Mechanical Equipment Technologies Inc.

Mechanical Equipment Technologies Inc.

Facilities Services

Toronto, Ontario 233 followers

BORP™ - Building Operations Resource Platform

About us

(1) BORP - Building Operations Resource Platform - Method of creating improved processes and workflow efficiencies through integrating document and cloud based technologies into Extended Reality (XR) formats. Applied to all aspects of construction/facilities management, manufacturing, or any technical practice that requires cross-functional team collaboration. Services • 3D site capture • Integrating IT, OT, IoT and media with XR environments • Open source software application development • Server migration, configuration and hosting • Automation strategy • IoT strategy • System training content - media Facilities & Retrofit Partner (MEP Systems) • Leveraging 3D content for enhanced asset management • Continuous documenting, continuous training, continuous commissioning practices • Evaluation of system age, condition and configuration • Benchmarking MEP system design efficiency • Technology research, integration, delivery • Develop service, technology and training strategies • Increase systems based knowledge within organizations • Reduce carbon footprint

Website
http://www.metdigitized.ca
Industry
Facilities Services
Company size
2-10 employees
Headquarters
Toronto, Ontario
Type
Privately Held
Founded
2012

Locations

Employees at Mechanical Equipment Technologies Inc.

Updates

  • If 50% of electrical power on our planet is consumed by squirrel cage motors, bearing maintenance is critical to not only building energy models, but transportation and industry.

    View profile for Scott Williams, graphic

    Senior Technical Advisor - Integrated Building Technology at MET

    Bearing life! Bearings are the most critical electric motor component, and are the number one reason electric motors fail. Electric motors are machines, and like any machine are application specific. This is a really great blog by Aegis that talks about what happens inside an induction motor during a variable frequency drive application (VFD). My side note: - grease bearings with care - too little, over heating, scoring, vibration. - too much, break the seals Bearing grease acts as an insulation to shaft voltage arcing between the ball bearings and the raceway of the bearing assembly....preventative maintenance. (Please youtube electric motor bearings) Electric motor bearings are application specific - time, load, temperature dependent which dictates how frequently bearing grease needs to be added. Add a VFD, review ground shafting and/or bearing insulation. Electric motor, verify with the motor manufacturer and get it in writing as the specific application requires. Adding a VFD to a fan or pump application, complete a technical review of wiring, motors and controls. #borp #equipmentdesign #systemknowledge #designpower #projectscope #mepcoordination #ownerdriven #projectdriven #teamwork

    How Do VFDs Cause Bearing Damage?

    How Do VFDs Cause Bearing Damage?

    blog.est-aegis.com

  • Building automation and VFD’s, It’s a mechanical conversation….#BORP #equipmentdesign #systemknowledge https://lnkd.in/g9rb3H98

    View profile for Scott Williams, graphic

    Senior Technical Advisor - Integrated Building Technology at MET

    Sensorless pump control vs. differential pressure transmitter, which configuration uses less power (wattage) over the entire load profile? For this discussion, they are equal. It comes down to having a conversation with the mechanical designer, mechanical installer, TAB contractor, controls contractor, pump/vfd rep, and commissioning agent. Design Head = Design Flow on design day (max). Control Head = Design Flow delivered to the equipment furthest from the pump when the rest of the system is satisfied (min). In both examples, the testing and balancing contractor will provide the 25-ft control head (min) value to either the controls contractor or the sensorless pump factory technician. Step one: know the mechanical design Step two: build a commissioning and warranty plan at the proposal stage Now we’re ready to evaluate the two proposals sitting on our desk, and control the conversation around project scope, scheduling, service life. ….cost becomes a function of understanding step one and two. #borp #equipmentdesign #systemknowledge #designpower #projectscope #mepcoordination #ownerdriven #projectdriven #teamwork

    How to Determine Control Head for a Variable Speed Pumping System —

    How to Determine Control Head for a Variable Speed Pumping System —

    jmpcoblog.com

Similar pages

Browse jobs