You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
If I want to make any changes to the existing landing page and make the change available only after a certain date and time, the current page gets hidden until the start date is reached. Ideally, the current version of the page should be available till the scheduled start time of the new changes.
If I want to revert any changes I made in the landing page, to an older version, there is no way to do it currently.
Solutions available in other platforms: Having multiple revisions of the content pages, and capability to make any revision active manually or based on a schedule.
Do we have any plans or design in mind to adopt similar features in Grand node?
The text was updated successfully, but these errors were encountered:
Use cases:
Solutions available in other platforms: Having multiple revisions of the content pages, and capability to make any revision active manually or based on a schedule.
Do we have any plans or design in mind to adopt similar features in Grand node?
The text was updated successfully, but these errors were encountered: