Bauer’s high-performance B-Tronic System is based on dozens of sensors, placed at critical points in the Bauer rig. These sensors continuously collect data, on (for example) temperature, pressure, or position. The data are centrally logged and processed. A high-resolution touch screen with a range of different display modes informs the machine operator about the status of their machine and provides details for its optimal use. The BAUER specific telematic unit allows transmitting machine operating and production data locally and globally to any place. Enabling remote monitoring service to enhance the up-time experience. To find out more about Bauer Technologies, visit: https://lnkd.in/diR7hT5j #bauer #bauergroup #bauerpower #passionforprogress #weknowthedrill
BAUER Technologies Limited
Construction
Bishop’s Stortford, England 21,392 followers
Bauer Technologies is the UK-based contracting business of world-leading piling & foundation specialist, the BAUER Group
About us
BAUER Technologies Ltd performs all contracting works on deep foundation projects in UK on behalf of the BAUER Group. Bauer Technologies is the UK contracting business of the BAUER Group, specialising in the design and installation of large diameter piles, diaphragm walls, secant walls, under-ream piles and near-silent pile removal on projects throughout the UK. The Bauer name is synonymous the world over, with the highest standards in foundation engineering. To ensure that Bauer is able to deliver these standards to its clients, the company strategy is to concentrate efforts on those specific areas in which Bauer Technologies excels. All Bauer piling and diaphragm walling equipment is manufactured by Bauer HQ in Germany. This equipment is particularly suited to dealing with hard strata, including the removal of reinforced concrete obstructions where these obstruct the position of a proposed foundation. As a wholly owned subsidiary of the BAUER Group, Bauer Technologies is fully supported by the technical departments of its parent company, Bauer Spezialtiefbau in Germany, allowing access to additional rigs and specialist resources as well as enabling Bauer in the UK to benefit from the latest improvements from the Research and Development department, based in HQ. By maintaining close links with the Worldwide network of over 50 Bauer offices, the UK office is able to draw upon the full depth of the BAUER Group's experience and engineering knowledge to develop the most innovative and cost effective solution to our client's foundation problems. For assistance on any projects in the UK or to request more information, call our UK office in Bishops Stortford on 01279 653108.
- Website
-
http://www.bauertech.co.uk
External link for BAUER Technologies Limited
- Industry
- Construction
- Company size
- 51-200 employees
- Headquarters
- Bishop’s Stortford, England
- Type
- Privately Held
- Founded
- 2007
- Specialties
- Basements, Deep foundations, Diaphragm walls, Rotary bored piles, Mixed in place solutions, Pile removal, Secant walls, Secant piled walls, Underream piles, Plunge column piles, Ground improvement, and mixed in place
Locations
-
Primary
10 Ducketts Wharf
Bishop’s Stortford, England, GB
Employees at BAUER Technologies Limited
Updates
-
FLASHBACK FRIDAY | US Embassy, London... Bauer Technologies was awarded the contract to undertake the piling and diaphragm walling works for the new US Embassy in London. The US Department of State Bureau of Overseas Buildings Operations (OBO), construction contractor, BL Harbert, and prime sub-contractor, Sir Robert McAlpine, selected Bauer Technologies for the early site work package. Bauer’s work consisted of the construction of a diaphragm wall; deep, base-grouted, large diameter rotary bored piles; CFA and rotary bored piles. To read our project case study, please visit - https://lnkd.in/estxtKtH #FlashbackFriday #BauerPower #PassionforProgress #USEmbassyLondon #CommercialDevelopment
-
-
Bauer Technologies – Committed to Protecting the Environment... At Bauer, the protection of the environment and biodiversity is of the utmost importance. As a subsidiary of Bauer Spezialtiefbau GmbH, Bauer Technologies embrace new developments from its parent company, to reduce the impact on site activities. With an integrated group structure, Bauer Technologies - the only geotechnical contracting company to be accredited with the BES 6001 Standard for Responsible Sourcing – endeavour to achieve the highest standards, and strive to be a market leader in sustainability! Our commitment for 2024 includes: > Zero environmental prosecutions > Monitor concrete usage on site > Reduce our carbon emissions > Reducing water and waste in construction To find out more about our commitment to protecting the environment, view our 2023 Stakeholder Report - https://lnkd.in/eJqx_zkM #BauerPower #PassionForProgress #Sustainability #Environment #ProtectTheEnvironment #Biodiversity #Geotechnics #CarbonEmissionReduction #WasteReduction
-
-
Early Careers Group to Visit York Central Project... We are delighted to be hosting a site visit to our project at York Central, which has been organised by Julia (Hill) Nicholson, Chair of the The Federation of Piling Specialists (FPS) Early Careers Group, for 6th August 2024. This complex project will provide the opportunity to gain unique insights into this major infrastructure project and the innovative piling techniques being used by Bauer Technologies. There are still a few places available, to anyone working within the construction industry, with 10 years or less experience. For more details and to secure your place, visit - https://lnkd.in/eM8WT_Bb - or contact Julia (Hill) Nicholson, Chair of the FPS Early Careers Group, by email - [email protected] - or DM. #FPS #EarlyCareersGroup #Construction #Piling #YorkCentral #Infrastructure
-
-
FLASHBACK FRIDAY | A19/A1058 Junction Improvement... Bauer Technologies was awarded the bored piling scope of works for critical structures and contiguous pile walls. Divided into two phases, Bauer’s remit was to install rock-socketed contiguous rotary bored piles and required Bauer to work within a live, major roundabout with a heavy volume of traffic. Bauer worked closely with the client and Highways England, in order to implement stringent health and safety processes. Bauer also participated enthusiastically in Highways England’s “Raising the Bar” scheme which is designed to raise standards in Efficiency, Quality and Health and Safety. The project was completed successfully, with all works completed to the agreed with some 45,000 hrs total hours worked without incident. To read more, visit - https://lnkd.in/dmQEWxu #FlashbackFriday #BauerPower #Piling #Foundations #Highways #Roads #Safety #Quality
-
-
Talk to us about our innovative, sustainable solutions and optimised designs for retaining structures, piled foundations, cut-off walls and ground improvement installations. We encourage clients to engage with our team at the earliest possible opportunity, to maximise the value that we can bring to geotechnical projects. Our company profile summarises some of our key projects in the UK. To view, visit - https://lnkd.in/eRjKUrr3 To view our project case studies, visit - https://lnkd.in/dJ6iESF #bauerpower #passionforprogress #geotechnics #geotechnicalengineering #piling #foundations #groundimprovement
-
-
FLASHBACK FRIDAY | Principal Place, London... Bauer Technologies was appointed to install the piled foundations and secant walls for the Principal Tower, in London, which required Bauer to work in restricted space conditions, next to a live railway, around strict load restriction zones and in amongst other trades on site. Bauer completed the piling works on time and without any lost-time or accidents. Most importantly, the implemented risk assessments and associated mitigation measures allowed the piling team to install all piles without interruption to the live railway directly adjacent. Visit - https://lnkd.in/erxRQ9ii #flashbackfriday #flashback #bauerpower #tower #restrictedspace #rail #teamwork
-
-
Bauer Technologies – Committed to Protecting the Environment and Biodiversity… As we move into the second-half of 2024, sustainability remains high on our agenda, and we’re committed to the protection of the environment and biodiversity on the sites in which we work. We measure and monitor environmental KPIs, with the aim of reducing our impact year on year. To find out more about our commitment to Health & Safety; Environment; Quality, Compliance and Sustainability, our 2023 Stakeholder Report can be viewed here - https://lnkd.in/eJqx_zkM #bauerpower #passionforprogress #Bsustainable #sustainability #environment #biodiversity #protecttheenvironment #healthandsafety #quality #compliance
-
-
Talk to us about sustainability... To date Bauer Technologies is the only geotechnical contractor in the world to be accredited with the BRE BES 6001 Sustainability Certification, with a mark of excellence. Early involvement in projects is crucial when considering sustainability, to ensure that clients’ sustainability goals are achievable. To find out more, visit: https://lnkd.in/diR7hT5j #sustainability #Bsustainable #bauerpower #passionforprogress
-
-
We’ve published our Stakeholder Report for 2023 - the information contained within the document highlights our commitment to Health & Safety; Environment; Quality, Compliance and Sustainability, and outlines improvements for the future. To view the report, visit - https://lnkd.in/eJqx_zkM #StakeholderReport #BauerPower #PassionForProgress #Sustainability #HealthAndSafety #Environment #Quality #Compliance #ContinuousImprovement
-