Line 4 is an underground rapid transit line in Milan, Italy, part of the Milan Metro. The line color is blue. The first section opened on 26 November 2022[2] and as of 2023 it is 7.3 km (4.5 mi) long with 8 stations.[3] The full line opened on 12 October 2024[3] The line is 15.2 km (9.4 mi) long with 21 stations.[4]
M4 | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Locale | Milan, Italy | ||
Connecting lines | |||
Stations | 21 | ||
Website | Official website | ||
Service | |||
Type | Rapid transit | ||
System | Milan Metro | ||
Operator(s) | Azienda Trasporti Milanesi | ||
Rolling stock | Hitachi Rail Italy Driverless Metro | ||
Daily ridership | 40,000 (July 2023-February 2024)[1] | ||
History | |||
Opened | 26 November 2022 (first phase) | ||
Last extension | 12 October 2024 (full line) | ||
Technical | |||
Line length | 15.2 km (9.4 mi) | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
Electrification | 750 V DC third rail | ||
|
The line features automatic driverless trains[5] and is designed for a capacity of 24–28,000 passengers per hour in each direction.[6] The expected annual ridership is 87 million.
Construction
editThe first three stations of the line (Linate-Repetti-Forlanini) was originally planned to be completed in 2015, as part of the works for the Milan Expo. However, delays in planning, financing[7] and construction works forced to postpone the opening, with the first section opening on 26 November 2022[2][8] and the rest of the line expected to open by 2023.[9] Once completed, the line will be 15 km (9.3 mi) long with 21 stations, compared to its current 8 operational stops. The remaining 13 stops opened on 12 October 2024.[10]
The consortium ATM-Webuild is responsible for the construction works.[11][12]
Of the total estimated cost of about €1.7 billion, the Government of Italy will cover €786 million via a grant, the municipal government of Milan will cover €400 million, and €512 million will be funded by private investors.[11]
Route
editThe line is planned to connect the south-western neighborhood of Lorenteggio with Linate Airport on the east, passing through the city center. All stations are underground.
Station Name | Transfer | Opening |
---|---|---|
San Cristoforo FS | 12 October 2024[10] | |
Segneri | ||
Gelsomini | ||
Frattini | ||
Tolstoj | ||
Bolivar | ||
California | ||
Coni Zugna | ||
Sant'Ambrogio | ||
De Amicis | ||
Vetra | ||
Santa Sofia | ||
Sforza-Policlinico | (Missori) | |
San Babila | 4 July 2023 | |
Tricolore | ||
Dateo | 26 November 2022[2] | |
Susa | ||
Argonne | ||
Stazione Forlanini | ||
Repetti | ||
Linate Aeroporto |
Rolling stock
editThe line uses Hitachi Rail Italy Driverless Metro automatic driverless trains.[5] The line will be operated by 37 four-car EMUs manufactured by Hitachi Rail Italy at Reggio Calabria. Because of production problems caused by the COVID-19 pandemic, some were sent to Hitachi Newton Aycliffe in England for final fitting out.[13]
See also
editReferences
edit- ^ "Milan: from Monday extended hours on the M4 metro line". Agenzia Nova. 14 February 2024. Retrieved 25 April 2024.
- ^ a b c "Apre la nuova metro di Milano: c'è la data per l'inaugurazione della M4, la linea blu". MilanoToday (in Italian). 21 October 2022. Retrieved 21 October 2022.
- ^ a b "M4, apre la nuova tratta San Babila-Linate: oggi si viaggia gratis. Tutto quello che c'è da sapere". Il Giorno (in Italian). 3 July 2023. Retrieved 4 July 2023.
- ^ "Linea 4". www.metropolitanamilanese.it. Metropolitana Milanese. Retrieved 22 July 2015.
- ^ a b "Metropolitana M4 approvata, realizzazione Linate – Lorenteggio al via". Cronaca Milano. 22 November 2010. Retrieved 26 September 2011.
- ^ "Milano M4". Metropolitana Milanese. Retrieved 28 December 2011.
- ^ "Tabacci: a rischio il secondo lotto della M4". Corriere della Sera Milano. Retrieved 26 September 2011.
- ^ "Metrò 4, aprono i cantieri". Corriere della Sera Milano. Retrieved 26 September 2011.
- ^ "L'apertura della linea M4 a Milano slitta per ritrovamenti archeologici (e covid)". MilanoToday (in Italian). Retrieved 21 May 2021.
- ^ a b "C'è una data per l'apertura di tutta la linea M4". MilanoToday (in Italian). Retrieved 25 September 2024.
- ^ a b "M4, lavori assegnati a Impregilo e Atm". Corriere della Sera Milano. Retrieved 26 September 2011.
- ^ "Tar: "Metrò 4, gare regolari". Via ai cantieri". Corriere della Sera. 21 January 2012. Retrieved 22 January 2012.
- ^ Milan Metro cars in Newton Aycliffe The Railway Magazine issue 1436 November 2020 page 9