk Assessment & Method Statement (RAMS) review and assessed the contractor’s procedures for deployments in the safety zone. Observed the preparations for, and movement of the vessel into safety zone, and then verified the position of the plough in relation to my client’s assets prior to landing it on the seabed, grading in and ploughing away. Remained onboard to confirm the same during all six of the required entries into the safety zone. Duties include but not limited to, daily liaison with Nordstream 2 PM, Captain & Contractors (50 Hz & Boskalis) regarding all matters operational and HSSE within the Nordstream 2 SEZ. Focal point on the vessel for any Nordstream 2 subsea infrastructure queries, as well as ensuring that ploughing operations close to the Nordstream 2 assets are being conducted within the terms of crossing agreement, agreed procedures and RAMS. Unannounced compliance checks and safety observation duties of the work site operations. Periodic monitoring and review of JSA’s and RA / Operational procedures and the overall contractors HSSE performance reporting directly to Nordstream 2 senior management ashore. Departed the vessel via CTV on day 14 when all operations within, and close to Nordstream 2 SEZ were completed.
-
OCR – Survey QC & HSSE Support – CSV BOKA FALCON - Nord Stream 2 – Baltic Sea
-
OWF PRE-LAY Cable Plough Survey.
Represented the onshore project team at the mobilisation in Mukran, Germany, attending and presenting at the KOM. Embarked on the CSV Boka Falcon to observe the field approval of the vessel (hull mounted & ROV) and SMD HD3 plough positioning and survey systems during offshore calibrations. Also observed the field approval of the ‘USBL Offset’ vessels, the MV Seazip 4 & MV Seazip Fix. Shuttled on/off by CTV to cover the singleton role of Nordstream 2…OWF PRE-LAY Cable Plough Survey.
Represented the onshore project team at the mobilisation in Mukran, Germany, attending and presenting at the KOM. Embarked on the CSV Boka Falcon to observe the field approval of the vessel (hull mounted & ROV) and SMD HD3 plough positioning and survey systems during offshore calibrations. Also observed the field approval of the ‘USBL Offset’ vessels, the MV Seazip 4 & MV Seazip Fix. Shuttled on/off by CTV to cover the singleton role of Nordstream 2 Crossings Representative.
Duties include but not limited to, daily liaison with Nordstream 2 PM, Captain & Contractors (50 Hz & Boskalis) regarding all matters operational and HSSE within the Nordstream 2 SEZ. Focal point on the vessel for Nordstream 2 subsea infrastructure queries, as well as ensuring that ploughing operations close to the Nordstream 2 assets are being conducted within the terms of crossing agreement, method statement and risk assessments. Unannounced compliance checks and safety observation duties of the work site operations. Periodic monitoring and review of JSA’s and RA / Operational procedures and the overall contractors HSSE performance reporting directly to Nordstream 2 senior management ashore.
-
OCR – Survey QC & HSSE Support – PLSV CALAMITY JANE - Nord Stream 2 – Baltic Sea
-
PIPE & CABLE LAY – Baltic Sea / Finland – Survey Support to Pipe Lay Vessel.
Returned to the project on day 70 to continue with the QC and field approval of the vessel daily production throughout TDM support to pipe laying operations through numerous curves, restricted lay areas and boulder fields. This phase of pipe lay also included some 17 other agencies, asset crossings and number of unknown cables, severed and otherwise. This required online QC of ROV video and MBES data and…PIPE & CABLE LAY – Baltic Sea / Finland – Survey Support to Pipe Lay Vessel.
Returned to the project on day 70 to continue with the QC and field approval of the vessel daily production throughout TDM support to pipe laying operations through numerous curves, restricted lay areas and boulder fields. This phase of pipe lay also included some 17 other agencies, asset crossings and number of unknown cables, severed and otherwise. This required online QC of ROV video and MBES data and reporting turnaround within the agreed timelines, 24-hours.
Duties include but not limited to, daily liaison with Nord Stream 2 PM, Captain & Contractors (Allseas) regarding all matters operational and HSSE. Daily liaison and permitting compliance notifications to Finnish Authorities (TW & EEZ). Daily liaison and SIMOPS avoidance with several vessels and agencies also working in the survey area. Unannounced compliance checks and safety observation duties of the work site operations with safety coaching presentations on complacency reduction and fatigue management assessments. Periodic monitoring and review of JSA’s and RA / Operational procedures and the overall contractors HSSE performance reporting directly to the NSP2 HSE manager ashore. Vessel demobilised in the field requiring the close out circa 90 days of project logs and reports and monitoring the contractor’s numerous offshore logistical activities, and I flew off on day 93.
-
OCR – Survey QC & HSE Support – PSV NORMAND POSEIDON - Nord Stream 2 – Baltic Sea
-
PIPE & CABLE LAY – Baltic Sea / Offshore Sweden – Survey Support to Pipe Lay Vessel.
Joined the onshore project team for the mobilisation in Tallinn, Estonia, attending and presenting at the KOM and conducted the clients HSSE Audit of the vessel.
Field approved the vessel positioning and survey systems (hull mounted & ROV) during offshore calibrations in Sweden.
QC’d and monitored the vessel daily production throughout the survey support to pipe laying operations (TDM, AS-Laid &…PIPE & CABLE LAY – Baltic Sea / Offshore Sweden – Survey Support to Pipe Lay Vessel.
Joined the onshore project team for the mobilisation in Tallinn, Estonia, attending and presenting at the KOM and conducted the clients HSSE Audit of the vessel.
Field approved the vessel positioning and survey systems (hull mounted & ROV) during offshore calibrations in Sweden.
QC’d and monitored the vessel daily production throughout the survey support to pipe laying operations (TDM, AS-Laid & PRE-LAY) in Sweden including ROV video stream to promptly report areas of critical free spans and positioning over mattress crossings belonging to other's subsea assets.
Duties include but not limited to, daily liaison with Nord Stream 2 PM, Captain & Contractors (Allseas) regarding all matters operational and HSSE. Daily liaison and permitting compliance notifications to Swedish Authorities (TW & EEZ). Daily liaison and SIMOPS avoidance with several vessels and agencies also working in the survey area. Unannounced compliance checks and safety observation duties of the work site operations. Safety coaching presentations on establishing a proactive and robust safety culture, complacency reduction and fatigue management assessments. Periodic monitoring and review of JSA’s and RA / Operational procedures and the overall contractors HSSE performance reporting directly to the NSP2 HSE manager ashore.
Crew Changed on day 14.
-
OCR – Survey QC & HSE Support – PLSV CALAMITY JANE - Nord Stream 2 – Baltic Sea
-
PIPE & CABLE LAY – Baltic Sea / Offshore Germany / Sweden / Finland – Survey Support to Pipe Lay Vessel.
Joined the onshore project team for the mobilisation in Ijmuiden, Netherlands, attending and presenting at the KOM.
QC’d and field approved x2 GVI surveys in Germany on Lines A & B, lay down heads following their exposure to the winter period.
QC’d and field approved the vessel positioning and survey systems (hull mounted & ROV) during offshore calibrations in Sweden…PIPE & CABLE LAY – Baltic Sea / Offshore Germany / Sweden / Finland – Survey Support to Pipe Lay Vessel.
Joined the onshore project team for the mobilisation in Ijmuiden, Netherlands, attending and presenting at the KOM.
QC’d and field approved x2 GVI surveys in Germany on Lines A & B, lay down heads following their exposure to the winter period.
QC’d and field approved the vessel positioning and survey systems (hull mounted & ROV) during offshore calibrations in Sweden.
QC’d and monitored the vessel daily production throughout TDM support to pipe laying operations including the temporary lay down and pick up of Line B (pipe laying vessel changeover) in Finland.
Duties include but not limited to, daily liaison with Nord Stream 2 PM, Captain & Contractors (Allseas) regarding all matters operational and HSSE. Daily liaison and permitting compliance notifications to German, Swedish and Finnish Authorities (TW & EEZ). Daily liaison and SIMOPS avoidance with several vessels and agencies also working in the survey area. Unannounced compliance checks and safety observation duties of the work site operations, safety coaching presentations on complacency reduction and fatigue management assessment. Periodic monitoring and review of JSA’s and RA / Operational procedures and monitored the contractors HSSE performance reporting directly to HSSE manager ashore.
Crew Changed on day 35.
-
OCR – Survey QC & HSE Support – Lubmin Office - Nord Stream 2 – Baltic Sea
-
PIPE & CABLE LAY – Landfall Germany - Near Shore, Pre-Lay, Post-Lay & As-Left Surveys
Joined the onshore project team for a further six weeks and provided QA/QC support to the Pipe Lay, Dredging and Permitting ‘Field’ Managers in the landfall site office in Lubmin (Germany) and Survey & HSE Mangers in the head office in Zug (Switzerland). Initially the deployment was a continuation of the office based support utilising Quinsy and Global Mapper. From the middle of December, the focus…PIPE & CABLE LAY – Landfall Germany - Near Shore, Pre-Lay, Post-Lay & As-Left Surveys
Joined the onshore project team for a further six weeks and provided QA/QC support to the Pipe Lay, Dredging and Permitting ‘Field’ Managers in the landfall site office in Lubmin (Germany) and Survey & HSE Mangers in the head office in Zug (Switzerland). Initially the deployment was a continuation of the office based support utilising Quinsy and Global Mapper. From the middle of December, the focus changed to offshore QC on the various survey vessels to witness ‘out surveys’ for the ‘As-left’ charting and Federal Authority Permitting assessments.
Duties included but were not limited to, daily liaison with the contractors (JV Tideway BV - Codralux SA) regarding all matters of operational scheduling, HSE, and survey acquisition of three near shore survey vessels in support of the dredging fleet operations. Daily liaison with Nord Stream 2, Pipe Lay, Dredging and Permitting ‘Field’ Managers in Lubmin providing Quinsy & Global Mapper assessments and review of the contractor provided data acquired during backfilling and as-left surveys. Daily liaison and SIMOPS avoidance with the non-survey contactors vessels and agencies also working in the survey area. Unannounced compliance checks and safety observation duties of the work site operations with safety coaching on complacency reduction and fatigue management assessments. Periodic monitoring and review of JSA’s and RA / Operational procedures. HSE reporting to Nord Stream 2, shore side establishment.
-
OCR – Survey QC & HSE Support – Lubmin Office - Nord Stream 2 – Baltic Sea
-
PIPE & CABLE LAY – Landfall Germany - Near Shore, Pre-Lay, Post-Lay & As-Left Surveys.
Joined the onshore project team for six weeks and provided QA/QC support to Nord Stream 2 Pipe Lay, Dredging and Permitting ‘on site’ managers in Lubmin (Germany) and the Survey & HSE mangers in the head office in Zug (Switzerland).
Duties included but not limited to, daily liaison with the contractors (Saipem & Next Geosolutions) regarding all matters of operational scheduling, HSE, and…PIPE & CABLE LAY – Landfall Germany - Near Shore, Pre-Lay, Post-Lay & As-Left Surveys.
Joined the onshore project team for six weeks and provided QA/QC support to Nord Stream 2 Pipe Lay, Dredging and Permitting ‘on site’ managers in Lubmin (Germany) and the Survey & HSE mangers in the head office in Zug (Switzerland).
Duties included but not limited to, daily liaison with the contractors (Saipem & Next Geosolutions) regarding all matters of operational scheduling, HSE, and survey acquisition of two near shore survey vessels in support of the pipe laying barge. Daily liaison with Pipe Lay, Dredging and Permitting ‘on site’ managers inc Global Mapper assessments and review of contractor provided data, during pre-lay, post-lay and as-left surveys. Daily liaison and SIMOPS avoidance with the Joint Venture dredging vessels and agencies also working in the survey area. Unannounced compliance checks and safety observation duties of the work site operations utilising safety coaching presentations as required on complacency reduction and fatigue management assessments. Periodic monitoring and review of JSA’s and RA / Operational procedures. HSSE reporting to Nord Stream 2, shore side establishment. -
OCR – Survey QC & HSE Support – MV Sea Zip Fix - Nord Stream 2 – Baltic Sea
-
PIPE & CABLE LAY – Landfall Germany - Anchor Corridor Route Survey.
Joined the project team in advance of the vessel mobilisation to assist in contractor audit close outs and the project briefings to the crew of the vessel.
Assisted with QA/QC duties during the in port and offshore calibrations phase.
Sailed with the vessel offshore in a dual role, singleton post, to complete the required SOW.
Duties included but not limited to, daily liaison with Nord Stream 2 PM…PIPE & CABLE LAY – Landfall Germany - Anchor Corridor Route Survey.
Joined the project team in advance of the vessel mobilisation to assist in contractor audit close outs and the project briefings to the crew of the vessel.
Assisted with QA/QC duties during the in port and offshore calibrations phase.
Sailed with the vessel offshore in a dual role, singleton post, to complete the required SOW.
Duties included but not limited to, daily liaison with Nord Stream 2 PM, Captain & Contractors (Allseas & iSURVEY) regarding all matters operational and HSE including, unannounced compliance checks and safety observation duties of the work site operations. Safety Coaching Presentations and periodic monitoring and review of JSA’s and RA. Operational procedures review and complacency reduction and fatigue management assessments and guidance. Daily liaison and permitting compliance notifications to German Authorities (TW & EEZ) including SIMOPS avoidance with several vessels and agencies also working in the survey area. HSSE reporting to NSP2, shore side establishment. -
OCR – Survey QC – Raleigh B - Shell Colombia E&P – Caribbean Sea
-
Environmental & Marine Archaeological Survey – Deep Water EBS.
Joined the project team in advance of the vessel mobilisation to assist in contractor audit close outs and the project briefings to the crew of the vessel.
Carried out QA/QC duties during the in-port and offshore calibrations phase.
Deployed with the vessel offshore as part of 2 OCR team in the role of Survey QC for 11 weeks.
Duties included but not limited to, daily liaison with Shell PM, Captain and…Environmental & Marine Archaeological Survey – Deep Water EBS.
Joined the project team in advance of the vessel mobilisation to assist in contractor audit close outs and the project briefings to the crew of the vessel.
Carried out QA/QC duties during the in-port and offshore calibrations phase.
Deployed with the vessel offshore as part of 2 OCR team in the role of Survey QC for 11 weeks.
Duties included but not limited to, daily liaison with Shell PM, Captain and contractors regarding all matters operational. QA / QC of positioning data, EBS & Archaeological Survey logs and reports, suitable storage and backloading of samples, and acquisition and sampling timelines. Assisted the HSE Rep with unannounced compliance checks and safety observation duties of the work site operations, Safety Coaching Presentations, Complacency Reduction and Fatigue Management Assessments, Monitoring and review of JSA’s and RA / Operational Procedures, HSE reporting to Shell Colombia & Shell Houston, shore side establishments. -
HSE Consultant – Offshore Design Engineering – Great Yarmouth, UK
-
HSE / QA Auditing – Office based support to QHSSE Team.
Seven day office based support to HSSE Manager / Team.
Involved in a comprehensive review of the P2W system utilised by ODE on their installations providing observations and recommendations to their HSEQ Manager (2 days).
Produced a presentation package about P2W to engage with the four levels of employees (Permit User (PU), Permit Holder (PH), Issuing Authority (IA), Authorisation Authority (OIM)) who will…HSE / QA Auditing – Office based support to QHSSE Team.
Seven day office based support to HSSE Manager / Team.
Involved in a comprehensive review of the P2W system utilised by ODE on their installations providing observations and recommendations to their HSEQ Manager (2 days).
Produced a presentation package about P2W to engage with the four levels of employees (Permit User (PU), Permit Holder (PH), Issuing Authority (IA), Authorisation Authority (OIM)) who will undertake the training. Produced a ‘desk top practical assessment’ for the students to complete following the teaching practice to confirm their understanding and use of ODE P2W System (2.5 days)
Presented the completed package to senior management (0.5 days) -
OCR – Survey QC, Fugro Meridian – Lundin AS – North Sea, Norwegian Sector
-
OIL & GAS: Integrated Site Surveys with Environmental (ROV Transects) & Geotechnical (CPT) elements. Joined the project in Nigg, Scotland while the vessel was on ‘technical down time’ due to issues with her auxiliary engines. Which involved two alternators having to be removed and sent away for overhaul and I ensured that the contractor completed repairs in timely and safe manner and that the work was independently inspected prior to sailing. SOW was prioritised in a manner to further reduce…
OIL & GAS: Integrated Site Surveys with Environmental (ROV Transects) & Geotechnical (CPT) elements. Joined the project in Nigg, Scotland while the vessel was on ‘technical down time’ due to issues with her auxiliary engines. Which involved two alternators having to be removed and sent away for overhaul and I ensured that the contractor completed repairs in timely and safe manner and that the work was independently inspected prior to sailing. SOW was prioritised in a manner to further reduce weather exposure costs to the client. The vessel sailed and conducted the priority one, Environmental & Geotechnical elements on Rolvsnes, in a brief weather window of 20 hours between two Force 8 Gales and the remainder of the scope was cancelled, with the vessel demobilising in Aberdeen.
-
OCR – HSE Rep, MV Nor Spring - Shell – QATAR
-
PIPE & CABLE LAY - Acoustic Pipeline Inspection (API) Survey. Function on board the M/V Nor Spring was ‘Shell HSE Rep’ duties including but not limited to: HSE support to the Lead OCR & Qatar Shell PM inc on board H2S awareness training and inspection of the H2S PPE & EBA and unannounced compliance checks with safety observation duties of the work site operations. Safety Coaching Presentations promoting Shell Qatar HSE requirements and building a robust and proactive safety culture. Complacency…
PIPE & CABLE LAY - Acoustic Pipeline Inspection (API) Survey. Function on board the M/V Nor Spring was ‘Shell HSE Rep’ duties including but not limited to: HSE support to the Lead OCR & Qatar Shell PM inc on board H2S awareness training and inspection of the H2S PPE & EBA and unannounced compliance checks with safety observation duties of the work site operations. Safety Coaching Presentations promoting Shell Qatar HSE requirements and building a robust and proactive safety culture. Complacency reduction and fatigue management assessments with monitoring and review of JSA’s and RA / operational procedures. Liaison with the field OIM’s and Vessel Master on P2W for 500m SEZ Operations. HSSE reporting to Qatar Shell GTL Ltd, shore side establishments.
-
OCR – UXO Representative, MV Ivero – Scottish Power Renewables – Southern North Sea, UK
-
OFFSHORE WIND FARM - UXO Survey. Returned to the MV Ivero this time in the role of RPS Energy (UXO Division) Offshore Client Representative on a three vessel UXO project. There was 2 ferrous vessels and 1 non-ferrous vessels, with the MV Ivero role being the tertiary ferrous vessel in support of the MV Vigilant. The MV Ivero was mobilised with GMP 6 frame, 300/900 kHz SSS, and standard navigational and positioning packages to complete a Ferrous Vessel SOW.
-
Dual Role: OPM & HSE Adviser Safety Coach, MV Ivero – Gardline Marine Sciences – Southern North Sea, UK
-
OFFSHORE WIND FARM - UXO Survey. Mobilised the MV Ivero in Lowestoft, UK, with a GMP x6 frame, 300/900 kHz SSS, and standard navigational and positioning packages to join a three vessel UXO project. There was 2 Ferrous and 1 non-ferrous vessels, with the MV Ivero being allocated as the tertiary ferrous vessel in support of the MV Vigilant, in the near shore areas of the route. Having successfully completed a USBL Calibration and offshore sensor calibrations we were tasked to return to port at…
OFFSHORE WIND FARM - UXO Survey. Mobilised the MV Ivero in Lowestoft, UK, with a GMP x6 frame, 300/900 kHz SSS, and standard navigational and positioning packages to join a three vessel UXO project. There was 2 Ferrous and 1 non-ferrous vessels, with the MV Ivero being allocated as the tertiary ferrous vessel in support of the MV Vigilant, in the near shore areas of the route. Having successfully completed a USBL Calibration and offshore sensor calibrations we were tasked to return to port at short notice. De-mobilise and cross deck to the MV Vigilant our UXO array. Mobilise a cougar ROV and conduct a recovery operation to retrieve a GMP8 system lost on site. This was completed with five dives over an 18- hour period with all the equipment recovered in a serviceable state. MV Ivero then re-mobilised for UXO duties and returned to site to complete further trials and calibrations and conduct a series of EVT’s.
Project SOW (Ferrous Vessels) included but was not limited to:
• Acquisition of a 400 x 400 m area around 103 turbines arranged in a standard grid
• Survey inter array cables to a corridor width of 104m
• Two export cable routes of circa 85 km with a corridor width of 50m
• Bathy and backscatter data also required across the entire project.
-
HSE Consultant – Safety Officer, SEAFOX 1 & CONWY – EOG Resources / ODE, Irish Sea, UK
-
PIPE & CABLE LAY - 'CONWY' 8-inch pipe 'Intervention’. Following a 3-week break; returned on the 7th July for the demobilisation and separation phase for SEAFOX1.
-
HSE Consultant – Safety Officer, SEAFOX 1 & CONWY – EOG Resources / ODE, Irish Sea, UK
-
PIPE & CABLE LAY - 'CONWY' 8-inch pipe 'Intervention'. Initially deployed for phase one the 'shuttling program' to prepare for the ‘interfacing’ and COMOPS with SEAFOX 1, a jack up support barge. Then deployed offshore on the SEAFOX 1 for phase two the ‘investigation and servicing’ of a 12.5km 8-inch pipe connecting CONWY with DOUGLES utilising a 24-hour, fifty ‘Pig’ package. HSSE support and advice to both OIM’s included but was but not limited to, safety inductions for all contractors…
PIPE & CABLE LAY - 'CONWY' 8-inch pipe 'Intervention'. Initially deployed for phase one the 'shuttling program' to prepare for the ‘interfacing’ and COMOPS with SEAFOX 1, a jack up support barge. Then deployed offshore on the SEAFOX 1 for phase two the ‘investigation and servicing’ of a 12.5km 8-inch pipe connecting CONWY with DOUGLES utilising a 24-hour, fifty ‘Pig’ package. HSSE support and advice to both OIM’s included but was but not limited to, safety inductions for all contractors working on the CONWY. H2S awareness training to all joiners and servicing of the H2S PPE for both platforms with unannounced compliance checks of the work site operations. Monitoring and review of TBT’s and RA and safety coaching on complacency reduction, safe lifts, and fatigue management Assessments. HSSE reporting to EOG / ODE shore side establishments and facilitated an HSE Executive asset management team visit.
-
HSE Consultant - Aquaterra Energy Ltd - Norwich – UK
-
HSE / QA Auditing – Office based support to QHSE Team.
Week 1 ~ Assisted the QHSE Team with their bi-annual FPAL audit.
Week 2 ~ Completed the annual review of the ‘legal compliance’ documentation and data base update & attended the warehouse to complete the site HSE inspection.
Week 3 ~ Assisted the QHSE team on the preparation for their NQA (ISO 9001 - 14001 – 18001) Audit which included further site visits and inspections. Lead on the COSHH 2015 - Safety Data Sheets & Risk…HSE / QA Auditing – Office based support to QHSE Team.
Week 1 ~ Assisted the QHSE Team with their bi-annual FPAL audit.
Week 2 ~ Completed the annual review of the ‘legal compliance’ documentation and data base update & attended the warehouse to complete the site HSE inspection.
Week 3 ~ Assisted the QHSE team on the preparation for their NQA (ISO 9001 - 14001 – 18001) Audit which included further site visits and inspections. Lead on the COSHH 2015 - Safety Data Sheets & Risk Assessments review including briefing the warehouse staff on ‘best practice’ and improvement requirements prior to the NQA Audit. Also, took part in the QHSE Managers Internal Audit.
Week 4 - NQA Audit support and participated in the company MD & Snr Management briefing on the auditor’s comments and recommendations. -
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN ENDEAVOUR NB. Extended project with no crew changes.
-
Vessel Commissioning / Maintenance: ‘Pre-Transatlantic’ Cable Route (Reconfiguration to Cable Survey Role Extended PMS MCA & Class Audits Client (OVID)) Fortaleza, Brazil - Gardline Marine Sciences Ltd
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN ENDEAVOUR NB. Extended project with no crew changes.
-
Pipe & Cable Lay: SACS Brazil to Angola Cable Route (Branch point Fortaleza, Brazil to Branch Point Luanda, Angola -~5750 Km - MBES DW cable route survey inc route development and additional branch unit surveys for Ascension Island & St Helena) – Atlantic Ocean - NEC & Angola Cables
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Vessel Commissioning / Maintenance: ‘Post-Lay Up’ (Reconfiguration & Mobilisation for Geotechnical Surveys Extended PMS Client (OVID)) Tampico, Mexico - Gardline Marine Sciences Ltd
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Pipe & Cable Lay: Sur de Texas Pipe Line (Brownsville / Tampico / Tucspan – Geotechnical = Phase I – multiple PCPT test stations 15 to 130 m WD. Phase II – multiple VC test stations 15 to 130 m WD. Phase III - multiple PC test stations 15 to 130 m WD.) – Gulf of Mexico – IMG / TransCanada
-
Dual Role: OPM & HSE Adviser Safety Coach, CONFIDANTE
-
OFFSHORE WIND FARM: Geophysical UXO Survey (Gabbard Bank - Analogue Multi Magnetometer [x4] Array (300km Virgin Lines Significant Infill Coverage)) – UK, Inshore East Anglia - Galloper Wind Farm Ltd (GWFL).
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Vessel Commissioning / Maintenance: ‘Pre-Transatlantic’ Cable Route (Reconfiguration to Cable Survey Role Extended PMS Interim Dry Docking Sea Trials Client (OVID)) Gib dock, Gibraltar - Gardline Marine Sciences Ltd
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Pipe & Cable Lay: BRUSA Cable Route Survey (South America boundary of the Brazilian EZ to the branch point into Puerto Rico -~4000Km - MBES DW cable route survey inc route development and additional branch unit surveys) – Atlantic Ocean - ALCATEL - LUCENT
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Pipe & Cable Lay: BRUSA Cable Route Survey (Branch point into Puerto Rico to San Juan 15M Contour Tie In -~300Km Analogue Geotechnical Packages) – Atlantic Ocean - ALCATEL - LUCENT
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Pipe & Cable Lay: BRUSA Cable Route Survey (Branch point Puerto Rico to Branch Point Norfolk, Virginia -~3000Km - MBES DW cable route survey inc route development and additional branch unit surveys) – Atlantic Ocean - ALCATEL - LUCENT
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Pipe & Cable Lay: BRUSA Cable Route Survey (Branch point Norfolk, Virginia to Norfolk 15M Contour Tie In -~250Km - Analogue Geotechnical Packages) – Atlantic Ocean - ALCATEL - LUCENT
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Vessel Commissioning / Maintenance: ‘Post-Transatlantic’ Cable Route (Reconfiguration to General Survey Role Extended PMS Client (OVID) Warm Stacking [Marine Crew Only]) Santa Domingo, Dominican Republic - Gardline Marine Sciences Ltd
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
Environmental & Marine Archaeological Survey: ‘Autumn 2015 Campaign’ EBS (Gua 3 East - Multiple stations in WD from 2000 metres > 4000 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
Environmental & Marine Archaeological Survey: ‘Autumn 2015 Campaign’ EBS (Col 3 - Multiple stations in WD from 1200 metres > 2400 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
Environmental & Marine Archaeological Survey: ‘Autumn 2015 Campaign’ Geochemical (Gua 3 - Multiple stations in WD from 3000 metres > 4250 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
Environmental & Marine Archaeological Survey: ‘Autumn 2015 Campaign’ Geochemical (Col 3 - Multiple stations in WD from 2000 metres > 3200 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
Environmental & Marine Archaeological Survey: ‘Autumn 2015 Campaign’ EBS (SINOFF 7 - Multiple stations in WD from 1200 metres > 2400 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RELIANCE
-
HSE / QA Auditing: HSSE Safety Coach in attendance on the OCEAN RELIANCE during a ‘Safety Stand Down’.
• Phase 1: Short notice mobilisation to join a Management Team in Montrose to attend the vessel and assess the status of the ‘Safety Culture’ on board the vessel.
• Phase 2: Safety Coaching to individuals and groups. HSSE training Sessions to groups. Feedback and remedial action recommendations to Master & Party Chief
• Phase 3: Great Yarmouth: Briefing to Directors & Departmental…HSE / QA Auditing: HSSE Safety Coach in attendance on the OCEAN RELIANCE during a ‘Safety Stand Down’.
• Phase 1: Short notice mobilisation to join a Management Team in Montrose to attend the vessel and assess the status of the ‘Safety Culture’ on board the vessel.
• Phase 2: Safety Coaching to individuals and groups. HSSE training Sessions to groups. Feedback and remedial action recommendations to Master & Party Chief
• Phase 3: Great Yarmouth: Briefing to Directors & Departmental Managers.
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
Pipe & Cable Lay: Pipe Line Route (MBES Analogue Geotechnical Packages) - Trinidad (Caribbean Sea) - EOG Resources Trinidad Limited
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
OIL & GAS: Geophysical Site Survey (2DHR Analogue (integrated) - Trinidad (Caribbean Sea) - EOG Resources Trinidad Limited
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
Environmental & Marine Archaeological Survey: ‘Spring 2015 Campaign’ Geochemical (Col-3 & Gua3 - Multiple stations in WD from 3000 metres > 4250 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
Environmental & Marine Archaeological Survey: ‘Spring 2015 Campaign’ EBS (Col-3 - Multiple stations in WD from 1200 metres > 2000 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
OIL & GAS: Shallow Hazards Survey (Ruby - 2DHR Analogue (integrated) - Trinidad (Caribbean Sea) - BHP Billiton Trinidad Limited
-
Dual Role: OPM & HSE Adviser Safety Coach, OCEAN RESEARCHER NB eight on / four off rotation.
-
OIL & GAS: Seabed Clearance Survey (Central to Canteen Platform - 2DHR Analogue (integrated) - Trinidad (Caribbean Sea) - BHP Billiton Trinidad Limited
-
Dual Role: OPM & Operations Department Auditor, GARDLINE
-
HSE / QA Auditing: Technical & HSE Auditing of Gardline Vessel’s at Anchor in Trinidad.
• Phase 1: Ocean Researcher (2.5 days) inc GL7 / Prep for next client OVID / Briefing to Marine Crew on next client’s aspirations and requirements.
• Phase 2: Ocean Discovery (2.5 days) inc GL7 / Prep for next US Coastguard Baltimore Inspection.
• Phase 3: Great Yarmouth (3 days): Briefing to Directors & Departmental Managers on GL7’s and preparations for coming operations.
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
OIL & GAS: ‘Autumn 2014 Campaign’ Multi-Beam Survey (SBES: Simrad EA400 MBES: EM710 & EM 122 and associated processing system(s) MBES Backscatter SV DIPS ~ 4300,00 KM of line running) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Environmental & Marine Archaeological Survey: ‘Autumn 2014 Campaign’ Geochemical (Col-3 & Gua3 - Multiple stations in WD from 2000 metres > 4250 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Environmental & Marine Archaeological Survey: ‘Autumn 2014 Campaign’ EBS (Gua3 - Multiple stations in WD from 2000 metres > 4000 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, SEA SURVEYOR NB. Extended project with no crew changes.
-
Environmental & Marine Archaeological Survey: ‘Autumn 2014 Campaign’ EBS (Col-3 - Multiple stations in WD from 2000 metres > 3200 metres) Colombia [Caribbean Sea] – Shell E&P Colombia
-
Dual Role: OPM & HSE Adviser Safety Coach, POLAR SURVEYOR NB. Extended project with no crew changes.
-
OIL & GAS: MCG – 2014 Barents Sea (2DHR – 309 Ch ALS Streamer 4x40 cu in Source – 5600km virgin lines significant infill) Barents Sea (Norwegian Sector) - MULTI CLIENT GEOPHYSICAL A/S
-
Dual Role: OPM & HSE Adviser Safety Coach, POLAR SURVEYOR NB. Extended project with no crew changes.
-
Vessel Commissioning / Maintenance: Vessel ‘Phase 1 Commissioning’ Program (Reconfiguration to Multi-Role Dry Docking Fitting Out Sea Trials (For Acceptance into the fleet) Client (OVID) MCA / Norway Maritime Audits) Hull, UK - Gardline Geosurvey Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - MV IVERO - GARDLINE - Danish Sector / German Bight Area
-
OFFSHORE WINDFARM: Geophysical UXO Survey (Gode Wind 1 & 2 - Analogue Array Multi-Mag [x4] Frame - 1800 KM with significant infill) North Sea for DONG Energy Wind Power A/S
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
Vessel Commisioning & Maintenance: (Installation of 3D seismic array ancillary equipments / extended PMS / client OVID audit / sea trials of newly installed equipments) Hull, UK for Gardline.
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (Guillemot UKCS 21/25 - Intergrated 2DHR Seismic & Analogue Arrays Geotechnical Debris Investigations with SW CAM Packages) North Sea for Shell E&P UK
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (Curlew UKCS 29/7a - Intergrated 2DHR Seismic & Analogue Arrays Geotechnical Debris Investigations with SW CAM Packages) North Sea for Shell E&P UK
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (Culzean UKCS 22/25 - Intergrated 2DHR Seismic & Analogue Arrays Geotechnical EBS with Habitats Packages) North Sea for Maersk Oil UK Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Kraken UKCS 9 Location E - 10 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for EnQuest Britain Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Kraken UKCS 9 Location D - 10 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for EnQuest Britain Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Kraken UKCS 9 Location C - 10 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for EnQuest Britain Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Field Development Survey (Kraken UKCS 9 Location B - Intergrated 2DHR Seismic & Analogue Arrays Geotechnical EBS with Habitats Packages) North Sea for EnQuest Britain Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Field Development Survey (Kraken UKCS 9 Location A - Intergrated 2DHR Seismic & Analogue Arrays Geotechnical EBS with Habitats Packages) North Sea for EnQuest Britain Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Caithes UKCS 21 - 56 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for EnQuest Britain Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS:Debris Detection / Monitoring Survey (ETAP / Machar East UKCS 21 - MBES / SBES enahnced water column investiagetions) North Sea for British Pretoleum UK
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (Valhalla NCS Location A - 2DHR Seismic Pinger MBES with back scatter interpritation ) North Sea for British Pretroleum Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (Valhalla NCS Location B - 3DUHR Seismic Pinger MBES with back scatter interpritation ) North Sea for British Pretroleum Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (Valhalla NCS Location A - 3DUHR Seismic Pinger MBES with back scatter interpritation ) North Sea for British Pretroleum Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Jackdaw to Seal Tee UKCS Quads 22, 29 & 30 NCS Quads 1 & 7 - 50 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for BG International Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Jackdaw to CAT T5 UKCS Quads 22, 29 & 30 NCS Quads 1 & 7 - 103 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for BG International Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Jackdaw to Shearwater Wye UKCS Quads 22, 29 & 30 NCS Quads 1 & 7 - 50 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for BG International Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Jackdaw to Norpipe Northern Wye UKCS Quads 22, 29 & 30 NCS Quads 1 & 7 - 39 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for BG International Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
PIPE & CABLE LAY: Field Development Survey (Jackdaw to Ula Platform UKCS Quads 22, 29 & 30 NCS Quads 1 & 7 - 48 km Pipe Line Route Survey - Analogue Array Geotechnical EBS with Habitats Packages) North Sea for BG International Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (Jackdaw Platform UKCS/NCS - 2D UHR Seismic & Analogue Arrays Geotechnical EBS Packages) North Sea for BG International Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (Jackdaw Platform UKCS/NCS - 2D HR Seismic & Analogue Arrays Geotechnical EBS Packages) North Sea for BG International Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Debris Detection Survey (Galleon PG 7 K17 UKCS - MBES & SBES) North Sea for Shell E&P UK Ltd
-
Dual Role: OPM / HSE Adviser Safety Coach - OCEAN RELIANCE - GARDLINE - UKCS / NCS (8 on 4 off Rotations)
-
OIL & GAS: Debris Detection Survey (Cygnus Alpha Complex & ETS Manifold UKCS 44/12a - MBES & SBES Analogue ROV Cougar Target Investigations) North Sea for GDF Suez E&P Ltd
-
Party Chief - VIGILANT - GARDLINE - UKCS
-
Vessel Commisioning & Maintenance: (Sea trials of newly installed equipments) Dogger Bank, UK for Gardline.
-
Party Chief - OCEAN RELIANCE - GARDLINE - NCS / DCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (PL558 NCS 6507/5 & 6507/6 - Intergrated 2DHR Seismic & Analogue Arrays Geotechnical EBS & Habitats Packages) North Sea for Eon E&P Norge
-
Party Chief - OCEAN RELIANCE - GARDLINE - NCS / DCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (SOLSORT 2 DCS 5604/20 - Intergrated 2DHR Seismic & Analogue Arrays) North Sea for DONG Energy
-
Party Chief - OCEAN RELIANCE - GARDLINE - NCS / DCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (SOLARIS NCS 1 PL618/619 - Intergrated 2DHR Seismic & Analogue Arrays Geotechnical Package) North Sea for TOTAL E&P Norge
-
Party Chief - OCEAN RELIANCE - GARDLINE - NCS / DCS (8 on 4 off Rotations)
-
OIL & GAS: Site Survey (PHOENIX NCS 6406 PL585 - Intergrated 2DHR Seismic & Analogue Arrays Geotechnical Enhanced EBS & Habitats Packages) North Sea for TOTAL E&P Norge
-
Party Chief - OCEAN RELIANCE - GARDLINE - NCS / DCS (8 on 4 off Rotations)
-
Vessel Commisioning & Maintenance: (Snagging out post 6 months acceptance into the fleet / Extended PMS / client OVID audits (x2) / MCA audit / sea trials of newly installed equipments) Hull, UK for Gardline.
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Sycamore UKCS 16/12 - 2D 48 ch Seismic & Analogue Passes Geotechnical & EBS with Habitats Packages) North Sea for Venture Production
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Olympus UKCS 48/12E - 2D 48 ch Seismic & Analogue Passes Geotechnical & EBS with Habitats Packages) North Sea for Centrica UK
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Svanogle NCS 17/6 - 2D 96 ch Seismic & Analogue Passes Geotechnical Package) North Sea for NORECO ASA
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
Vessel Maintenance: (Survey equipments rotation / extended PMS / client OVID audits (x2) / MCA audit /sea trials of newly installed equipments) Aberdeen, UK for Gardline.
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
PIPE & CABLE LAY: Route Survey (Pi Development NCS 15/12 & 6/3 - 120km Analogue / Geotechnical / EBS with Habitats Packages) North Sea for British Gas Norge
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (x2 sites Pi North & Pi South NCS 6/3 & 15/12 - 2D 48 ch Seismic & Analogue Passes Geotechnical & EBS with Habitats Packages) North Sea for British Gas Norge
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Debris Detection Survey (Viking AR UKCS 49/12 - MBES & SBES) North Sea for Conoco Philipps Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (x2 sites Votna & Skarfell NCS 30/3 & 35/8- Intergrated 2DHR Seismic & Analogue Array Geotechnical & Geochemical Packages) North Sea for NEXEN AS
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (x2 sites Cameron & Acle UKCS 44/19b & 49/29d - Intergrated 2DHR Seismic & Analogue Array Geotechnical & EBS with habitat Packages) North Sea for Tullow Oil
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
PIPE & CABLE LAY: Route Survey (Cygnus A to Trent 60 km & Cygnus A to Cygnus B 35 km - UKCS 44/12a - Analogue / Geotechnical / EBS with Habitats Packages) North Sea for GDF Suez E&P UK Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Cygnus A UKCS 44/12- Intergrated 2DHR Seismic & Analogue Array Geotechnical & EBS Packages) North Sea for GDF Suez E&P UK Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Cygnus B UKCS 44/12- Intergrated 2DHR Seismic & Analogue Array Geotechnical & EBS Packages) North Sea for GDF Suez E&P UK Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Jacqui UKCS 30/13- Intergrated 2DHR Seismic & Analogue Array Geotechnical & EBS Packages) North Sea for GDF Suez E&P UK Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Ketch Relief Wells UKCS 44/19b - 2D Seismic & Analogue Passes Geotechnical & EBS with HabitatsPackages) North Sea for Tullow Oil
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Debris Detection Survey (Ketch UKCS 44/19b - MBES & SBES) North Sea for Tullow Oil
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
PIPE & CABLE LAY: Route Survey (Interconnecter Lines 16 km - UKCS 210/30 - Analogue / Geotechnical / EBS with Habitats Packages) North Sea for Sterling Resources Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
PIPE & CABLE LAY: Route Survey (FPSO to Heather 7.5 km - UKCS 210/30 - Analogue / Geotechnical / EBS with Habitats Packages) North Sea for Sterling Resources Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
PIPE & CABLE LAY: Route Survey (Well 210/30a-A4 to FPSO 9.5 km - UKCS 210/30 - Analogue / Geotechnical / EBS with Habitats Packages) North Sea for Sterling Resources Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
PIPE & CABLE LAY: Route Survey (Well 210/30a-A4 to Tern Platform 12.5 km - UKCS 210/30 - Analogue / Geotechnical / EBS with Habitats Packages) North Sea for Sterling Resources Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
PIPE & CABLE LAY: Route Survey (Well 210/30a-A4 to WIDP FPSO 6.5 km - UKCS 210/30 - Analogue / Geotechnical / EBS with Habitats Packages) North Sea for Sterling Resources Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Bluebell UKCS 15/24c - Intergrated 2DHR Seismic & Analogue Array Geotechnical & EBS Packages) North Sea for Premier Oil
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Darwin UKCS 211/27 - Intergrated 2DHR Seismic & Analogue Array Geotechnical & EBS Packages) North Sea for Fairfield
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Abandon Wells Magnetometer Survey (UKCS 43/21 - Enhanced Analogue Array) North Sea for National Grid
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Bunter Out Crop, Definition Survey (UKCS 43/21 - 42/25 - Intergrated 2DHR Seismic & Analogue Array EBS& Habitats Package) North Sea for National Grid
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Appraisal Well Surveys (UKCS 43/21 - 42/25 - Intergrated 2DHR Seismic & Analogue Array Geotechnical EBS& Habitats Packages) North Sea for National Grid
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: PL581 Leon 2D Exploration Survey (NCS 6203/35 & 6507/6 - 2DHR Seismic Array) Norwegian Sea for DANA Petroleum Norge AS
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NCS / NLCS (8 on 8 off Rotations)
-
OIL & GAS: Site Survey (Cladhan Field Development UKCS 210/30- Intergrated 2DHR Seismic & Analogue Array Geotechnical & EBS Packages) North Sea for Sterling Resources Ltd
-
Party Chief - OCEAN OBSERVER - GARDLINE - NCS
-
OIL & GAS: Site Survey (NCS 6506/9 - 2D 96 ch Seismic & Analogue Passes Geotechnical & EBS with Habitats Packages) Norwegian Sea for Centrica ASA
-
Party Chief - OCEAN OBSERVER - GARDLINE - NCS
-
OIL & GAS: Site Survey (NCS 6407/9 - 2D 96 ch Seismic & Analogue Passes Geotechnical & EBS with Habitats Packages) Norwegian Sea for Centrica ASA
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NLCS
-
OIL & GAS: Site Survey (Platypus 48/1a/e - 2D 48 Seismic & Analogue Passes Geotechnical / EBS with Habitats Packages) North Sea for DANA Petroleum Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NLCS
-
PIPE & CABLE LAY: Route Survey (Cygnus to Tyne 44/12a - 21km Analogue / Geotechnical / EBS with Habitats Packages) North Sea for GDF Suez E&P UK Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NLCS
-
OIL & GAS: Debris Detection Survey (L09-FA1 / K15-FA1 / L13-FD / INDE-J / GANNET - MBES & SBES) North Sea for Shell E&P
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NLCS
-
Environmental & Marine Archaeological Survey: Post Drilling Assessment (UKCS 44/12a-d - Analogue with DTS Camera Investigations) North Sea for GDF Suez E&P UK Ltd
-
Party Chief - OCEAN RESEARCHER - GARDLINE - UKCS / NLCS
-
OIL & GAS: Debris Detection Survey (Ketch Blk 44/28b - MBES & SBES) North Sea for DANA Pretoleum Ltd
-
Party Chief - TRIDENS 1 - GARDLINE - UKCS
-
OIL & GAS: Site Survey (Rhyl - Castletown - Lytham, 2D 96 ch with 4x40 cu in source Analogue / Geotechnical / EBS & Habitats packages) offshore Barrow on Furness, Irish Sea for Centrica
-
Party Chief - TRIDENS 1 - GARDLINE - UKCS
-
OIL & GAS: Site Survey (Blakeney Blk 21/27 - Intergrated 2D Seismic & Analogue Arrays with Geotechnical & EBS with Habitats Packages) North Sea for Wintershall Norge AS
-
Party Chief - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Site Survey (x2 sites both 2D 48ch with 4x40 cu in source intergrated analogue package) offshore Douala, Cameroon for Noble Enegy.
-
Party Chief - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Site Survey (Njonji - 2D 96 ch with 4x40 cu in source Analogue & Geotechnical Packages also Pseudo 3D trials and experimental shoots utilising 120 ch streamer and a 100 cu in source) offshore Cameroon for TOTAL E&P.
-
Party Chief - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Site Survey (x2 sites both utilising 2D 48ch with 4x40 cu in source Analogue / Geotechnical Packages) offshore Ivory Coast for Foxtrot International.
-
Party Chief - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
Vessel Maintenance: (Survey equipments rotation / extended PMS / client OVID audit / sea trials of newly installed equipments) GETMA Quay, Douala, Cameroon for Gardline.
-
Party Chief - SEA PROFILER - GARDLINE - Mediterranean Sea
-
OIL & GAS: Site Survey (x3 Sites all three being 2D 96ch with 4x40 cu in source Analogue / Geotechnical (CPT & VC) / EBS and Habitats Packages) offshore Sfax, Tunisa for Cairns / RPS.
-
Party Chief - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
Vessel Maintenance: (Survey equipment rotation / Extended PMS / Client OVID & Safety Audits in readiness for an extended oil majors autumn campaign) GETMA Quay, Douala, Cameroon for Gardline
-
Underwater Engineer (Watch Leader) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Seismic Survey (Pseudo 3D 120 Ch with 200 cu in source) offshore Douala, Cameroon for TOTAL E&P
-
Underwater Engineer (Watch Leader) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Site Survey (2D 96 ch with 4x40 cu in source Analogue Package) offshore Douala, Cameroon for TOTAL E&P.
-
Underwater Engineer (Watch Leader) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Site Survey (2D 96 ch with 4x40 cu in source Analogue / Geotechnical / EBS and Habitats Packages) offshore Point Noire, Congo for GDF & Suez Ltd.
-
Underwater Engineer (Watch Leader) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Site Survey (2D 96 ch with 4x40 cu in source Analogue / Geotechnical / EBS and Habitats Packages) offshore Pointe Noire, Congo for GDF & Suez Ltd
-
Underwater Engineer (Watch Leader) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
Environmental & Marine Archaeological Survey: (DW Seabed Sampling (Mega-Corer) DW Camera (Rovio) SW Camera (Gardline) Water Column Analysis) offshore Luanda, Angoloa for British Pretoleum
-
Underwater Engineer (Watch Leader) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Site Survey (2D UHR 120 ch with mini air gun source Integrated Analogue Package) offshore Luanda, Angola for British Pretroleum
-
Underwater Engineer (On-line) - SEA SURVEYOR - GARDLINE - Baltic Sea.
-
OIL & GAS: Site Survey (2D 96ch with 4x40 cu in source Analogue & Geotechnical Packages) offshore Karlskrona, Sweden for Spec Client in association with Geotech Consulatnts
-
Underwater Engineer (On-line) - OCEAN ENDEAVOUR - GARDLINE - Western Australia.
-
OIL & GAS: Site Survey (2D 96 ch with 4x40 cu in source Analogue / Geotechnical (CPT) / Geochemical (PC) Packages) offshore Dampier (AUS) for Cairns / RPS
-
Underwater Engineer (On-line) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Site Survey (2D 48 ch with 4x40 cu in source Analogue Package) offshore Ivory Coast for Foxtrot International
-
Underwater Engineer (On-line) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
Environmental & Marine Archaeological Survey: DW Seabed sampling (Box Corer) offshore Nigeria for TOTAL E&P Ltd.
-
Underwater Engineer (Trainee) - SEA TRIDENT - GARDLINE - West Coast of Africa.
-
OIL & GAS: Seismic Survey (2D 48 ch with 4x40 cu in source) offshore Equatorial Guinea for Noble Energy
Languages
-
English
Native or bilingual proficiency
-
German
Professional working proficiency
Recommendations received
9 people have recommended Paul
Join now to viewMore activity by Paul
-
Here are some of the latest offshore news stories we've been keeping our eye on at GGS: ⚖️ Shell and Equinor are set for a November 12 court battle…
Here are some of the latest offshore news stories we've been keeping our eye on at GGS: ⚖️ Shell and Equinor are set for a November 12 court battle…
Liked by Paul Turnbull Tech IOSH.
-
Everyone in leadership role should read this🔥 At my workplace, I have a crew of guys under me. If someone asks if I'm in charge, I just say…
Everyone in leadership role should read this🔥 At my workplace, I have a crew of guys under me. If someone asks if I'm in charge, I just say…
Liked by Paul Turnbull Tech IOSH.
-
As we apply decades of industry experience and expertise to clients and contractors alike, we do things our way - a genuinely distinctive approach…
As we apply decades of industry experience and expertise to clients and contractors alike, we do things our way - a genuinely distinctive approach…
Liked by Paul Turnbull Tech IOSH.
Other similar profiles
Explore collaborative articles
We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.
Explore MoreAdd new skills with these courses
-
1h 4m
Google Cloud Professional Data Engineer Cert Prep: 1 Designing Data Processing Systems
-
1h 9m
Microsoft Azure Data Engineer Associate (DP-203) Cert Prep: 4 Monitor and Optimize Data Storage and Data Processing by Microsoft Press
-
23m
Effortless: Make It Easy to Do What Matters (Book Bite)