Great to share we are working with Ethical Power on our Sambar Power BESS project in Cornwall. Ethical Power will provide Balance of Plant works for the 47.5MW project.
We are pleased to share that Ethical Power has signed a Balance of Plant (BoP) agreement with Varco Energy for the 47.5 MW Sambar Power battery storage project in Cornwall. Ethical Power’s high-voltage grid connections arm will install the battery energy storage systems (BESS) equipment chosen by Varco, and carry out all the electrical, mechanical and civil infrastructure works required for the connection of the asset to National Grid’s transmission network. “Ethical Power is delighted to partner with Varco Energy for the installation and connection of this grid-scale battery asset. Projects like Sambar Power are vital for grid stability and the continued expansion of renewable energy in the UK. We are looking forward to delivering the project safely, to programme, and ensuring the highest quality standards are maintained.” said Rachel Ruffle, Chief Operating Officer at Ethical Power. You can read more about this exciting project here: https://lnkd.in/e6vXz7xs #NetZero #BatteryStorage #UK