Jump to content

List of proposed railway electrification routes in Great Britain

From Wikipedia, the free encyclopedia

2012 Department for Transport plans for UK rail electrification by 2019 including Northern Hub (red), Electric Spine (yellow/green), Great Western Main Line and South Wales Main Line (red) and Valleys & Cardiff Local Routes (blue). For 'HLOS', see Network Rail > Control periods.

This article lists proposed railway electrification routes in Great Britain.

Background

[edit]

Railway electrification in the UK has been a stop-start or boom-bust cycle since electrification began. The initial boom was under the 1955 modernisation plan. There was a flurry of activity in the 1980s and early 1990s but this came to a halt in the run up to privatisation and then continued in the 2000s, and also the Great Recession intervened. In 2009 Lord Adonis was appointed Secretary of State for Transport and, after a gap of more than a decade, electrification of the UK rail network was back on the agenda with Adonis announcing plans to electrify the Great Western Main Line from London as far as Swansea, as well as infill electrification schemes in the North West of England. The 2010 general election produced a coalition government that wanted to reassess spending, and so electrification was paused again.

In July 2012 the UK government announced £4.2 billion of new electrification schemes, all at 25 kV AC and reconfirmed schemes previously announced by Adonis. These were to be Northern Hub, Great Western Main Line, South Wales Main Line, Midland Main Line, Electric Spine, Crossrail, Gospel Oak to Barking line and West Midlands suburban lines including the Cross-City Line. The Trans-Pennine route from Manchester to York and Selby via Leeds was also announced. Rail transport in Scotland is a devolved matter for the Scottish Government, but they too have pursued electrification with multiple schemes in the Central Belt. All these have been 25 kV AC, as in England and Wales.

Delays and cancellations of projects

[edit]

On 25 June 2015 the government announced that some of the electrification projects would be delayed or cut back because of rising costs. Electrification work was to be "paused" on the Trans-Pennine route between York and Manchester and on the Midland main line between Bedford and Sheffield. Electrification of the Great Western main line would go ahead but the status of the Reading-Newbury and Didcot-Oxford sections was unclear. However, in September 2015, the electrification work was "un-paused", but with a delayed completion date. Since then there have been updates including one published in October 2016.

On 20 July 2017 Chris Grayling the Secretary of State for Transport cancelled a number of electrification projects citing disruptive works and use of bi-mode technology as an alternative.

Electrification has had much controversy with cancellations and various appearances of the Secretary of State for Transport called before the Transport Select Committee. The Transport Select Committee published its report into various matters including regional investment disparity on the railways and calling again for the reinstatement of various cancelled electrification schemes. A written question was submitted and answered in parliament regarding route miles electrified in the years 1997–2019.

In March 2019 the Railway Industry Association published a paper on Electrification cost challenge suggesting ways forward and a rolling programme of electrification.

In September 2020 the TDNS (Traction Decarbonisation Network Strategy) Interim Business case was published though it was dated 31 July 2020. The principal recommendation was further electrification of 13000 STKs - single track kilometres of UK railways. As of November 2020, there are very few confirmed schemes. As of October 2022, the TDNS has been quietly abandoned.[1]

List of routes

[edit]

Northern Hub

[edit]

As part of the Northern Hub project, the following lines in North West England and Yorkshire were to have been electrified: In December 2013 it was announced that the branch from Bolton to Wigan North Western would be electrified by 2017.[2] However, the enhancements delivery plan update of September 2016 moved the completion date with only GRIP Stage 3 (Option selection) being completed by then.[3] On 1 September 2021, the Department for Transport formally announced this would now go ahead.[4][5]

  • Harrogate line Harrogate to Leeds electrification was proposed, but not yet agreed.[6]

Transpennine

[edit]

Windermere branch line

[edit]
  • Windermere Branch Line: In August 2013, the Department for Transport announced that the branch line between Oxenholme and Windermere was to be electrified by 2016.[11] The Hendy review moved the completion of GRIP 3 to March 2017 with a yet to be determined date for completion of electrification. In July 2017 Chris Grayling the Secretary of State for Transport announced the scheme had been cancelled and bi-mode technology would be used.[12]

Great Western Main Line and South Wales Main Line

[edit]
  • The electrification of the GWML to Thingley Junction (near Chippenham) and the SWML via Bristol Parkway to Cardiff Central was due for completion in December 2018,[13][14] but was delayed to December 2019, with electric trains only beginning to run to Cardiff from January 2020.[15] Electrification from Reading to Newbury was completed in December 2018.[16][14] On 8 November 2016, Transport Minister Paul Maynard announced that several parts of the Great Western electrification project were being deferred 'until further notice': these include the line between Didcot and Oxford,[14][13] the lines to Bristol Temple Meads (both via Bristol Parkway and Bath), the line between Cardiff and Swansea,[17][13][14] and the Henley and Marlow branch lines. On 20 July 2017, it was announced that the Cardiff-Swansea electrification project had been cancelled and that bi-mode trains would be used on the route.[18]
  • As a spin-off, it was proposed that the Valleys & Cardiff Local Routes would be electrified once the main route is complete.[19]

Midland Main Line

[edit]
Near Felmerham
Bridges over the Midland Main Line in Bedfordshire have been replaced to allow greater clearances for electrification and larger rolling stock. Before (top) and after (bottom) the 2014 upgrade.
  • The line has already been electrified to Bedford since the early 1980s. This was to be extended to Corby, Leicester, Nottingham, Derby and Sheffield. In November 2016 only the electrification to Kettering and Corby was confirmed as continuing with the DfT refusing to be drawn on dates for the remaining parts of the original scheme.[20] On 20 July 2017, it was announced that the Kettering-Nottingham-Sheffield electrification project had been cancelled and that bi-mode trains would be used on the route.[21] However, in March 2019, it was announced by Department for Transport that the line between Kettering and Market Harborough would be electrified. This would allow easier connection to the new proposed grid feeder at Braybrooke.[22] The Integrated Rail Plan for the North and Midlands (IRP) published November 2021 said electrification of the entire route would now go ahead.[23]

North Wales Main Line

[edit]

Electrification of the North Wales Main Line from Crewe to Holyhead via Chester was announced by the Prime Minister Rishi Sunak in 2023. The project would be allocated £1 billion of funds following from the partial cancellation of High Speed 2.[24]

Electric Spine

[edit]

2020 onwards

[edit]

Under Transport Secretary Chris Grayling many of the proposed electrification projects were cancelled, despite pledging to remove full diesel trains by 2040.[25] However, after being sacked in 2019,[26] and replaced by Grant Shapps many of the cancelled electrification schemes are being reconsidered. The Integrated Rail Plan for the North and Midlands (IRP) confirmed this.

Manchester Victoria to Stalybridge

[edit]

The electrification of this part of the Transpennine Route Upgrade is underway and due for completion in 2025.[27]

Bolton to Wigan

[edit]

It was announced in December 2013 that Bolton to Wigan North Western would be electrified by 2017.[2] Finally, on 1 September 2021, the go ahead was formally announced.[28] Starting in December 2021, Wigan to Bolton work is in progress with "boots on the ground".[29] The planned switch on of the electricity is January 1 2025.[30]

York to Church Fenton

[edit]

Work to extend the wires from Colton Junction to Church Fenton began in December 2020. Preliminary work includes track and signalling to enable line speed improvements prior to the installation of overhead gantries and wires in 2022 ready for an October 2022 completion.[31] The extension will allow bi-mode trains to use electric traction through this section.[32] The overhead lines on this section is scheduled to be operational from early 2024 along with a speed limit increase from 90 mph to 125 mph.[33] As of April 2023, there has been no announcement on electrification between Leeds and Church Fenton.

Stalybridge to Leeds

[edit]

The section between Huddersfield to Dewsbury had the TWAO applied for on 31 March 2021.[34]

Leeds to Selby, Hull and Sheffield

[edit]

Now the electrification scheme could be back on the agenda after transport secretary Grant Shapps confirmed plans to spend nearly £600m on work to upgrade and electrify the TransPennine main line.[35]

Leeds to Bradford Interchange via New Pudsey

[edit]

As part of the Integrated Rail Plan for the North and Midlands the line between Leeds and Bradford Interchange via New Pudsey is being electrified.[36]

Scotland Rolling programme

[edit]

On 28 July 2020, Scottish Transport Secretary Michael Matheson announced plans to phase out fossil fuel use on the railway network by 2035.[37] The plan would see most lines electrified, but suggests that intermittent electrification in difficult places may be implemented. Alternative traction will be implemented rather than electrification for some lightly used lines. These are the Far North Line, Kyle of Lochalsh Line, West Highland Line, and the southern portion of the Stranraer Line.[38] Other Scottish political parties including the Green Party support a rolling programme and indeed want it to be accelerated.[39] Transport Scotland has also published a list prioritising the projects and divided them into the categories of 1) in delivery, 2) in development, 3) under active consideration.[40]

In early 2021 a start was made on the electrification scheme to Barrhead and East Kilbride.[41]

In June 2022 work commenced on the partial electrification of the Fife Circle Line.[42] This will involve extending the existing Edinburgh area electrification to Dalmeny, and an isolated area of electrification between Kirkcaldy, Lochgelly and Ladybank. This will allow the Fife Circle services to be operated by battery electric multiple units whilst minimising capital expenditure on infrastructure, in particular avoiding the major expense of electrifying the Forth Bridge. Complete electrification would be possible at some future date. The partial electrification is due to be completed in December 2025.[43]

Other infill schemes

[edit]

Acton Mainline to Acton Wells junction is being electrified with a start made in 2024. The line is sometimes called the Poplars Link.[44] Planned completion is July 2026.[45]

Traction Decarbonisation Network Strategy

[edit]

In September 2020 the TDNS (Traction Decarbonisation Network Strategy) Interim Business case was published though it was dated 31 July 2020. The principal recommendation was further electrification of 13000 STKs - single track kilometres of UK railways.[46]

Network Rail 2020 Suggested electrification for low carbon transport

List of routes now complete in 2010 onwards timeframe

[edit]

Northern Hub

[edit]

As part of the Northern Hub project, the following lines in North West England and Yorkshire have been electrified:

  • Liverpool to Manchester Northern Route: Manchester to Newton-le-Willows completed December 2013; to Liverpool, planned by December 2014 but completed in February 2015.
  • Liverpool to Wigan: planned by December 2014 but completed in March 2015.
  • Manchester to Preston (via Bolton) by December 2017 and Preston to Blackpool North by May 2018. An October 2017 update pushed back the completion of the Manchester - Preston section. This scheme provides an electrified route from Blackpool to the West Coast Main Line at Preston and then on to Manchester diverging from the West Coast Main Line at Euxton Jct. Originally, Preston - Blackpool was to be done before Manchester - Preston, but Network Rail said Preston - Blackpool needed to have new signalling and the opportunity was also taken to completely remodel Blackpool North and Kirkham & Wesham stations and other remodelling improvements at Salwick and Poulton-le-Fylde. The scheme was to have followed with a new completion date of March 2018. Further delays ensued and a powered electric train (a Virgin Pendolino) finally carried out multiple test runs overnight on 14–15 May 2018, a few days after energisation. Similarly, in the early hours of 13 December 2018, a Virgin Pendolino ran test runs between Preston and Manchester Piccadilly shortly after energisation. The full electric service from Manchester to Blackpool North started in February 2019

Gospel Oak to Barking Line

[edit]
  • Electrification of this line, which is part of London Overground, was announced in July 2013.[47] Major civil engineering with line closures started July 2016. Full in-service date was expected to be 30 June 2017.[3] However, design errors and the late delivery of materials and structures meant that the project was delayed. The start of electric services was to be in May 2018.[48][49]
  • Delays in the electrification of the line were followed by delays in the delivery of the Class 710 electric train sets.[50] The first two trains entered service on 23 May 2019, with the full fleet entering service in August 2019.[51][52] These 4-car train sets doubled the length of the trains and passenger capacity compared to the former 2-car Diesel train sets, completing the project.[53]

West Midlands suburban lines

[edit]

Extensions to the existing West Midlands suburban electrification:

Scotland

[edit]

This electrification scheme and associated works has come to mean Edinburgh-Glasgow via Falkirk High and was due to be completed by December 2016. The rolling programme would then follow with the route via Shotts. The scheme via Carstairs in association with the ECML electrification was completed in the early 1990s. With other infills in the central belt of Scotland there are now (2020) 4 different electrified routes between the two cities with assorted diversionary routes.[61] The December 2016 date was not met and in May 2017 a further delay to the wires going live was announced due to a safety-critical component possibly for the whole route needing to be replaced.[62] It was actually completed in December 2017.[63] The infills included the route from Cumbernauld and Falkirk Grahamston to Larbert, Alloa, Dunblane and Stirling.

See also

[edit]

References

[edit]
  1. ^ Ford, Roger (November 2022). "TDNS terminated - official". Modern Railways. No. 890. pp. 26–31.
  2. ^ a b "New boost for railway electrification schemes". RailNews. Archived from the original on 26 March 2014. Retrieved 27 March 2014.
  3. ^ a b c "Archived copy" (PDF). Archived from the original (PDF) on 13 October 2016. Retrieved 8 January 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  4. ^ "Green light given for Wigan to Bolton electrification". GOV.UK. Retrieved 1 September 2021.
  5. ^ "Green light given for Wigan to Bolton electrification". miragenews.com. 1 September 2021. Retrieved 1 September 2021.
  6. ^ "Harrogate Informer – Transport Secretary refuses to commit to electrification of Harrogate to Leeds line, but at least the trains will be cleaned". Harrogate Informer. 4 February 2020. Archived from the original on 12 April 2020. Retrieved 22 May 2020.
  7. ^ "Network Rail Enhancements Delivery Plan England and Wales" (PDF). September 2023.
  8. ^ "First Hull Trains welcomes £2.4m Government pledge to electrify train lines from Hull to Selby". First Hull Trains. Archived from the original on 7 April 2014. Retrieved 4 April 2014.
  9. ^ "Anger as ministers shelve Yorkshire rail electrification plans - Yorkshire Post". Archived from the original on 2 December 2016. Retrieved 2 December 2016.
  10. ^ "Hull-Selby rail electrification project rejected". BBC News. 16 November 2016. Archived from the original on 3 February 2021. Retrieved 21 June 2018.
  11. ^ "DfT Unveils Lakes Electrification Plans" Archived 27 June 2015 at the Wayback Machine Railnews news article 09-08-2013; Retrieved 2014-03-13
  12. ^ "Rail electrification plans scrapped by government - BBC News". BBC News. 20 July 2017. Archived from the original on 1 April 2019. Retrieved 21 June 2018.
  13. ^ a b c "Great Western electrification: Intercity line work 'deferred'". BBC News. 8 November 2016. Archived from the original on 27 January 2018. Retrieved 13 November 2016.
  14. ^ a b c d "Rail modernisation". Financial Times. London. 8 November 2016. Archived from the original on 13 November 2016. Retrieved 13 November 2016.
  15. ^ "Cardiff electric services go live | News | Railway Gazette International". Archived from the original on 11 January 2020. Retrieved 31 January 2020.
  16. ^ "Great Western electric operation extends west". International Railway Journal. 31 December 2018. Archived from the original on 13 September 2020. Retrieved 17 May 2020.
  17. ^ Rail electrification delayed but passengers told there will be new trains with more seats Archived 11 November 2016 at the Wayback Machine  – Oxford Times, 8 November 2016
  18. ^ "Sheffield, Swansea and Windermere electrification cancelled | News | Railway Gazette International". Archived from the original on 3 February 2021. Retrieved 20 July 2017.
  19. ^ "Rail electrification to Swansea and south Wales valleys welcomed". BBC News. 16 July 2012. Archived from the original on 4 February 2013. Retrieved 23 March 2014.
  20. ^ "Business Today: Chamber for Monday 7 November 2016". publications.parliament.uk. Archived from the original on 3 February 2021. Retrieved 19 November 2020.
  21. ^ "Sheffield, Swansea and Windermere electrification cancelled". Railway Gazette International. 20 July 2017. Archived from the original on 28 November 2020. Retrieved 19 November 2020.
  22. ^ "Electrification to reach Market Harborough". Railway Gazette International. 5 March 2019. Archived from the original on 1 October 2020. Retrieved 19 November 2020.
  23. ^ Department for Transport (18 November 2021). Integrated Rail Plan for the North and Midlands (PDF). Department for Transport. ISBN 978-1-5286-2947-8. {{cite book}}: |website= ignored (help)
  24. ^ "Why £1bn isn't enough for North Wales Main Line electrification". Rail Magazine. 16 January 2024. Retrieved 26 February 2024.
  25. ^ "Government to phase out diesel trains by 2040". edie.net. Archived from the original on 7 August 2020. Retrieved 27 September 2020.
  26. ^ "Chris Grayling to return to backbenches after being sacked as Transport Secretary". yorkshirepost.co.uk. 24 July 2019. Archived from the original on 3 February 2021. Retrieved 27 September 2020.
  27. ^ "Manchester to Stalybridge". Transpennine route upgrade. Network Rail. Archived from the original on 1 February 2021. Retrieved 17 May 2021.
  28. ^ "Green light given for Wigan to Bolton electrification". GOV.UK. Archived from the original on 24 December 2021. Retrieved 1 September 2021.
  29. ^ ""Absolutely horrendous" rail works keep residents up all night". The Bolton News. 25 January 2022. Retrieved 25 January 2022.
  30. ^ "New £100m Bolton to Wigan rail electrification set to 'go live' on New Years Day". The Bolton News. 7 December 2024. Retrieved 10 December 2024.
  31. ^ "York to Church Fenton Improvement Scheme" (PDF). Network Rail. Archived (PDF) from the original on 3 February 2021. Retrieved 16 November 2020.
  32. ^ "York to Church Fenton Improvement Scheme". Network Rail. Archived from the original on 29 November 2020. Retrieved 16 November 2020.
  33. ^ "E1 Electrification".
  34. ^ "Huddersfield to Westtown (Dewsbury)". Network Rail. Archived from the original on 1 February 2021. Retrieved 2 April 2021.
  35. ^ "Ambition Trans-Pennine electrification". keymodernrailways.com. 24 July 2020. Archived from the original on 26 November 2020. Retrieved 19 November 2020.
  36. ^ "Integrated Rail Plan for the North and Midlands" (PDF). UK Government. 18 November 2021. p. 15.
  37. ^ Rail Services Decarbonisation Action Plan : Transport Scotland. Scotland. Scottish Government, Scotland. Transport Scotland. Glasgow. 2020. ISBN 978-1-911582-92-2. OCLC 1238497205.{{cite book}}: CS1 maint: location missing publisher (link) CS1 maint: others (link)
  38. ^ "Ambitious plans to transform Scottish rail network unveiled - gov.scot". gov.scot. Archived from the original on 29 July 2020. Retrieved 29 July 2020.
  39. ^ "Rail for All Scottish Green Party" (PDF). Archived (PDF) from the original on 12 January 2021.
  40. ^ "Prioritisation of rail projects". transport.gov.scot. Archived from the original on 16 March 2021. Retrieved 16 March 2021.
  41. ^ "East Kilbride Enhancements". Scotlands Railway. Archived from the original on 26 June 2021. Retrieved 15 March 2021.
  42. ^ "Piling work to get underway to electrify line to Fife". Network Rail. Retrieved 3 June 2022.
  43. ^ "Fife Electrification". Scotland's Railway. Retrieved 3 June 2022.
  44. ^ "Enhancements Delivery Plan England and Wales Entry Into Service (EIS) schedule June 2024" (PDF). Network Rail. June 2024. p. 16.
  45. ^ "Enhancements delivery plan England and Wales -(Entry into Service)" (PDF). Network Rail. September 2024.
  46. ^ "Network Rail TDNS Interim Business Case" (PDF). Archived (PDF) from the original on 8 February 2021. Retrieved 19 November 2020.
  47. ^ "Disbelief after six-year Barking to Gospel Oak Overground campaign comes to successful end, but questions still to answer". This Is Local London. 30 June 2013. Archived from the original on 27 March 2014. Retrieved 27 March 2014.
  48. ^ "UK railway news round-up". Railway Gazette. Retrieved 26 July 2017.
  49. ^ "Gospel Oak to Barking electrification". Network Rail. Archived from the original on 20 July 2017. Retrieved 26 July 2017.
  50. ^ "London Overground Class 710 unveiled". railmagazine.com. Archived from the original on 18 July 2018. Retrieved 13 May 2020.
  51. ^ "TfL 'pushing hard' to get new trains for Barking line | Railnews | Today's news for Tomorrow's railway". railnews.co.uk. Archived from the original on 17 February 2020. Retrieved 11 June 2019.
  52. ^ "Gospel Oak to Barking trains". Transport for London. Archived from the original on 29 November 2019. Retrieved 11 June 2019.
  53. ^ "Improving London Overground". Transport for London. Archived from the original on 3 February 2021. Retrieved 13 May 2020.
  54. ^ "Bromsgrove Rail Station and Interchange". CENTRO. Archived from the original on 7 April 2014. Retrieved 6 April 2014.
  55. ^ Darlington, Paul (17 January 2017). "Bromsgrove Corridor resignalling". Rail Engineer. Archived from the original on 29 August 2017. Retrieved 26 July 2017.
  56. ^ "Up to three extra trains per hour for Bromsgrove | West Midlands Railway". westmidlandsrailway.co.uk. Archived from the original on 30 July 2018. Retrieved 17 May 2020.
  57. ^ "Work is underway to electrify the Chase Line". Network Rail. Archived from the original on 12 November 2014. Retrieved 6 April 2014.
  58. ^ "Stories - Network Rail". Archived from the original on 3 February 2021. Retrieved 26 June 2017.
  59. ^ "Stories - Network Rail". Archived from the original on 3 February 2021. Retrieved 29 June 2017.
  60. ^ Hurst, Ben (10 May 2019). "More carriages promised on line after electric upgrade". birminghammail. Archived from the original on 10 May 2019. Retrieved 17 May 2020.
  61. ^ "Electrification programme | Transport Scotland". Archived from the original on 15 August 2016. Retrieved 14 August 2016.
  62. ^ "Edinburgh-Glasgow rail electrification delayed again - the Scotsman". Archived from the original on 21 May 2017. Retrieved 18 May 2017.
  63. ^ "First electric trains to run on Edinburgh-Glasgow main line on Sunday". The Scotsman. Archived from the original on 11 December 2017. Retrieved 31 January 2018.

Further reading

[edit]
  • Keenor, Garry. Overhead Line Electrification for Railways 6th edition.
  • "Network Rail A Guide to Overhead Electrification Revision 10" (PDF). Network Rail. February 2015.
  • "On board with electrification". Permanent Way Institution Journal. 139 (1). January 2021. ISSN 2057-2425 – via PWI.
  • Boocock, Colin (1991). East Coast Electrification. Ian Allan. ISBN 0-7110-1979-7.
  • Nock, O.S. (1965). Britain's new railway: Electrification of the London-Midland main lines from Euston to Birmingham, Stoke-on-Trent, Crewe, Liverpool and Manchester. London: Ian Allan. OCLC 59003738.
  • Nock, O.S. (1974). Electric Euston to Glasgow. Ian Allan. ISBN 0-7110-0530-3.
  • Proceedings of the British Railways Electrification Conference, London 1960 - Railway Electrification at Industrial Frequency. London: British Railways Board. 1960.