About us

At Gateway Energy, we’re innovating to empower a better future. Proudly Australian-owned, we’ve been serving the transmission needs of contractors and utility owners across Australia and the South Pacific since 2011. As a key designer and supplier of powerline and substation structures to the Australian power transmission industry, we’ve proudly become a supplier of choice. We’re known for our commitment to quality, design leadership and best-for-project approach that delivers better results for our clients, including: ⇾ Downer ⇾ UGL ⇾ Elecnor ⇾ Consolidated Power Projects ⇾ AusNet Services ⇾ Transgrid ⇾ ElecraNet ⇾ Powerlink ⇾ Yur!ka ⇾ Acciona ⇾ Enerven ⇾ Iberdrola ⇾ Tilt Renewables ⇾ Squadron Energy Driven by curiosity and a warrior spirit, we’re always asking ‘what if?’. This set us apart as leaders in innovative structure solutions setting new benchmarks in what makes for great engineering design. Looking for a partner with extensive field-level experience and a board-level understanding of project needs? Get in touch and let’s explore how we can work together for your next project. Call us on 1800 674 317 or visit our website.

Website
http://gatewayenergy.com.au
Industry
Utilities
Company size
2-10 employees
Headquarters
Indooroopilly, Queensland
Type
Privately Held
Founded
2011
Specialties
Transmission Line Poles, Transmission Line Towers, Transmission Line Gantries, and Substation Structures

Locations

  • Primary

    80 Stamford Rd

    Suite 3C, Lantos Place

    Indooroopilly, Queensland 4068, AU

    Get directions

Employees at Gateway Energy Pty Ltd

Updates

  • A proud moment for our senior project engineer Maggie Yu, seeing her hard work installed on the Ryan's Corner Wind Farm, south of the Grampians and west of Warrnambool in Victoria. As a proud female engineer in the power infrastructure industry, Maggie played an instrumental role in the project, coordinating the design process, production, and delivery of the powerline structures for this project. The Ryan’s Corner Wind farm connects 218MW of renewables generation to the AusNet grid. Well done, Maggie!! #WomenInEngineering

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      1
  • View organization page for Gateway Energy Pty Ltd, graphic

    442 followers

    ️⚡️ Goyder Augmentation 🤝 Client: Enerven  📍 Location: Goyder, S.A. Altering existing lines to enable new lines to pass underneath was no mean feat. But through working with our client to understand their specific needs, objectives and challenges, we were able to design to meet their requirements and conducted our usual practice, including Finite Element Analysis (FEA). We took a highly complex installation and executed it well and to the client’s satisfaction. Got a challenging project coming up? Reach out to Dean or Anthony to talk about how we can collaborate for better outcomes.

  • View organization page for Gateway Energy Pty Ltd, graphic

    442 followers

    Great client UGL, great project! Thanks for choosing Gateway Energy Pty Ltd, all the team appreciate the opportunity to be involved. ElectraNet Pty Ltd

    View organization page for Gateway Energy Pty Ltd, graphic

    442 followers

    ️⚡️ Prominent Hill SP4 and SP2 🤝 Client: UGL  📍 Location: Prominent Hill, S.A. With over 500 poles required across SP4 and SP2, we worked closely with our client and suppliers to ensure design requirements for both 132kV and 275kV were understood, and a smooth logistics process to remote locations. By using FEA as we always do, we were able to save the client time and money by avoiding full scale load testing. By understanding the bigger picture, we’re proudly able to deliver best-for-project solutions.

  • View organization page for Gateway Energy Pty Ltd, graphic

    442 followers

    ️⚡️ Prominent Hill SP4 and SP2 🤝 Client: UGL  📍 Location: Prominent Hill, S.A. With over 500 poles required across SP4 and SP2, we worked closely with our client and suppliers to ensure design requirements for both 132kV and 275kV were understood, and a smooth logistics process to remote locations. By using FEA as we always do, we were able to save the client time and money by avoiding full scale load testing. By understanding the bigger picture, we’re proudly able to deliver best-for-project solutions.

  • View organization page for Gateway Energy Pty Ltd, graphic

    442 followers

    Innovation drives progress in the infrastructure sector. At Gateway Energy, we're not only committed to staying ahead of industry trends to meet our clients’ needs - we’re leading the way. Innovation permeates everything we do: our designs, quality control processes, delivery, and onsite logistics. Curious about how our innovation can benefit your next project? Get in touch directly with Dean Garrett or Anthony Swincer.

  • View organization page for Gateway Energy Pty Ltd, graphic

    442 followers

    Tackling project delays head-on is crucial for infrastructure success. At Gateway Energy, we start at the very beginning of every project by understanding what’s most important to our clients and prioritising the most efficient path to market to ensure the timely completion of projects. Learn how our solutions can streamline your projects. Contact Dean or Anthony directly today.

  • View organization page for Gateway Energy Pty Ltd, graphic

    442 followers

    It’s been a busy but rewarding couple of weeks on our latest project. The crew are heading out on RnR with now what looks like a powerline in their rearview mirror. The known hard rock ground conditions onsite constantly tried to slow us down. However, a hundred or so teeth replacements and auger repairs later, we were able to drill, stand & prep the first stringing section ready for when we return. For those of you playing at home that’s 54 poles, 23 stays set and 12km of draw wire (2km line route) installed in a 17 day swing, by a small crew who are proactive in taking charge of “their” project. They address any risks & hazards that arise to keep themselves, subbies & others on this live mine site safe, and still sit down together at the end of the day around the table of knowledge to debrief. #CowellElectric

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      1

Similar pages

Browse jobs