Usuari:Amadalvarez/sandbox Bridge
Aparença
Example of position block
Example of complex dimensions presentations
from 2 different items
from 2 different items
Presa de les Tres Gorges (Q12514) | ||||
---|---|---|---|---|
Native label | (zh) 三峽大壩 (zh-hans) 三峡大坝 | |||
Named after | Three Gorges | |||
Data | ||||
Type | Gravity dam, boat lift and hydroelectric power station | |||
Part of | Cascade of hydropower stations on Yangtze River | |||
Construction | 2003 | |||
Date of official opening | 2003 | |||
Has use | hydroelectricity, flood control and inland navigation | |||
Quality | ||||
Height | dam: 181 m | |||
Width | dam crest: 40 m level of foundation: 115 m | |||
Length | dam: 2,335 m | |||
Discharge | 116,000 m³/s (spillway) | |||
Elevation above sea level | dam crest: 185 m level of foundation: 4 m | |||
Reservoir | ||||
Name | Three Gorges Reservoir Region | |||
Elevation above sea level | 175 m | |||
Vertical depth | 113 m | |||
Length | 600 km | |||
Width | 1.1 km | |||
Area | 1,045 km² | |||
Tributary | Yangtze | |||
Outflows | Yangtze | |||
Drainage basin | Yangtze River basin (1,000,000 km² ) | |||
Volume as quantity | 39,300 hm³ | |||
Geographic location | ||||
Administrative territorial entity | Sandouping Town, People's Republic of China | |||
Physical location | Yangtze | |||
Located in or next to body of water | Yangtze | |||
| ||||
Activity | ||||
Utilization | 2003 – | |||
Owned by | China Yangtze Power | |||
Operator | China Yangtze Power | |||
Hydraulic head | 80.6 m | |||
Nominal power output | 22,500 MW | |||
Annual energy output | 103.65 TW h (2021) | |||
Francis turbine | 14 (x 700 MW) (Utilization:September 2005-) | |||
Francis turbine | 12 (x 700 MW) (Utilization:July 2009-) | |||
Francis turbine | 6 (x 700 MW) (Utilization:July 2009-) | |||
Example of sportive summary block
- ↑ Reference URL: https://www.rogerfederer.com/index.php/profile. Retrieved: February 23, 2020.