File:CPRR Summit Tunnel Central Shaft.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

CPRR_Summit_Tunnel_Central_Shaft.jpg (699 × 508 pixels, file size: 351 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: The vertical central shaft of the CPRR "Summit Tunnel" (Tunnel #6) at Donner Summit which allowed drilling and excavation of the tunnel to be carried out on four faces at once during construction of the 1,659 foot tunnel over a period of 15 months in 1866-67. Original digital photograph taken by the uploader (Centpacrr) inside the Summit Tunnel in August, 2003.
Date 18 March 2013 (original upload date)
Source Transferred from en.wikipedia to Commons.
Author Centpacrr at English Wikipedia

Licensing

[edit]
Centpacrr at English Wikipedia, the copyright holder of this work, hereby publishes it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 3.0 Unported license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
You may select the license of your choice.

Original upload log

[edit]
The original description page was here. All following user names refer to en.wikipedia.
Date/Time Dimensions User Comment
2013-03-18 05:40 699×508× (359687 bytes) Centpacrr Minor tweaks.
2013-03-18 05:27 700×509× (369468 bytes) Centpacrr The vertical central shaft of the [[Central Pacific Railroad|CPRR]] "Summit Tunnel" (Tunnel #6) and [[Donner Summit]] which allowed drilling and excavation of the tunnel to be carried out on four faces at once during construction of the 1,659 foot tunn...

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:59, 13 March 2016Thumbnail for version as of 05:59, 13 March 2016699 × 508 (351 KB)OgreBot (talk | contribs)(BOT): Reverting to most recent version before archival
05:59, 13 March 2016Thumbnail for version as of 05:59, 13 March 2016700 × 509 (361 KB)OgreBot (talk | contribs)(BOT): Uploading old version of file from en.wikipedia; originally uploaded on 2013-03-18 05:27:29 by Centpacrr
03:18, 28 February 2016Thumbnail for version as of 03:18, 28 February 2016699 × 508 (351 KB)FastilyClone (talk | contribs)Transferred from enwp

The following page uses this file:

File usage on other wikis

The following other wikis use this file:

Metadata