Category:Pampanga Delta Bridge

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search
NO WIKIDATA ID FOUND!

Search for Pampanga Delta Bridge on Wikidata

Create new Wikidata item
Upload media

Pampanga Delta Bridge 566.628 million 270-meter concrete deck bridge is under the DPWH Bridges Construction Replacement Program (BCRP) 2 implemented by DPWH Unified Project Management Office - Bridges Management Cluster Project (UPMO-BMC) sources of fund FY 2019-FY 2021 GAA. (It is located spanning the Rio Grande de Pampanga Candelaria (Delta), Macabebe Pampanga River, connecting Barangay Balibago and Bebe Anac in Masantol, Pampanga- made of 5 spans of steel box girders supported by 4 piers and 2 abutments resting on bored piles of two -1.50-meter diameter at both abutments and six –1.80-meter diameter at piers using floating crane scheduled for completion by September 14, 2023 as it started on October 16, 2019; The project is being implemented by contractor Eddmari Construction & Trading in joint venture partnership with J.H. Pajara Construction Company. (Important Note: the detailed photography focuses on the marvels of engineering by panning from a) Candelaria (Delta), Macabebe, both sides and underneath center; b) surrounding the undersides of the Bridge per banca or passenger boat ride and c) terminus depot at Bebe Anac in Masantol, Pampanga. It is a priority project of Cong. Rimpy Bondoc and Cong. Dra. Ana York Bondoc & Governor Dennis Delta Pineda and VG Nanay Lilia Pineda).

Subcategories

This category has only the following subcategory.

Media in category "Pampanga Delta Bridge"

This category contains only the following file.