Rangpo railway station

Coordinates: 27°10′34″N 88°31′43″E / 27.1761°N 88.5287°E / 27.1761; 88.5287
From Wikipedia, the free encyclopedia

Rangpo Railway Station
Indian Railways Station
General information
LocationNational Highway 10, Khanikhola, Majitar, Rangpo, Pakyong District, Sikkim
India
Coordinates27°10′34″N 88°31′43″E / 27.1761°N 88.5287°E / 27.1761; 88.5287
Elevation357 metres (1,171 ft)
Owned byIndian Railways
Operated byNortheast Frontier Railway
Line(s)Sivok–Rangpo line
Platforms3
Tracks4
Construction
Structure typeStandard (on-ground station)
ParkingYes ( after completion)
Bicycle facilitiesNo
Other information
StatusConstruction – new line
Station codeRNGPO
Zone(s) Northeast Frontier Railway
Division(s) Alipurduar
History
OpenedDecember 2024 (expected)[1]
ElectrifiedNo
Location
Rangpo Railway Station is located in Sikkim
Rangpo Railway Station
Rangpo Railway Station
Location in Sikkim
Rangpo Railway Station is located in India
Rangpo Railway Station
Rangpo Railway Station
Location in India

Rangpo railway station is an under-construction railway station lying on Sevoke-Rangpo Railway Line in Pakyong District of Sikkim. Its code is RNGPO. It will serve Rangpo city, and three districts of Sikkim, which are Pakyong District, Gangtok District and Mangan District. It is 38 km (24 mi) from the state capital of Gangtok and 21 km (13 mi) from Pakyong Airport. The station will consist of three platforms and four lines after completion.[2] It is expected to be completed by December 2024.[3][4]

Trains

[edit]

Under-construction extension

[edit]

Sivok–Rangpo line, 44 km-long line, will provide access to Gangtok in Sikkim.[8] The foundation stone for construction of a new railway line from Sevoke railway station to proposed Rangpo railway station on the border of Sikkim and West Bengal was laid in October 2009 by the vice president of India.[9] In 2008, the line was proposed to be 53 km long with 1,676 mm (5 ft 6 in) broad gauge track but the final alignment is 45 km long with 3.5 km in Sikkim state and the rest in West Bengal.[citation needed]

The track will have 28 bridges and 14 tunnels and 38.5 km of the track will be in tunnels.[10][11] Bridges over deep gorges and valleys will provide a scenic journey.[citation needed] The track is due to be constructed through the foothills of the Kanchanjungha mountain range and the Teesta river valley. New railway stations will be constructed at Melli, Teesta Bazaar, Geil Khola, Riang, and Rangpo.[needs update][speculation?]

The Indian Railways signed a contract with the construction company, IRCON, only in May 2010 but the final alignment had not been fixed for the first 22 km through elephant sanctuary forest even in 2013 and the final clearance of environment ministry had not been received.[12] To obtain approval of the environment and forest ministry, the railways made a proposal in February 2013 to install elephant sensors along the stretch of the proposed railway line in Mahananda elephant sanctuary or run the trains at a speed of only 20 km per hour in the forest area and stop when an elephant is sighted close to the track.[13] People of two villages in East Sikkim, through which a 3.5 km stretch of the 45 km long railway line has been planned, had not agreed to give their land for laying the track.[14] The project cost has escalated from the estimated cost of Rs.13.4 billion in 2008.[15]

The Supreme Court of India approved the project in February 2016 with strict guidelines of the National Wildlife Board that cleared the project in June 2015 but ordered restricted speed, wireless animal tracking sensors and allowed digging of tunnels only during daytime. The railway line is needed for security and socio-economic reasons. The railway line will help troops and armaments move faster towards the Indo-Tibet border. Railway Board chairman visited and met the Northeast Frontier Railway (NFR) officials on 2 March 2018 to discuss the commencement of construction of the track and tunnels.[16] The railway line up to Rangpo is expected to be completed in 2021.[17] In the second phase, the line will be extended up to Gangtok.[18] As of November 2021, 30% of construction work is completed, and now, the deadline for completion is set to December 2023.[19]

  • Estimated cost: ₹ 1,340 crore in 2008 (₹ 5,000 crore in 2021)
  • Length of final alignment: 44.98 km
  • Stations en route: Riang, Gailkhola, Tista Bazaar, Melli
  • Nearest junction: New Jalpaiguri (30 km from Sevoke through Siliguri)
  • Route under tunnels: 38.53 km (86%)
  • Number of bridges: 28
  • Number of tunnels: 14
  • Longest tunnel: 5.1 km

References

[edit]
  1. ^ "Sikkim: Bengal-Sikkim rail project picks up pace after PM push | India News - Times of India". The Times of India.
  2. ^ "RNGPO/Rangpo". India Rail Info.
  3. ^ Dipak K. Dash (29 November 2021). "sikkim: Bengal-Sikkim rail project picks up pace after PM push | India News - Times of India". The Times of India. Retrieved 1 December 2021.
  4. ^ PTI (21 November 2021). "Bengal-Sikkim rail link to be operational by Dec 2023: NFR". The Hindu. ISSN 0971-751X. Retrieved 1 December 2021.
  5. ^ "Vande Bharat train will run in Sikkim's Rangpo by next year". news9live.com.
  6. ^ "Vande Bharat: सिक्किम के रंगपो में चलेगी वंदे भारत, जानिए रेल मंत्री ने कब से ट्रेन चलाने का दावा किया". abplive.com.
  7. ^ "Sikkim Vande Bharat: Modi Government Likely To Start Services By THIS Month, Deets Inside". india.com.
  8. ^ North East to get better Indian Railways connectivity! 5 major rail projects lined up, Financial Express, 17 July 2020.
  9. ^ "Update". www.constructionupdate.com. Retrieved 9 February 2021.
  10. ^ The Hindu BusinessLine (25 January 2010). "Inspection survey for Sikkim rail link". @businessline. Retrieved 9 February 2021. {{cite web}}: |author= has generic name (help)
  11. ^ "The Hindu Business Line : Inspection survey for Sikkim rail link". Archived from the original on 31 January 2010. Retrieved 20 July 2012.
  12. ^ "North Bengal-Sikkim Railway Link". Railway Technology. 25 June 2020. Retrieved 9 February 2021.
  13. ^ Balchand, K. (7 February 2013). "Elephant sensors may come up on railway line to Sikkim". The Hindu. Retrieved 9 February 2021.
  14. ^ Villagers’ nod to rail survey, The Telegraph, 28 August 2012
  15. ^ "Other projects" (PDF). www.indianrailways.gov.in. Retrieved 9 February 2021.
  16. ^ Chanda, Aishik (21 February 2018). "Coming Soon: West Bengal - Sikkim Rail project". www.newindianexpress.com. Retrieved 9 February 2021.
  17. ^ Financial Express.Indian Railways new Sivok-Rangpo rail project: Travel from West Bengal to Sikkim in just 2 hours. (30 August 2019).
  18. ^ "Very soon, travelling to Sikkim by train will be a possibility". Times of India Travel. 17 September 2019. Retrieved 9 February 2021.
  19. ^ "Sikkim expected to get rail connectivity by 2023: official". Hindustan Times. 15 November 2021. Retrieved 1 December 2021.