Skip to content

Merge pull request #7 from dsbilling/main #4

Merge pull request #7 from dsbilling/main

Merge pull request #7 from dsbilling/main #4

Triggered via push May 21, 2024 07:31
Status Failure
Total duration 41s
Artifacts

main.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
P8.3 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.2 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_11___pr" failed.
P8.2 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_11___pr" failed.
P8.3 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_11___pr" failed.
P8.3 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_11___pr" failed.
P8.2 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_11___pr" failed.
P8.3 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_11___pr" failed.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_11___pr" failed.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The operation was canceled.