Trevi Group

Trevi Group

Ingegneria civile

Cesena, Emilia-Romagna 32.399 follower

Chi siamo

The Trevi Group is a world leader in the field of underground engineering in the design and marketing of specialized technologies in the sector. Set-up in Cesena in 1957, today the Trevi Group has over 65 offices and is present in more than 90 countries. The Group employs about 3200 employees. Internationalization, integration and the continuous exchange between its 2 divisions are among the reasons for the success of the Group: Trevi, which carries out special foundations and soil consolidation works for large infrastructure projects (subways, dams, ports and docks, bridges, railway and highway lines, industrial and civil buildings) and secures polluted sites and Soilmec, which designs, manufactures and markets machinery, systems and services for underground engineering. Among the many projects carried out by the Group over its 67 years of activity we remember: the construction of the Ertan Dam, the consolidation of the Tower of Pisa, the foundations of the Vasco da Gama Bridge, the foundation works of the new World Trade Center, the consolidation of the niches of the Bamiyan Buddhas, the consolidation of the Wolf Creek and of the LPV-111 levee, the recovery of the Costa Concordia, the new Copenhagen metro, the Four Frankfurt business centre and the new Paris metro line. In 2016, the Group acquired the works for the safety of the Mosul dam in Iraq, overcoming an extremely complicated technological and organizational challenge which received the 2022 DFI Outstanding project award. In 2022, the Group acquired the works for The Line project in Saudi Arabia, the foundation&consolidation works for the North East Link Project in Melbourne and the construction of the consolidation and drainage curtain of the Rogun Main Dam Foundation in Tajikistan, one of the highest dams in the world. Trevi-Finanziaria Industriale S.p.A. has been listed on the Milan stock exchange since July 1999 in the Euronext market.

Sito Web
http://www.trevigroup.com
Settore
Ingegneria civile
Dimensioni dell’azienda
5001 - 10.000 dipendenti
Sede principale
Cesena, Emilia-Romagna
Tipo
Società quotata
Settori di competenza
TREVI Spa: Dams & Levees, Marine Works, Industrial & Civil buildings, Ground & Underground Transportation, Enviromental solution e SOILMEC spa: Equipment for foundation works

Località

Dipendenti presso Trevi Group

Aggiornamenti

  • Visualizza la pagina dell’organizzazione di Trevi Group, immagine

    32.399 follower

    Siamo entusiasti di annunciare la partecipazione di #TreviGroup - in veste di sponsor - all’evento “MIR & CGT 2024 - La Scuola di #Geotecnica del Politecnico di Torino”, il 5 e 6 novembre 2024. Durante queste giornate, dedicate alla memoria dei Prof. Giovanni Barla e Michele Jamiolkowski, si terranno conferenze su tematiche di meccanica e ingegneria delle rocce, nonché di geotecnica. Vi aspettiamo al desk di #TreviGroup per farvi conoscere le nostre tecnologie all’avanguardia e condividere con voi le nostre opportunità di carriera: a darvi il benvenuto ci saranno il Team #Recruiting di Corporate e Filippo Leoni, Business Development Manager di Trevi S.p.A., che ha iniziato il suo percorso nei cantieri in Italia ed a seguito negli Stati Uniti, sviluppando importanti competenze grazie alla possibilità di lavorare su progetti unici al mondo. Con oltre 67 anni di esperienza nel settore delle #fondazioniSpeciali e del consolidamento del suolo, Trevi Group è pronto a mostrarvi il futuro dell’ingegneria geotecnica. Per maggiori informazioni, visitate i nostri siti:  - Careers. al link https://lnkd.in/dtfeXi4D - Corporate www.trevigroup.com - #TreviSpa www.trevispa.com #Geotecnica #Innovazione #Carriere #MIRCGT2024 #greattogether #trevigroupcareer

    • Nessuna descrizione alternativa per questa immagine
  • Trevi Group ha diffuso questo post

    Visualizza la pagina dell’organizzazione di Trevi S.p.A., immagine

    73.642 follower

    🎉 We are thrilled to announce that #TreviSpa has won first prize at the EFFC - European Federation of Foundation Contractors Annual Safety Award 2024 with the "Take care of your Heart" program! The #EFFC annual assembly was held from 3 to 5 October in Rome, where the best European companies in the foundation sector presented their projects on #healthAndsafety. After obtaining second place last year with the “#SafetyAlways” program, this year we achieved the highest recognition in the field of worker #wellbeing. The “Take care of your heart” project, conceived and implemented by our #QHSE Dept., is dedicated to the #prevention of cardiovascular diseases and diabetes among Trevi Group employees and aims to improve daily habits and promote a healthy lifestyle. The EFFC is the reference federation in the #foundationSector, representing over 370 leading companies in Europe. The award won by #TreviSpa is therefore a recognition of the highest level, which underlines the excellence and continuous commitment of the group in promoting health and safety at work. Together, let's continue to build a safer, more wellness-oriented future! #TreviGroup #SafetyAlways

  • Visualizza la pagina dell’organizzazione di Trevi Group, immagine

    32.399 follower

    Today, on this day of reflection and remembrance, we remember the victims of the September 11, 2001 attacks. #GroundZero, the site where the Twin Towers once stood, has become a symbol of resilience and rebirth. #TreviGroup had the honor of contributing to the reconstruction of this place through its subsidiary TREVIICOS, which built the #foundations for the new #WorldTradeCenter transportation hub. This project not only represented a high-level #engineeringChallenge but also a moral and symbolic commitment to the rebirth of a city and a nation. Trevi’s work at Ground Zero is a tribute to the memory of those who lost their lives and a sign of hope for the future. On this day, we join the entire world in remembering and honoring the victims, the survivors, and all those who worked tirelessly for the reconstruction. #NeverForget #TreviSpa #TreviGroup #Soilmec Trevi Group Soilmec Soilmec North America #TREVIICOS

    • Nessuna descrizione alternativa per questa immagine
    • Nessuna descrizione alternativa per questa immagine
  • Trevi Group ha diffuso questo post

    Visualizza la pagina dell’organizzazione di Trevi S.p.A., immagine

    73.642 follower

    #Trevi is glad to announce its involvement and the commencement of the works at the #MetroManila Subway Project Phase 1, Contract Package CP-102. Funded by the Japan International Cooperation Agency (JICA), the Metro Manila Subway Phase 1 foresees the construction of an #underground rapid transit line of about 33 Km, with 14 stations, from Quezon City to Taguig City, extending to Ninoy Aquino International Airport (NAIA) Terminal 3. The Metro Manila Subway Phase 1 is expected to serve 1.5 million passengers daily, providing a faster, safer, and more convenient mode of transportation. #TreviFoundationsPhilippines (Trevi Group) has been engaged by the #Nishimatsu- D.M. CONSUNJI, INC. (DMCI) Joint Venture (NDJV) for the Contract Package CP-102, to install #DiaphragmWalls and King Posts for the construction of Quezon Avenue Station and East Avenue Station. Stay tuned as we contribute to enhancing Manila's urban landscape and connectivity!

    • Nessuna descrizione alternativa per questa immagine
  • Visualizza la pagina dell’organizzazione di Trevi Group, immagine

    32.399 follower

    CONFERENCE CALL INVITATION: “2024 Half Year Results” 📅 Thursday, August 8th 2024 at 04:00 p.m. (CEST) Speakers: ➡ Giuseppe Caselli, C.E.O. of Trevi Group ➡ Massimo Sala, C.F.O. of Trevi Group For those wishing to participate, please call one of the following numbers, starting 15 minutes before the beginning of the conference call to facilitate the registration process: ➡ 39 02 802 09 11 for Italy and the rest of the world; ➡ 44 1 212818004 for UK only; ➡ 1 718 7058796 (toll-free 1 855 2656958) for United States only. Alternatively, it is possible to connect from all over the world, via PC or smartphone, through this link (the use of headphones is recommended for optimal audio): ➡ https://lnkd.in/dz5BJV3u It will also be possible to follow the event in webcast live (audio presentation slides) via PC or smartphone through this link):  ➡ https://lnkd.in/dckxHkUu INVITO ALLA CONFERENCE CALL: "Risultati Semestrale 2024" Giovedì 8 agosto 2024 alle ore 16:00 (CEST) Relatori: ➡ Giuseppe Caselli, C.E.O. of Trevi Group ➡ Massimo Sala, C.F.O. of Trevi Group Per chi desidera partecipare, preghiamo di telefonare a uno dei seguenti numeri, a partire da 15 minuti prima dell’inizio della conference call per facilitare il processo di registrazione: ➡ 39 02 802 09 11 per l’Italia e resto del mondo; ➡ 44 1 212818004 per UK; ➡ 1 718 7058796 (numero verde 1 855 2656958) per gli Stati Uniti. In alternativa è possibile connettersi da tutto il mondo, tramite pc o smartphone, attraverso questo link (è consigliato l'utilizzo delle cuffie per un audio ottimale):  ➡ https://lnkd.in/dz5BJV3u Sarà inoltre possibile seguire il tutto anche in modalità live streaming (audio slide di presentazione), tramite pc o smartphone, attraverso questo link (è consigliato l'utilizzo delle cuffie per un audio ottimale):  ➡ https://lnkd.in/dckxHkUu

    • Nessuna descrizione alternativa per questa immagine
  • Trevi Group ha diffuso questo post

    Visualizza la pagina dell’organizzazione di Trevi S.p.A., immagine

    73.642 follower

    The main goal of the grouting consolidation/curtain of the #RogunDam Project is to avoid the uncontrolled leakage from the reservoir through the rock mass foundations below the dam and the near surface zones exposed to very high hydraulic gradients. Each construction phase requires serious, disciplined, and organized work in a highly challenging context. #TreviSpa, with its own motivated and experienced site teams, is proceeding with the works in accordance with the work schedule and high quality plan required by the Sub-Contract. (The Project is commissioned by #OJSC Rogun HPP with Webuild as the Lot 2 Contractor responsible for the construction of the Rogun Dam).

    • Nessuna descrizione alternativa per questa immagine
  • Trevi Group ha diffuso questo post

    Visualizza la pagina dell’organizzazione di TREVIICOS, immagine

    10.678 follower

    We are thrilled to announce that Lorenzo Faedi, #Treviicos Senior Geotechnical Engineer - Technical Manager, will be presenting at the upcoming course on Grouting and Ground Improvement hosted by the Colorado School of Mines that will take place in Golden, CO, from July 29th to August 1st, 2024.   Lorenzo, with his extensive background and over a decade of experience in #groundEngineering, will delve into the intricacies of #JetGrouting and #DeepMixing Methods, including test sections, QC and practical applications in the field. His sessions, scheduled for July 30th and August 1st, will offer valuable insights and knowledge to industry professionals. ➡ Don’t miss this opportunity to learn more and to network with fellow professionals.!   For more information and to register for the course, please visit the School of Mines’ official website: https://lnkd.in/gXzFQc6P

    • Nessuna descrizione alternativa per questa immagine
  • Trevi Group ha diffuso questo post

    Visualizza la pagina dell’organizzazione di Trevi S.p.A., immagine

    73.642 follower

    The #ROGUNDam Project foresees 3 different types of drilling and injection activities within the Main Dam Grouting Galleries carried out by #TreviSpa: The preliminary consolidation around the galleries, the grout curtain (Sub Horizontal, Downwards, Upwards, Fan) and the drainage curtain of the Main Dam.. The grout curtain activities consist of the sequential execution of 3 grout curtain lines, namely the A line (on the downstream side), the Line B (on the upstream side) and the central Line C The primary holes will be drilled first, followed by the secondary and finalized by the tertiary grouting boreholes. The grouting evaluation will be based on the closure criteria and grout volume absorptions detected per each stage of each borehole. (The Project is commissioned by #OJSC Rogun HPP with Webuild as the Lot 2 Contractor responsible for the construction of the Rogun Dam).

    • Nessuna descrizione alternativa per questa immagine
  • Visualizza la pagina dell’organizzazione di Trevi Group, immagine

    32.399 follower

    Il #GruppoTrevi ha svolto un ruolo fondamentale nella formazione degli studenti dell'Istituto "S. Mottura" di Caltanissetta durante l'anno scolastico 2023/2024. Attraverso una collaborazione attiva, gli alunni hanno avuto l'opportunità di:   ➡ Esperienza diretta: il personale tecnico di Trevi S.p.A. ha rivestito il ruolo di insegnante con l’obiettivo di avvicinare gli studenti al mondo del lavoro formandoli su contenuti inerenti al know-how del gruppo, le esperienze tecniche e la professionalità maturata negli anni.   ➡ Esperienza sul campo: hanno seguito le fasi realizzative delle fondazioni di un viadotto ferroviario nel cantiere di Nizza di Sicilia.   ➡ Essere inseriti nella realtà lavorativa: nove studenti sono stati selezionati per un periodo di tirocinio che prevederà un passaggio di formazione in sede e a seguire pratica nei cantieri su territorio nazionale.   Un in bocca al lupo agli studenti per questo nuovo inizio. https://lnkd.in/d9utMJnD

    • Nessuna descrizione alternativa per questa immagine

Pagine affiliate

Pagine simili

Sfoglia le offerte di lavoro