Jump to content

Railway stations in Guinea

From Wikipedia, the free encyclopedia

Railway stations in Guinea include:

Maps

[edit]

File:Railways in Guinea.svg

Guinea Railway Map

Cities served by rail

[edit]

North Trans-Guinean Railways (Under construction)

[edit]

This 135 km long Standard Gauge railway connects bauxite mines at Boffa with a new port at Boké.[1] Dapilon-Santou

Northern line

[edit]

This line is 1,435 mm (4 ft 8 12 in) gauge and carries about 12 million tonnes per annum.

Central line

[edit]

This line is 1,000 mm (3 ft 3 38 in) gauge and heads off in a northwestern direction.

Central Trans-Guinean Railway

[edit]

This line is 1,000 mm (3 ft 3 38 in) gauge. Conversion to 1,435 mm (4 ft 8 12 in) gauge has been proposed.[2] Rejuvenation of this line will be paid for by allow Simandou North iron ore to be exported to a more close by port in Liberia.[3]


Southern branch

[edit]

This line is 1,435 mm (4 ft 8 12 in).

South Western line

[edit]

This line is 1,435 mm (4 ft 8 12 in) and parallels the Southern line.

South Trans-Guinean Railways (Proposed)

[edit]

The heavy duty Transguinean Railways is about 670 km long and would be 1,435 mm (4 ft 8 12 in) standard gauge. It goes from iron ore mines in the south east near Simandou and bauxite mines in the north to a new port at Matakong.[7] The link may be double track.[8] This project has been delayed by a coup.[9] In 2001, this line was estimated to cost $3,000m.[10] The line includes 21 km of tunnels which might mean one tunnel 21 km long, or 21 tunnels each 1 km long.[11]

Tougué Branch

[edit]

Proposed Guinea - Liberia Railway

[edit]

(This line would be heavy duty 1,435 mm (4 ft 8 12 in) gauge) This line is badly affected by the theft of rail spikes and plates which can cause derailments.

Proposed Mali railway

[edit]

Timeline

[edit]

2020

[edit]
  • Work starts on Dapilon (port) - Santou (mine) railway) 1435mm gauge

2014

[edit]

2010

[edit]
  • Guinea and Liberia agree to build transborder railway for iron ore traffic.[5] This railway would be shorter and cheaper than a railway entirely within Guinea territory. As part of the deal, the narrow gauge Trans-Guinean railway would be renovated. 1435mm gauge. Later rescinded.

See also

[edit]

References

[edit]
  1. ^ "Dapilon-Santou Rail Project".
  2. ^ Janes World Railways 2002-2003 p182
  3. ^ "Liberian ore line to spur Guinea revival".
  4. ^ a b "BSG Resources Limited". Archived from the original on 2010-08-03. Retrieved 2010-05-31.
  5. ^ a b c "Archived copy" (PDF). Archived from the original (PDF) on 2011-07-08. Retrieved 2010-06-01.{{cite web}}: CS1 maint: archived copy as title (link)
  6. ^ Janes World Railways 2002-2003 p102
  7. ^ "Transguinean". Archived from the original on 2016-03-03. Retrieved 2008-06-09.
  8. ^ "Press Release Distribution".
  9. ^ Garnaut, John (2009-04-27). "China knocked back deal to undermine Rio". The Age. Melbourne.
  10. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2015-04-02. Retrieved 2010-03-31.{{cite web}}: CS1 maint: archived copy as title (link)
  11. ^ Rail Map
  12. ^ "Simandou to start at 2Mt in 2012 - Vale".
  13. ^ Garnaut, John (2009-04-27). "Why Rio's Guinea iron ore was an offer Beijing could refuse". The Sydney Morning Herald.
  14. ^ "Beny's railway coup".
  15. ^ "Liberian ore line to spur Guinea revival". Railway Gazette International. 2010-05-31. Retrieved 2010-10-25.
  16. ^ a b http://www.lldc2conference.org/custom-content/uploads/2013/07/Mali-National-report-English.pdf Archived 2021-04-20 at the Wayback Machine [bare URL PDF]