The M8 Motorway is a 15.2-kilometre (9.4 mi) tolled dual carriageway motorway in Sydney that is designated the M8 route marker. It consists predominantly of tunnels and includes tunnel connections to the future Western Harbour Tunnel and the M6 Motorway.

M8 Motorway

Westbound view of the M8 tunnel
M8 Motorway (Sydney) is located in Sydney
Southwest end
Southwest end
Northeast end
Northeast end
Coordinates
General information
TypeMotorway
Length15.2 km (9.4 mi)[1]
OpenedJuly 2020 (Kingsgrove–St Peters)
January 2023 (St Peters–Leichhardt)
November 2023 (Leichhardt–Rozelle)
Route number(s) M8 (2020–present)
Major junctions
Southwest end South Western Motorway
Kingsgrove, Sydney
 
Northeast endIron Cove Link
Rozelle, Sydney
Highway system

As of November 2023, the M8 Motorway comprises only the WestConnex M8 tolled motorway which opened in multiple stages:

These sections were constructed as part of the WestConnex project, and WestConnex tolls are applied.

Future sections of the M8 are being constructed as the Western Harbour Tunnel, which will connect the M8 at Rozelle Interchange to the A8 at Neutral Bay.[3] Separate to WestConnex, it is expected to open in 2028.

Route

edit

From its western end at Kingsgrove, the route branches out of the M5 corridor and travels parallel to the M5 East. The route then curves to the north and runs parallel to Princes Highway. Tunnel connections to the future M6 Motorway towards Southern Sydney and Wollongong have already been built at where the route curves north.[4] Just north of the curve, there are exits to St Peters Interchange in St Peters, with further connections towards the Eastern Suburbs via Euston Road and Gardeners Road, and towards Sydney Airport via the proposed Sydney Gateway.[2] The section of the M8 between Kingsgrove and St Peter is marked at two lanes in each direction, with capacity for a third lane to be added if required.[5]

The route continues running parallel to Princes Highway past St Peters along the M4-M8 Link. crosses underneath the suburbs of Newtown and Leichhardt. At Leichhardt, the route branches from the tunnels that would continue towards the M4, and heads north towards Rozelle Interchange before terminating at exits to City West Link and Iron Cove Link at Rozelle. This is the northern terminus of the route until the Western Harbour Tunnel is completed in 2028.

St Peters Interchange

edit
 
St Peters Interchange under construction

St Peters Interchange is a road interchange of five roadways, namely:

The interchange was built on the site of the former Alexandria Landfill waste facility,[6] and opened to traffic with the first section of the M8 Motorway in July 2020. At the time of opening, bridges and tunnel entrances/exits to the future sections of M8 and the Sydney Gateway had already been completed. The final bridge of the St Peters Interchange was put in place in October 2019.[7]

Until 2023, the interchange was the northern terminus of the M8 Motorway. When new sections of the motorway opened in January 2023, the alignment of the new tunnels bypassed the St Peters Interchange, and its approaches became entry and exit ramps of the motorway.

History

edit

New M5 (First stage)

edit

In 2009, the government released the M5 Transport Corridor Feasibility Study, which investigated strategic options for improving the M5 Motorway corridor. The study identified a preliminary preferred option, being the M5 East Duplication, consisted of duplicating the M5 East and construction of a new connection from the M5 East at Arncliffe to Euston Road, Qantas Drive and Gardeners Road.[8] The strategic concept for the M5 East Duplication was placed on public exhibition between November 2009 and March 2010 for community and stakeholder feedback. Feedback received was used to further develop and refine the scheme. In 2012, the scheme become the King Georges Road Interchange Upgrade and New M5 projects, the second stage of WestConnex. The New M5 would consist of separate tunnels parallel to the M5 East tunnels.

The New M5 had the potential to impact the critically endangered Cooks River/Castlereagh Ironbark ecological community and the green and golden bell frog, which are listed under the Commonwealth Environmental Protection and Biodiversity Act 1999. Environmental approval[2] from the federal Minister for the Environment was granted on 11 July 2016 and construction commenced later that month.[9][10] The New M5 was estimated to have a project cost of A$4.335 billion in 2015.[11] On 3 June 2020, M8 was revealed as the new name and route designation for the New M5, and it opened on 5 July 2020.[3]

edit

The section of WestConnex between St Peters and Haberfield was constructed as the third stage of WestConnex and was known as M4–M5 Link. In September 2022, the New South Wales Government announced that the M4-M5 Link will be referred to as extensions of the M4 and M8 when the link opened in 2023.[12]

The main tunnels between the M4 and M8 opened on 20 January 2023, with the M4 and M8 route markers extended to meet at Leichhardt until the Rozelle Interchange opened,[13] which it did on 26 November 2023, and the M8 route marker was further extended to Rozelle.[14]

Route numbering

edit
 
M8 Motorway signage concept at Rozelle Interchange

The M8 Motorway was first named in Section 300-2 of the Road Rules 2014, as amended in 2019, to be the tunnels between Beverly Hills and St Peters, and St Peters and Rozelle Interchange.[15] The modification report for The Crescent overpass released in April 2020 showed an image of the proposed signage "M8 North Sydney", indicating that M8 is to continue from Rozelle Interchange towards North Sydney via the Western Harbour Tunnel.[16] The official announcement of the M8 route designation in June 2020 confirmed that M8 will further continue along the Beaches Link and connect with the A8 in the Northern Beaches.[3]

The next section of the M8 that opened, the M4-M8 Link, is the third stage of the Westconnex project and has a long history in similar forms. It was previously known as the "M4 South"[17] and follows much of the alignment of the Inner West Motorway which originally formed the northern end of the F6 Freeway in the 1948 Cumberland County Plan to build an inner-city bypass and link the airport and shipping terminals.

Toll

edit

Motorists are charged WestConnex distance-based tolls to use the twin tunnels. The toll charge consists of:

Tolls for heavy vehicles are triple of cars and motorcycles. Toll prices increase by 4% or the consumer price index (CPI) every year, whichever is greater, until 2040, after which CPI will apply.[18]

As the M5 East and M8 are tolled under WestConnex, a vehicle travelling on the M5 East (between King Georges Road and M8) and M8 together will only incur a single toll.[19]

Toll prices as of 1 January 2024[20]
Toll road Class A toll prices[a] Class B toll prices[a] Toll increase[22] Toll concessionaire Expiry of toll concession[23]
Flagfall Charge per km Toll cap


WestConnex
(M4, M5 East, M8)
$1.67 $0.6164 $11.78 3 x of Class A prices Annually on 1 January, by the greater of CPI or 4% until December 2040, then by CPI only Sydney Transport Partners
(9% Tawreed Investments 10.5% CPPIB, 10% Caisse de dépôt et placement du Québec (CDPQ), 20.5% Australian Super, 50% Transurban)
2060


  1. ^ a b Class A vehicles are typically cars and motorcycles; Class B vehicles are all other vehicles including trucks and heavy vehicles[21]

Exits and interchanges

edit
LGALocationkm[1]miDestinationsNotes
Canterbury-BankstownKingsgrove0.00.0  South Western Motorway (M5) – Liverpool, CampbelltownSouthern terminus of motorway and route M8
Tunnel western terminus
BaysideArncliffe6.13.8M6 Motorway – Kogarah, Miranda, SutherlandUnder construction, expected completion late 2025
Northbound entrance and southbound exit only
Cooks River6.54.0Cooks River tunnel
Inner WestSt Peters9.05.6WestConnex M8 northern terminus; M4–M8 Link southern terminus
Euston Road (north) – Alexandria, Waterloo, Randwick
Gardeners Road (east) – Mascot, Kingsford
Campbell Road – Enmore, Alexandria
St Peters Interchange
Leichhardt12.57.8  M4 Motorway (M4) – Strathfield, Parramatta, PenrithM4-M8 Link continues along M4 Motorway
Rozelle Interchange southern terminus
Lilyfield13.98.6Northern end of toll road
  City West Link (A44) – Sydney, Anzac BridgeSouthbound entrance and northbound exit only
Rozelle14.48.9 Western Harbour Tunnel (north)  – North Sydney, CammerayUnder construction, expected completion 2028
15.29.4Iron Cove Link, to   Victoria Road (A40) – Lane Cove, RydeNorthern terminus of motorway and route M8
Rozelle Interchange northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

edit

References

edit
  1. ^ a b "M8 Motorway" (Map). Google Maps. Retrieved 29 February 2024.
  2. ^ a b c "WestConnex M8". WestConnex. Retrieved 2 July 2020.
  3. ^ a b c "New driver animations – As work ramps up on New M5 Tunnels" (Press release). WestConnex. 3 June 2020. Retrieved 2 July 2020.
  4. ^ "F6 Extension Stage 1 – New M5 Motorway at Arncliffe to President Avenue at Kogarah" (PDF). Transport for NSW: Roads and Maritime. NSW Government. June 2018. Retrieved 10 June 2020.
  5. ^ "WestConnex M8". WestConnex. Retrieved 8 July 2020.
  6. ^ "Remediation and closure of Alexandria Landfill, St Peters" (PDF). WestConnex. 4 October 2016. Archived from the original (PDF) on 10 April 2018.
  7. ^ "Final Piece in Place on New M5 Bridges" (Press release). WestConnex. 4 October 2019. Retrieved 2 July 2020.
  8. ^ "WestConnex New M5 – Environmental Impact Statement – Chapter 4". WestConnex. November 2015. p. 4-5. Retrieved 21 October 2020.
  9. ^ Hunt, Greg (11 July 2016). "Federal Government approves Stage 2 of WestConnex motorway" (PDF) (Press release). Department of the Environment. Archived from the original (PDF) on 29 July 2016.
  10. ^ "Cooks River/Castlereagh Ironbark Forest of the Sydney Basin Bioregion". Department of the Environment and Energy. Archived from the original on 29 July 2016.
  11. ^ "M8". WestConnex. Archived from the original on 9 June 2020. Retrieved 9 June 2020.
  12. ^ "M4 and M8 link to open ahead of schedule". Minister for Infrastructure, Transport, Regional Development and Local Government. 19 January 2023.
  13. ^ "WestConnex nears completion with new 7.5km tunnel opening tomorrow under Sydney's inner west". ABC News. 19 January 2023. Retrieved 20 January 2023.
  14. ^ "Rozelle Interchange to open for Sydney drivers on Sunday morning". ABC News. 24 November 2023. Retrieved 24 November 2023.
  15. ^ "Road Rules 2014 Act as amended November 2019". Retrieved 6 July 2020.
  16. ^ "Modification: The Crescent overpass and active transport Design amendment report". Major Projects – Department of Planning, Industry and Environment. April 2020. p. 56. Retrieved 6 July 2020.
  17. ^ "WestConnex State Significant Infrastructure Application Report". November 2013.
  18. ^ "Tolling". WestConnex. Retrieved 2 July 2020.
  19. ^ "Sydney Motorways Toll Calculator". Transport for NSW. Retrieved 16 September 2021.
  20. ^ "Toll costs by road". NSW Government. 1 January 2024. Retrieved 9 January 2024.
  21. ^ "What is my vehicle class?". Linkt. Retrieved 5 November 2020.
  22. ^ "When and how do toll prices increase". Linkt. Retrieved 5 November 2020.
  23. ^ "Road tolling in New South Wales" (PDF). New South Wales Parliament. Portfolio Committee No.2 – Health and Community Services. October 2017. Retrieved 30 October 2020.
edit