Category:Pampanga Delta Bridge
NO WIKIDATA ID FOUND! Search for Pampanga Delta Bridge on Wikidata | |
Upload media |
Pampanga Delta Bridge 566.628 million 270-meter concrete deck bridge is under the DPWH Bridges Construction Replacement Program (BCRP) 2 implemented by DPWH Unified Project Management Office - Bridges Management Cluster Project (UPMO-BMC) sources of fund FY 2019-FY 2021 GAA. (It is located spanning the Rio Grande de Pampanga Candelaria (Delta), Macabebe Pampanga River, connecting Barangay Balibago and Bebe Anac in Masantol, Pampanga- made of 5 spans of steel box girders supported by 4 piers and 2 abutments resting on bored piles of two -1.50-meter diameter at both abutments and six –1.80-meter diameter at piers using floating crane scheduled for completion by September 14, 2023 as it started on October 16, 2019; The project is being implemented by contractor Eddmari Construction & Trading in joint venture partnership with J.H. Pajara Construction Company. (Important Note: the detailed photography focuses on the marvels of engineering by panning from a) Candelaria (Delta), Macabebe, both sides and underneath center; b) surrounding the undersides of the Bridge per banca or passenger boat ride and c) terminus depot at Bebe Anac in Masantol, Pampanga. It is a priority project of Cong. Rimpy Bondoc and Cong. Dra. Ana York Bondoc & Governor Dennis Delta Pineda and VG Nanay Lilia Pineda).
Subcategories
This category has only the following subcategory.
Media in category "Pampanga Delta Bridge"
This category contains only the following file.
-
The Construction of Pampanga Delta Bridge & Approaches 20.jpg 5,184 × 3,888; 4.33 MB