Jump to content

Tampa Southern Railroad

From Wikipedia, the free encyclopedia

Tampa Southern Railroad
Map
Route of the Tampa Southern Railroad at its greatest extent
Overview
Reporting markTAS
Dates of operation1917–1967
SuccessorAtlantic Coast Line Railroad
Seaboard Coast Line Railroad
CSX Transportation
Technical
Track gauge4 ft 8 12 in (1,435 mm) standard gauge

The Tampa Southern Railroad was a subsidiary of the Atlantic Coast Line Railroad (ACL) originally running from Uceta Yard in Tampa south to Palmetto, Bradenton, and Sarasota with a later extension southeast to Fort Ogden in the Peace River valley built shortly after. It was one of many rail lines completed during the Florida land boom of the 1920s. Most of the remaining trackage (between Tampa and Bradenton) now serves as CSX Transportation's Palmetto Subdivision.[1][2] Another short portion just east of Sarasota also remains that is now operated by Seminole Gulf Railway.

History

[edit]
Former Bradenton passenger depot, which is now a medical clinic

The Tampa Southern Railroad was chartered on January 31, 1917,[3] and incorporated on March 5, 1917,[4] as a subsidiary of the Atlantic Coast Line Railroad (ACL), who already had a sizeable network in Florida. The officers of the new company were all ACL officers, and were reelected at several subsequent shareholders meetings.[5][6] The Tampa Southern would principally compete with the Seaboard Air Line Railroad's (SAL) parallel Sarasota Subdivision that ran from Durant to Venice which had been serving Bradenton and Sarasota since 1903.

The Tampa Southern's crews began work soon after incorporation and the company's leadership projected that trains could be running by the start of 1918.[7][8] Bradenton granted a right-of-way through its city and land for a station and other supporting structures there in early January 1918.[9] The first train from Tampa to Palmetto ran on December 5, 1918.[10] The railroad reached Bradenton and used it as its terminus, carrying through Pullman sleepers from connecting Atlantic Coast Line trains.[11] The tracks were completed to Sarasota by May 1924, and the first passenger train arrived in Sarasota in December of that year.[12]

The Tampa Southern began at the ACL's Uceta Yard in Tampa and ran south, paralleling the east shore of Tampa Bay. Just northeast of Palmetto, a loop was constructed through Ellenton to serve agricultural growers. Known as the "Ellenton Belt Line", the now abandoned loop branched off the main line near Rubonia and ran in a roughly rectangular trajectory through Ellenton before returning to the main line in Palmetto. A short spur to Terra Ceia, which is now abandoned, also existed near this area.[13]: 150 

South of Palmetto, the tracks crossed a trestle across the Manatee River and entered Bradenton. Bradenton's passenger depot (which still stands today and serves as a medical clinic) was built just south of the river.[14] The tracks then turned southeast for a short distance and crossed the SAL's track before turning south again and into Sarasota near Fruitville.

In 1928, a spur to the Payne Terminal at Hog Creek was built just north of the Sarasota passenger depot (which was located at Main Street and School Avenue).[15] The Seaboard Air Line attempted to block the ACL from accessing the terminal since it had three spur tracks there that the ACL would have to cross. Since these spurs were on city property, the city authorized their removal to so the ACL to build their spur to the terminal.[16]

Extension to Fort Ogden

[edit]

With optimism for the company's petition to the Interstate Commerce Commission,[17] in 1925 surveyors were plotting a line beyond Sarasota to connect with Florida's east coast.[18] By 1927, the line was extended southeast from Sarasota to Fort Ogden in Desoto County. From the Sarasota depot, the line turned east through Fruitville, briefly running directly beside the Seaboard line before that line turned south towards Venice. Once out of Sarasota, the line turned southeast passing through Utopia before crossing the Myakka River and continuing through Honore and Sidell. It crossed the Seaboard Air Line Railroad's Boca Grande Subdivision at Platt. The line then crossed Peace River just before merging with the ACL's Lakeland–Fort Myers Line at Southfort (just south of Fort Ogden). Today, Desoto County Road 761 runs along the former right of way from the Peace River to Fort Ogden. Freight stations were built at Belspur, Palmersville, Honore, and Sidell. The extension included a spur to the Ringling Bros. and Barnum & Bailey Circus Sarasota headquarters near Fruitville. The extension also served Palmer Farms and their packinghouse at Belspur. Adrian Honore, brother of local socialite Bertha Honore Palmer, also owned significant amounts of land along the line east of Sarasota.[19]

While freight was the primary intent of the Fort Ogden extension, it ended up having the additional benefit of providing a direct route for passenger trains traveling from Tampa and Sarasota further down the coast to Fort Myers and Naples. The extension would initially serve a pair of passenger trains from Tampa Union Station to Fort Myers and Naples that included through Pullman coaches from the Dixie Limited and the Palmetto.[19]

Most of the Fort Ogden extension was removed by 1949 since it did not generate the freight traffic the Atlantic Coast Line had hoped for. The line was truncated at Belspur just east of Fruitville.[20]

Later years

[edit]
Bascule bridge over the Manatee River

By 1949, the line had daily service from Tampa Union Station to Sarasota by the Atlantic Coast Line's West Coast Champion as well as a daily local passenger train. Two freight trains also ran to Sarasota six days a week.[21]

In 1956, the swing span on the Manatee River trestle was replaced with the current bascule span. The bascule span was installed about 200 feet north of where the swing span was located and the Army Corps of Engineers realigned the navigation channel to pass through the new bascule.[22]

In 1967, the Atlantic Coast Line Railroad merged with the Seaboard Air Line to form the Seaboard Coast Line Railroad (SCL). Connections were established between the Tampa Southern and the Seaboard route in a number of locations. Former Tampa Southern track from Bradenton to Matoaka was removed and the parallel east-west track through Fruitville was consolidated on to the former SAL track. The Tampa Southern track from Fruitville to Belspur would remain as a spur until the late 1970s.[23]

The merger also resulted in the removal of the SAL's swing bridge over the Manatee River (which was located a short distance upstream of both the Tampa Southern's bascule bridge and the Desoto Bridge). The city of Bradenton unsuccessfully attempted to have the Seaboard Coast Line remove the Tampa Southern bridge instead since it went right through downtown Bradenton's waterfront.[24]

The Tampa Southern route (as well as the remaining SAL route south from Bradenton to Venice) was then designated as the Palmetto Subdivision by the Seaboard Coast Line after the merger. It became the main route for all trains between Palmetto and Tampa since it provided a more direct route to the Tampa yards. The Champion continued to run the line and continued south to Venice after the merger.[25] All passenger service ended in 1971 after all of the Seaboard Coast Line's passenger operations were taken over by Amtrak. The line would later become the route of Tropicana's Juice Train, which was originally operated on the former Seaboard Air Line tracks to bypass Tampa. The juice train continues to run the line today.

At the north end, the line was connected with the S Line (the former SAL main line) into Yeoman Yard, the Seaboard Air Line's classification yard that subsequently became the Seaboard Coast Line's main yard. Uceta Yard, the Atlantic Coast Line's main yard, has since become an intermodal terminal and car storage facility. The connection with the A Line (the former ACL main line) was severed after the cessation of passenger service.[26]

In 1980, the Seaboard Coast Line's parent company merged with the Chessie System, creating the CSX Corporation. The CSX Corporation initially operated the Chessie and Seaboard Systems separately until 1986, when they were merged into CSX Transportation. The Seaboard Air Line's original route between Durant and Willow was then removed in 1986, leaving the Tampa Southern route as the only thru route.[27]

Current operations

[edit]
CSX pulling the Tropicana Juice Train across the Manatee River Bridge in Bradenton in 2018. Concrete footings from the bridge's former swing span are visible under the trestle.

Most of the remaining Tampa Southern Railroad trackage from Tampa to Bradenton comprises CSX's Palmetto Subdivision, with the northernmost five miles being part of the Tampa Terminal Subdivision. A control point on the line between State Road 60 and Yeoman Yard is named "TS," a reference to the Tampa Southern.[2]

The line today serves The Mosaic Company's Riverview plant near the Alafia River, TECO Energy's Big Bend Power Station in southern Hillsoborough County, and Port Manatee in northern Manatee County. It also continues to serve the Tropicana Juice Plant in Bradenton, with Tropicana's Juice Train continuing to be the most consistent service on the line today.

The main Tampa Southern Railroad tracks end near the Tropicana Plant in Bradenton. Although, the Palmetto Subdivision continues south from here a short distance to Oneco along the former Seaboard line. In Oneco, it connects with Seminole Gulf Railway, who operates the remaining Seaboard tracks south through Sarasota. Seminole Gulf also operates a discontinuous segment of the Tampa Southern Railroad just east of Downtown Sarasota. It is part of their track from Sarasota to Matoaka. US 301 now runs on the roughly five-mile abandoned segment between of the Tampa Southern between Bradenton and Matoaka.

Historic Stations

[edit]
Milepost[a] City/Location Station[28][21] Image Connections and notes
A 881.7 Tampa Tampa Union Station located on Atlantic Coast Line Railroad Main Line
A 879.8
AZA 879.8
Uceta junction with:
AZA 885.0 East Tampa
AZA 892.4 North Ruskin
AZA 898.3 Ruskin
AZA 901.9 Sun City
AZA 906.5 Piney Point junction with Port Manatee Railroad
AZA 910.0 Gillette
AZA 914.8 Palmetto Palmetto junction with Seaboard Air Line Railroad Palmetto Spur
AZA 916.2 Bradenton Bradentown later renamed Bradenton
junction with Seaboard Air Line Railroad Sarasota Subdivision & Bradenton Spur
AZA 917.9 Oneco
AZA 923.4 Matoaka
AZA 928.3 Sarasota Sarasota demolished in 1986
AZA 932.4 East Sarasota
AZA 934.0 Belspur
Palmersville
AZA 939.5 Utopia
AZA 946.4 Honore
AZA 955.7 Sidell
AZA 966.2 Platt junction with Seaboard Air Line Railroad Boca Grande Subdivision
AZA 969.1 Fort Ogden Southfort junction with Atlantic Coast Line Railroad Lakeland–Fort Myers Line

See also

[edit]

Notes

[edit]
  1. ^ When first built, the Atlantic Coast Line Railroad (ACL) gave the Tampa Southern line the milepost prefix ZA. After the 1967 merger, the Seaboard Coast Line (SCL) added A to the beginning of all ex-ACL lines, making the prefix AZA.[21][23]

References

[edit]
  1. ^ "CSX Palmetto Sub". Radio Reference Wiki.[unreliable source?]
  2. ^ a b CSX Transportation (January 1, 2005). "CSX Jacksonville Division Timetable" (PDF). Multimodal Ways.
  3. ^ "Notice of Application for Charter of Tampa Southern Railroad Company". The Tampa Times. Tampa, Florida. February 17, 1917. p. 21 – via Newspapers.com. Open access icon
  4. ^ Costello, Harry (May 3, 1978). "Tampa Southern Railroad: 'Ghost line' serves area". The Tampa Times. Tampa, Florida. p. 40 – via Newspapers.com. Open access icon
  5. ^ "Coast Line Men Are Directors of Tampa Southern Railroad". The Tampa Times. Tampa, Florida. April 6, 1917. p. 13 – via Newspapers.com. Open access icon
  6. ^ "Tampa Southern Railroad Re-elects All Officers". The Tampa Tribune. Tampa, Florida. April 4, 1930. p. 9 – via Newspapers.com. Open access icon
  7. ^ "Tampa Southern To Run Trains Jan. First". The Tampa Tribune. Tampa, Florida. March 18, 1917. p. 5 – via Newspapers.com. Open access icon
  8. ^ "To Operate Trains On Tampa Southern By First Of Year". The Tampa Times. Tampa, Florida. March 19, 1917. p. 10 – via Newspapers.com. Open access icon
  9. ^ "Bradentown [sic] Aids Tampa Southern". The Tampa Tribune. Tampa, Florida. January 6, 1918. p. 4 – via Newspapers.com. Open access icon
  10. ^ "Our New Friends". The Tampa Tribune. Tampa, Florida. p. 8 – via Newspapers.com. The first train on the new Tampa Southern Railroad ran from Tampa to Palmetto yesterday... Open access icon
  11. ^ "Tampa Southern Line to Extend to Sarasota; Service to Be Improved". The Tampa Tribune. Tampa, Florida. April 2, 1923. p. 7 – via Newspapers.com. Open access icon
  12. ^ "Atlantic Coast Line Railroad Depot". Sarasota County (official website). Archived from the original on March 4, 2016. Retrieved October 18, 2015.
  13. ^ Turner, Gregg M. (2003). A Short History of Florida Railroads. Charleston, SC: Arcadia Publishing. ISBN 978-0-7385-2421-4.
  14. ^ "Train Depot in Bradenton". Charlotte County, Florida: History Collections Online. Archived from the original on July 23, 2012. Retrieved August 14, 2013.
  15. ^ "Atlantic Coast Line Railroad Depot". Sarasota History Alive!. Archived from the original on July 23, 2012. Retrieved August 14, 2013.
  16. ^ "Vintage Sarasota: Atlantic Coast Line Railway Remembered". Sarasota Magazine. Retrieved September 24, 2021.
  17. ^ "Rail Extension Approval Seen; Favorable Action On Petition Expected In 30 Days". The Tampa Tribune. Tampa, Florida. April 25, 1925. p. 9 – via Newspapers.com. Open access icon
  18. ^ "Surveyors Start Work on Proposed Cross State Line". The Tampa Times. Tampa, Florida. March 16, 1925. p. 16 – via Newspapers.com. Open access icon
  19. ^ a b "Atlantic Coast Line Railroad Depot". Sarasota History Alive!. Retrieved May 27, 2020.
  20. ^ Turner, Gregg M. (December 1, 1999). Railroads of Southwest Florida. Images of America. Arcadia Publishing.
  21. ^ a b c Atlantic Coast Line Railroad Southern Division Timetable (1949)
  22. ^ "ACL To Open New Span Tomorrow, Close Old Draw". Bradenton Herald. April 26, 1956. Retrieved December 19, 2023 – via Newspapers.com.
  23. ^ a b Seaboard Coast Line Railroad Jacksonville Division and Tampa Division Timetable (1977)
  24. ^ "Seaboard and Bradenton Have Dispute Over Manatee River Trestles". Sarasota Herald Tribune. June 12, 1969. Retrieved December 22, 2013 – via Google News.
  25. ^ Seaboard Coast Line Railroad Tampa Division Timetable (1970)
  26. ^ Cox, Jim (2011). Rails Across Dixie: A History of Passenger Trains in the American South. Jefferson, North Carolina: McFarland & Company, Inc. ISBN 978-0-7864-4528-8. Retrieved June 20, 2019 – via Google Books.
  27. ^ "The Sarasota Subdivision". Abandoned Rails. Retrieved December 22, 2013.
  28. ^ Florida Railroads, Passenger Stations and Stops