Opened2014
Owned byKN Energies
Type of harbourliquified natural gas terminal
No. of berths1 (Platform for LNG tankers)
Statistics
Website
www.kn.lt/en/
Terminal was built in island of Kiaulės Nugara (left center) in Klaipėda port (old pic).
Terminal is located in Northern part of Port of Klaipėda (not in picture).
FSRU Independence in the port of Klaipėda

Klaipėda LNG terminal (Lithuanian: Klaipėdos suskystintų gamtinių dujų terminalas) is a liquefied natural gas import terminal in the port of Klaipėda, Lithuania. It cost US$128 million to construct.[1] The developer and owner of the project is KN Energies.

The terminal started operating on 3 December 2014.[2] After the completion of the Klaipėda LNG FSRU, Lithuania became the fifth country in the world to use FSRU technology for liquefied natural gas.[3]

History

[edit]

On 22–27 January 2014 pilot test was conducted in order to assess the FSRU Independence's performance and seaworthiness. Later on the vessel sailed to the sea and the ship's sea trial lasted nearly a week. Earlier, in the beginning of January the ship's propulsion system was tested, later crew safety equipment and other range of testing conducted.[4] It was delivered in March 2014 and was reached the terminal on 27 October 2014.[5]

In June 2014 supplying platform was finished to be built in Kiaulės Nugara.[6] It is one of the four main elements of 450-metre (1,480 ft) length embankment (together with mounting and mooring field, steel bridges and high-pressure gas platform).

On 27 October 2014 the main vessel arrived to Klaipėda's Port. The welcoming ceremony of Independence arrival was broadcast live by national broadcaster LRT televizija, while the ship was greeted by Lithuanian President Dalia Grybauskaitė. Representatives from Latvia, Estonia, Norway, the United States, Finland, Sweden and European Council also participated at the opening.[7]

On 3 December 2014 the terminal started operating.[2]

On 27 October 2017, LNG Distribution Station at Klaipėda Port started operating. Station is dedicated to create a comprehensive LNG logistics chain in the Baltic region.[8]

On 7 January 2019, the world's largest liquefied natural gas bunkering vessel Kairos, owned by KN and German company Nauticor, was launched at that time. The ship's main activity in Klaipėda port is to transport LNG from the LNG terminal to LNG distribution station.[9] In September 2019, Klaipėdos Nafta sold its shares in Kairos, the company that owns the bunkering vessel Kairos.

On 6 December 2024, the Klaipėda LNG terminal operator, the state-owned KN Energies (formerly Klaipėdos Nafta), officially bought the FSRU from the Norwegian company Höegh Evi (formerly Hoegh LNG) for USD 153.5 million, and the same day the FSRU was registered in the Lithuanian Register of Sea Ships. At the takeover ceremony, the Lithuanian state flag was hoisted on the FSRU and homeport changed from Singapore to Klaipėda.[10]

Storage and regasification vessel

[edit]

FSRU Independence, an LNG carrier built by Hyundai Heavy Industries, is designed as a floating LNG storage and regasification unit for the terminal. It is leased from Höegh LNG for 10 years with an option of buyout.[1] In December 2024, the FSRU was sold to the Lithuanian company KN Energies,.

FSRU Independence has a maximum capacity to handle of 3.75 billion cubic metres per annum (132 billion cubic feet per annum) of natural gas, while it has four storage tanks with total capacity of 170,000 cubic metres (6,000,000 cu ft).[1][11] Lithuania also has access to the Inčukalns underground gas storage facility in Latvia.[12]

Supply

[edit]

Equinor was contracted to supply LNG for five years to cover the minimum operational need of the terminal.[1] In 2015, Equinor was to supply 540 million cubic metres (19 billion cubic feet) of natural gas.[13] The first test cargo was delivered on 28 October 2014 by LNG tanker Golar Seal.[14] Gas was originating from the Snøhvit field (Melkøya LNG plant). It was imported by Litgas, a subsidiary of Lietuvos Energija.[11]

At the beginning of 2016, a renewed contract was signed with a change in the price formula, a reduction in the annual volume of gas supplied, and an extension of the contract duration until the end of 2024. At the end of 2024, it was decided not to renew this contract.[15]

Awards

[edit]

At the 8th European Gas Conference 2015 in Vienna, Austria Klaipėda LNG FSRU won the Project of the Year award.[16]

Supporting infrastructure

[edit]

Previously Klaipėda was only connected to one main pipeline of Klaipėda–Panevėžys pipeline within Lithuanian gas grid.[17]

To ensure continuous supply of gas from Klaipėda LNG FSRU to Lithuanian gas market, additional main gas pipelines built, connecting to the terminal:

See also

[edit]

References

[edit]
  1. ^ a b c d Seputyte, Milda (27 October 2014). "Lithuania Grabs LNG in Effort to Curb Russian Dominance". Bloomberg Businessweek. Bloomberg. Archived from the original on 27 October 2014. Retrieved 27 October 2014.
  2. ^ a b Pradeda veikti SGD terminalas. Vakarų ekspresas, 2014-12-03
  3. ^ World's LNG Liquefaction Plants and Regasification Terminals
  4. ^ "FSRU 'Independence' successfully sailed off on a sea trial". Archived from the original on 11 February 2014. Retrieved 11 February 2014.
  5. ^ Į Klaipėdą atplaukė laivas "Independence"
  6. ^ Masiulis apie SkGD: jau matyti pabaigos pradžia
  7. ^ "Floating LNG terminal "Independence" sails into Klaipėda". Delfi. 27 October 2014. Retrieved 28 October 2014.
  8. ^ "Kn - Kuriame Nepriklausomybę".
  9. ^ "Kn - Kuriame Nepriklausomybę".
  10. ^ https://www.kn.lt/en/news/news/lithuania-takes-ownership-of-fsru-independence-national-flag-raised-aboard/8916
  11. ^ a b "Golar Seal to deliver Lithuania's first LNG cargo". Argus Media. 27 October 2014. Retrieved 27 October 2014.
  12. ^ "For the first time natural gas from Lithuanian LNG terminal will be stored in the Latvian Inčukalns storage facility". Ministry of Energy of Lithuania. 26 June 2017. Retrieved 6 January 2022.
  13. ^ "Lithuania Looks To LNG Terminal To Breaking Russian Monopoly". RFE/RL. 27 October 2014. Retrieved 27 October 2014.
  14. ^ Bandomasis dujų krovinys - jau Klaipėdoje. Vakarų ekspresas, 2014-10-28
  15. ^ https://www.lrt.lt/naujienos/verslas/4/2437106/pasibaigus-sutarciai-su-equinor-vartotojai-nebemokes-sgd-
  16. ^ Lithuanian LNG terminal wins European gas project of the year award
  17. ^ "Magistralinio dujotiekio trasa. Gyventojai nerimauja dėl kompensacijų dydžio". tzinios.lt. Retrieved 5 February 2021.
  18. ^ „Amber Grid“ užbaigė magistralinio dujotiekio Jurbarkas–Klaipėda statybą. 15min.lt. Nuoroda tikrinta 2022-02-27.
  19. ^ Pradeda veikti strateginis dujotiekis Klaipėda–Kuršėnai