Skip to content

support startTs and endTs in cdc task #25939

support startTs and endTs in cdc task

support startTs and endTs in cdc task #25939

Triggered via pull request December 31, 2024 13:18
@ck89119ck89119
synchronize #21023
Status Failure
Total duration 49m 55s
Artifacts 3

entrypoint.yaml

on: pull_request_target
CHECK PR VALID
3s
CHECK PR VALID
Matrixone Utils CI  /  check_organization_user
4s
Matrixone Utils CI / check_organization_user
Matrixone Standlone CI  /  Multi-CN e2e BVT Test on Linux/x64(LAUNCH, PROXY)
27m 34s
Matrixone Standlone CI / Multi-CN e2e BVT Test on Linux/x64(LAUNCH, PROXY)
Matrixone Standlone CI  /  e2e BVT Test on Linux/x64(LAUNCH, PESSIMISTIC)
24m 6s
Matrixone Standlone CI / e2e BVT Test on Linux/x64(LAUNCH, PESSIMISTIC)
Matrixone CI  /  UT Test on Ubuntu/x86
18m 6s
Matrixone CI / UT Test on Ubuntu/x86
Matrixone CI  /  UT Test on Darwin/x86
0s
Matrixone CI / UT Test on Darwin/x86
Matrixone CI  /  SCA Test on Ubuntu/x86
10m 50s
Matrixone CI / SCA Test on Ubuntu/x86
Matrixone Upgrade CI  /  Compatibility Test With Target on Linux/x64(LAUNCH)
49m 35s
Matrixone Upgrade CI / Compatibility Test With Target on Linux/x64(LAUNCH)
Matrixone Upgrade CI  /  Compatibility Test With Release on Linux/x64(LAUNCH)
0s
Matrixone Upgrade CI / Compatibility Test With Release on Linux/x64(LAUNCH)
Matrixone Compose CI  /  multi cn e2e bvt test docker compose(Optimistic/PUSH)
21m 44s
Matrixone Compose CI / multi cn e2e bvt test docker compose(Optimistic/PUSH)
Matrixone Compose CI  /  multi cn e2e bvt test docker compose(PESSIMISTIC)
28m 15s
Matrixone Compose CI / multi cn e2e bvt test docker compose(PESSIMISTIC)
Matrixone Standlone CI  /  e2e BVT Test on Linux/x64(LAUNCH,Optimistic)
33m 32s
Matrixone Standlone CI / e2e BVT Test on Linux/x64(LAUNCH,Optimistic)
Matrixone Utils CI  /  Coverage
38m 54s
Matrixone Utils CI / Coverage
Matrixone Utils CI  /  pr-size-label
3s
Matrixone Utils CI / pr-size-label
Matrixone Utils CI  /  docu_issue_check
0s
Matrixone Utils CI / docu_issue_check
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
Matrixone Utils CI / Coverage
RPC failed; curl 92 HTTP/2 stream 0 was not closed cleanly: CANCEL (err 8)
Matrixone Utils CI / Coverage
3985 bytes of body are still expected
Matrixone Utils CI / Coverage
early EOF
Matrixone Utils CI / Coverage
fetch-pack: invalid index-pack output
Matrixone Utils CI / Coverage
Process completed with exit code 1.
Matrixone Utils CI / Coverage
Process completed with exit code 123.
CHECK PR VALID
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
coverage-files
2.41 MB
final-result-files
1.12 MB
reports
1.42 MB