Illinois Administrative Code (Last Updated: March 27, 2024) |
TITLE62. MINING |
PART1817. PERMANENT PROGRAM PERFORMANCE STANDARDS – UNDERGROUND MINING OPERATIONS |
§ 1817.11. Signs and Markers |
§ 1817.13. Casing and Sealing of Exposed Underground Openings: General Requirements |
§ 1817.14. Casing and Sealing of Underground Openings: Temporary |
§ 1817.15. Casing and Sealing of Underground Openings: Permanent |
§ 1817.21. Topsoil General Requirements [Repealed] |
§ 1817.22. Topsoil and Subsoil |
§ 1817.23. Topsoil: Storage [Repealed] |
§ 1817.24. Topsoil: Redistribution [Repealed] |
§ 1817.25. Topsoil: Nutrients and Soil Amendments [Repealed] |
§ 1817.41. Hydrologic Balance Protection |
§ 1817.42. Hydrologic Balance: Water Quality Standards and Effluent Limitations |
§ 1817.43. Diversions |
§ 1817.44. Hydrologic Balance: Stream Channel Diversions [Repealed] |
§ 1817.45. Hydrologic Balance: Sediment Control Measures |
§ 1817.46. Hydrologic Balance: Siltation Structures |
§ 1817.47. Hydrologic Balance: Discharge Structures |
§ 1817.48. Hydrologic Balance: Acid - forming and Toxic - forming Materials [Repealed] |
§ 1817.49. Impoundments |
§ 1817.50. Hydrologic Balance: Underground Mine Entry and Access Discharges [Repealed] |
§ 1817.52. Hydrologic Balance: Surface and Ground Water Monitoring [Repealed] |
§ 1817.53. Hydrologic Balance: Transfer of Wells [Repealed] |
§ 1817.55. Hydrologic Balance: Discharge of Water Into an Underground |
§ 1817.56. Post – Mining Rehabilitation of Sedimentation Ponds, Diversions, Impoundments and Treatment Facilities |
§ 1817.57. Hydrologic Balance: Stream Buffer Zones |
§ 1817.59. Coal Recovery |
§ 1817.61. Use of Explosives: General Requirements |
§ 1817.62. Use of Explosives: Pre-Blasting Survey |
§ 1817.64. Use of Explosives: General Performance Standards |
§ 1817.65. Use of Explosives: Surface Blasting Requirements [Repealed] |
§ 1817.66. Use of Explosives: Blasting Signs, Warnings, and Access Control |
§ 1817.67. Use of Explosives: Control of Adverse Effects |
§ 1817.68. Use of Explosives: Records of Blasting Operations |
§ 1817.71. Disposal of Excess Spoil: General Requirements |
§ 1817.72. Disposal of Excess Spoil: Valley Fills/Head-of-Hollow Fills |
§ 1817.73. Disposal of Underground Development Waste and Excess Spoil: Head-of-Hollow Fills [Repealed] |
§ 1817.74. Disposal of Excess Spoil: Durable Rock Fills |
§ 1817.75. Disposal of Excess Spoil: Preexisting Benches |
§ 1817.81. Coal Mine Waste: General Requirements |
§ 1817.82. Coal Processing Waste Banks: Site Inspection [Repealed] |
§ 1817.83. Coal Mine Waste: Refuse Piles |
§ 1817.84. Coal Mine Waste: Impounding Structures |
§ 1817.85. Coal Processing Waste Banks: Construction Requirements [Repealed] |
§ 1817.86. Coal Processing Waste: Burning [Repealed] |
§ 1817.87. Coal Mine Waste: Burning and Burned Waste Utilization |
§ 1817.88. Coal Processing Waste: Return to Underground Workings [Repealed] |
§ 1817.89. Disposal of Noncoal Mine Wastes |
§ 1817.91. Coal Processing Waste: Dams and Embankments: General Requirements [Repealed] |
§ 1817.92. Coal Processing Waste: Dams and Embankments: Site Preparation [Repealed] |
§ 1817.93. Coal Processing Waste: Dams and Embankments: Design and Construction [Repealed] |
§ 1817.94. Coal Processing Waste: Time Requirement for Completion of Covering [Repealed] |
§ 1817.95. Stabilization of Surface Areas |
§ 1817.97. Protection of Fish, Wildlife and Related Environmental Values |
§ 1817.99. Slides and Other Damage |
§ 1817.100. Contemporaneous Reclamation and Subsidence Control |
§ 1817.101. Backfilling and Grading: General Requirements |
§ 1817.102. Backfilling and Grading: General Grading Requirements |
§ 1817.103. Backfilling and Grading: Covering Coal and Acid- and Toxic - Forming Materials [Repealed] |
§ 1817.106. Backfilling and Grading: Previously Mined Areas |
§ 1817.107. Backfilling and Grading: Steep Slopes |
§ 1817.111. Revegetation: General Requirements |
§ 1817.112. Revegetation: Use of Introduced Species [Repealed] |
§ 1817.113. Revegetation: Timing |
§ 1817.114. Revegetation: Mulching and Other Soil Stabilizing Practices |
§ 1817.115. Revegetation: Grazing [Repealed] |
§ 1817.116. Revegetation: Standards for Success |
§ 1817.117. Revegetation: Tree, Shrub, and Herbaceous Vegetation |
§ 1817.121. Subsidence Control |
§ 1817.122. Subsidence Control: Public Notice |
§ 1817.124. Subsidence Control: Surface Owner Protections [Repealed] |
§ 1817.126. Subsidence Control: Buffer Zones [Repealed] |
§ 1817.131. Cessation of Operations: Temporary |
§ 1817.132. Cessation of Operations: Permanent |
§ 1817.133. Post-Mining Land Capability |
§ 1817.150. Roads: General |
§ 1817.151. Primary roads |
§ 1817.180. Utility Installations |
§ 1817.181. Support Facilities |
§ 1817.182. Minor Underground Mine Facilities Not at or Adjacent to the Processing or Preparation Facility or Area |
§ 1817.190. Affected Acreage Map |
SOURCE: Adopted at 4 Ill. Reg. 37, p. 1, effective June 1, 1982; amended at 6 Ill. Reg. 1, effective June 1, 1982; amended at 6 Ill. Reg. 15024, effective December 30, 1982; codified at 8 Ill. Reg. 8230; amended at 9 Ill. Reg. 13315, effective October 10, 1985; amended at 10 Ill. Reg. 9606, effective July 1, 1986; amended at 11 Ill. Reg. 8250, effective July 1, 1987; amended at 14 Ill. Reg. 11855, effective January 1, 1991; amended at 15 Ill. Reg. 17239, effective January 1, 1992; amended at 17 Ill. Reg. 11031, effective July 1, 1993; amended at 20 Ill. Reg. 1993, effective January 19, 1996; amended at 22 Ill. Reg. 20197, effective November 5, 1998; amended at 24 Ill. Reg. 5938, effective March 21, 2000; amended at 26 Ill. Reg. 4252, effective March 6, 2002; amended at 29 Ill. Reg. 9829, effective June 27, 2005; amended at 47 Ill. Reg. 2390, effective February 3, 2023.
|
Notation
AUTHORITY: Implementing and authorized by the Surface Coal Mining Land Conservation and Reclamation Act [225 ILCS 720].