Lieberose Photovoltaic Park
Appearance
Lieberose Photovoltaic Park | |
---|---|
Country | Germany |
Coordinates | 51°55′55″N 14°24′26″E / 51.93194°N 14.40722°E |
Status | Operational |
Construction cost | US$238 million |
Owner | Juwi Group |
Solar farm | |
Type | Flat-panel PV |
Power generation | |
Units operational | 900,000 |
Nameplate capacity | 70.8 MW |
The Lieberose Photovoltaic Park is a 70.8-megawatt (MW) photovoltaic power plant in Lieberose, Brandenburg, Germany.[1] The solar park with 900,000 solar panels which went fully on line in October 2009, and will supply electricity for 15,000 households a year while reducing the use of pollution-generating fossil fuels. The Lieberose Solar Park cost $238-million and is operated by the Juwi Group, which has a 20-year contract on the land.[2]
See also
[edit]References
[edit]- ^ Lieberose Solar Park
- ^ Henry Chu. Germany shows government role is key to thriving solar industry Los Angeles Times, December 12, 2009.