Category:December 2015 in Massachusetts
English: Media made in Massachusetts during December 2015. Note this is not the date of the upload, nor the date a photo was scanned.
States of the United States: Alabama · Alaska · Arizona · Arkansas · California · Colorado · Connecticut · Florida · Georgia · Hawaii · Idaho · Illinois · Indiana · Iowa · Louisiana · Maine · Maryland · Massachusetts · Michigan · Minnesota · Montana · Nebraska · Nevada · New Hampshire · New Jersey · New Mexico · New York · North Carolina · Ohio · Oklahoma · Oregon · Pennsylvania · Rhode Island · South Carolina · South Dakota · Tennessee · Texas · Utah · Virginia · Washington · West Virginia · Wisconsin · Wyoming – Washington, D.C.
Guam · Puerto Rico
Guam · Puerto Rico
December 2014 | ← | December 2015 | → | December 2016 | |||||||||
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
← | 57 | 24 | 60 | 91 | 75 | 84 | 155 | 133 | 148 | 30 | 76 | 96 | → |
---|
Subcategories
This category has the following 2 subcategories, out of 2 total.
.
- December 2015 in Boston (2 F)
Media in category "December 2015 in Massachusetts"
The following 94 files are in this category, out of 94 total.
-
1996 boarding location at Riverside, December 2015.JPG 4,320 × 3,240; 4.17 MB
-
Boston, Massachusetts (50912687596).jpg 3,872 × 2,581; 7.82 MB
-
Arlington station Berkeley Street entrance, December 2015.JPG 4,320 × 3,240; 2.95 MB
-
Arlington station Berkeley street entrances, December 2015.JPG 4,320 × 3,240; 2.31 MB
-
Arlington station Berkeley Street exit, December 2015.jpg 3,229 × 2,424; 2.01 MB
-
Arlington station Berkeley Street lobby, December 2015.jpg 4,320 × 2,432; 1.69 MB
-
Arlington station former entrance from Boston Public Garden, December 2015.JPG 4,320 × 3,240; 3.4 MB
-
Arlington station inbound platform, December 2015.JPG 4,320 × 3,240; 2.27 MB
-
Beaconsfield shelter (1), December 2015.JPG 4,320 × 3,240; 4.01 MB
-
Beaconsfield shelter (2), December 2015.JPG 4,320 × 3,240; 3.09 MB
-
Beaconsfield station from Dean Road steps, December 2015.JPG 4,320 × 3,240; 5.15 MB
-
Berkley Dighton Bridge, December 2015 (23280977174).jpg 2,340 × 1,316; 392 KB
-
Birds Roosting Power Lines (Unsplash).jpg 3,840 × 2,673; 2.93 MB
-
Boston Donald Trump Protest Sign.jpg 640 × 1,136; 248 KB
-
Boston, Massachusetts (50912013723).jpg 3,744 × 2,671; 4.52 MB
-
Boston, Massachusetts (50912673886).jpg 3,873 × 2,582; 6.53 MB
-
Boston, Massachusetts (50912703866).jpg 3,872 × 2,581; 5.48 MB
-
Boston, Massachusetts (50912801777).jpg 3,872 × 2,581; 5.77 MB
-
Boston, Massachusetts (50912802922).jpg 2,554 × 3,914; 9.62 MB
-
Boston, Massachusetts (50912818917).jpg 2,581 × 3,872; 6.37 MB
-
Boston, United States (Unsplash pqDObvGXRgI).jpg 2,475 × 1,650; 804 KB
-
Box District station construction from Broadway, December 2015.JPG 4,320 × 3,240; 3.38 MB
-
Box District station construction, December 2015.JPG 4,320 × 3,240; 2.98 MB
-
Bradford Cox (2015).jpg 4,988 × 3,325; 3.38 MB
-
Braintree station busway from garage roof, December 2015.JPG 4,320 × 3,240; 2.57 MB
-
Braintree station commuter rail platform, December 2015.JPG 4,320 × 3,240; 2.57 MB
-
Braintree station entrance from busway, December 2015.JPG 4,320 × 3,240; 1.93 MB
-
Chipotle Mexican Grill in Cleveland Circle, December 2015.JPG 4,320 × 3,240; 2.87 MB
-
Closed platform and future second platform site at Ruggles station, December 2015.JPG 4,085 × 3,069; 2.3 MB
-
Downtown Chelsea station construction, December 2015.JPG 4,320 × 3,240; 3.21 MB
-
Eastern Avenue station construction, December 2015.JPG 4,320 × 3,240; 3.17 MB
-
Elevator on Red Line platform at Braintree station, December 2015.JPG 4,320 × 3,240; 2.47 MB
-
Eliam.jpg 2,084 × 1,154; 363 KB
-
Emergency exits from Arlington inbound platform, December 2015.JPG 4,320 × 3,240; 2.8 MB
-
EZRide bus at Kendall MIT, December 2015.JPG 4,142 × 3,107; 2.61 MB
-
Facing west at Newton Highlands station, December 2015.JPG 4,320 × 3,240; 3.32 MB
-
Former passageway on inbound platform at Hynes Convention Center, December 2015.JPG 4,320 × 3,240; 2.53 MB
-
Former site of 21 Water Street, December 2015.JPG 4,320 × 3,240; 2.93 MB
-
GLX ROW between Hampton Inn and ZINC, December 2015.JPG 4,320 × 3,240; 2.61 MB
-
Government Center interior construction, December 2015.JPG 4,320 × 3,240; 2.2 MB
-
Harvard Yard in autumn, Boston, Massachusetts, 2015.jpg 3,872 × 2,581; 8.89 MB
-
High above Quincy Market (23547848831).jpg 3,840 × 2,160; 1.78 MB
-
Hyde Street entrance to Newton Highlands station, December 2015.JPG 4,320 × 3,240; 3.75 MB
-
Inbound train at Chestnut Hill station, December 2015.JPG 4,320 × 3,240; 3.45 MB
-
International 86Hydro Tractor Adam B. Ford ABF 0508.jpg 6,016 × 4,000; 5.25 MB
-
Lechmere shuttle bus at North Station, December 2015.JPG 4,320 × 3,240; 3.56 MB
-
Lockett Pundt (2015).jpg 5,472 × 3,648; 8.39 MB
-
MBTA 01862 at Braintree station, December 2015.JPG 4,320 × 3,240; 2.29 MB
-
MBTA 1719 at Boston Landing construction site, December 2015.JPG 4,320 × 3,240; 3.17 MB
-
MBTA 2018 and Boston Landing shoo-fly track, December 2015.jpg 4,320 × 3,240; 3.96 MB
-
MBTA 3675 at Sutherland Road, December 2015.JPG 3,673 × 2,763; 2.53 MB
-
MBTA 3852 at Englewood Avenue, December 2015.JPG 3,889 × 2,923; 2.53 MB
-
MBTA 3869 at Dean Road, December 2015.JPG 4,320 × 3,240; 4.3 MB
-
MBTA route 236 bus in Braintree busway, December 2015.JPG 4,320 × 3,240; 3.3 MB
-
MBTA route 88 bus at Lechmere, December 2015.JPG 4,320 × 3,240; 2.39 MB
-
MBTA route CT2 bus at Kendall MIT, December 2015.JPG 3,705 × 2,789; 1.84 MB
-
Michelle-Kwan-Hillary-for-America December 7 fundraiser in boston.png 658 × 900; 232 KB
-
Mini-high platform at Newton Centre station, December 2015.JPG 3,628 × 2,516; 2.56 MB
-
Mystic Mall station construction, December 2015.JPG 4,320 × 3,240; 3.19 MB
-
Newton Highands station from the west, December 2015.jpg 3,000 × 1,942; 2.3 MB
-
Newton Highlands station from the north, December 2015.JPG 4,320 × 3,240; 3.73 MB
-
Newton Highlands station from Walnut Street, December 2015.JPG 4,320 × 3,240; 4.19 MB
-
Newton Highlands station, December 2015.JPG 4,124 × 2,548; 2.65 MB
-
North headhouse at North Station, December 2015.jpg 4,320 × 2,432; 2.04 MB
-
Old freight track in pedestrian walkway in Lechmere parking lot, December 2015.JPG 4,320 × 3,240; 4.71 MB
-
Old Massachusetts sign on inbound platform at Hynes Convention Center, December 2015.JPG 4,320 × 3,240; 2.56 MB
-
Old Massachusetts sign on outbound platform at Hynes Convention Center, December 2015.JPG 4,320 × 3,240; 3.15 MB
-
Orange Line platform at Ruggles station, December 2015.JPG 4,320 × 3,240; 2.64 MB
-
Outbound train at Newton Highlands station, December 2015.JPG 4,320 × 3,240; 3.21 MB
-
Outbound train near Cook Junction, December 2015.JPG 4,320 × 3,240; 3.55 MB
-
Pedestrian level crossing at Braintree station, December 2015.JPG 4,320 × 3,240; 3.3 MB
-
Quincy Adams station Independence Avenue entrance from gate (2), December 2015.JPG 4,320 × 3,240; 3.34 MB
-
Quincy Adams station Independence Avenue entrance from gate, December 2015.JPG 4,320 × 3,240; 3.55 MB
-
Quincy Adams station Independence Avenue entrance from outside, December 2015.JPG 4,320 × 3,240; 3.72 MB
-
Red Bridge viaduct construction, December 2015.JPG 4,320 × 3,240; 3.4 MB
-
Red Bridge viaduct supports under construction, December 2015.JPG 4,320 × 3,240; 3.23 MB
-
Red Line train in Caddigan Yard, December 2015.jpg 3,895 × 2,280; 1.92 MB
-
Red-white-1.jpg 4,746 × 3,164; 8.43 MB
-
Riverside carhouse from station, December 2015.JPG 4,320 × 3,240; 2.89 MB
-
Riverside platform panorama, December 2015.jpg 4,096 × 2,232; 1.63 MB
-
Shelter at Chestnut Hill station, December 2015.JPG 4,320 × 3,240; 3.87 MB
-
Shelter at Newton Centre station, December 2015.JPG 4,162 × 3,126; 2.92 MB
-
Shelter at Newton Highlands station, December 2015.JPG 4,320 × 3,240; 3.51 MB
-
Silver Line Gateway construction and Eastern Route from Broadway, December 2015.JPG 4,320 × 3,240; 2.87 MB
-
Silver Line Gateway construction north from Bellingham Street, December 2015.JPG 4,320 × 3,240; 3.59 MB
-
Silver Line Gateway construction south from Bellingham Street, December 2015.JPG 4,320 × 3,240; 3.42 MB
-
Silver Line Gateway construction west from Broadway, December 2015.JPG 4,320 × 3,240; 3.77 MB
-
Station Street entrance to Newton Highlands station, December 2015.JPG 4,320 × 3,240; 4.76 MB
-
Station Street exit from Newton Highlands station, December 2015.JPG 4,320 × 3,240; 4.07 MB
-
SWIFT interlocking work, December 2015.JPG 4,320 × 3,240; 4.09 MB
-
Umass retired banners.jpg 2,448 × 1,984; 1.09 MB
-
Walnut Street entrance to Newton Highlands station, December 2015.JPG 4,320 × 3,240; 4.48 MB
-
Wellesley Shuttle on Mass Pike in Allston, December 2015.JPG 2,804 × 2,109; 1.42 MB