Tsing Yi North Bridge

(Redirected from Tsing Tsuen Bridge)

Tsing Yi North Bridge (Chinese: 青衣北橋), also called Tsing Tsuen Bridge (青荃橋), connects the Tam Kon Shan Interchange on Tsing Yi Island to the Tsuen Tsing Interchange in Tsuen Wan, spanning the Rambler Channel. Inaugurated on 10 December 1987, the bridge was designed to improve access to Tsing Yi, which at that time was connected to Kwai Chung by only one fixed link, the heavily congested Tsing Yi Bridge.

Tsing Yi North Bridge

青衣北橋
View of Tsing Yi North Bridge from south
Coordinates22°21′36″N 114°6′37″E / 22.36000°N 114.11028°E / 22.36000; 114.11028
CarriesMotor vehicles, pedestrians
CrossesRambler Channel
LocaleKwai Tsing District
Hong Kong
OwnerHong Kong Government
Maintained byHighways Department
Characteristics
Total length1,015 metres[1]
Longest span160 metres[2]
Piers in water2
History
DesignerScott Wilson Kirkpatrick and Partners
Constructed byMaeda/Oriental Joint Venture
Construction start24 September 1984; 40 years ago (1984-09-24)[1]
Construction costHK$200 million[3]
Opened11 December 1987; 37 years ago (1987-12-11)[4]
Inaugurated10 December 1987; 37 years ago (1987-12-10)[3]
Statistics
Daily traffic41,680 (2016)[5]
Location
Map

History

edit

The Tsing Yi North Bridge was intended to alleviate congestion on Tsing Yi's sole existing bridge to the south. It was designed by Scott Wilson Kirkpatrick and Partners and constructed by the Maeda/Oriental Joint Venture.[6] Construction began on 24 September 1984.[1]

An opening ceremony for the Tsing Yi North Bridge, built at a cost of HK$200 million, was held by Governor David Wilson on 10 December 1987.[3] It opened to traffic on 11 December 1987, at which time it was the longest bridge in Hong Kong.[4]

The ferry service between Tsing Yi and Tsuen Wan was terminated by Hongkong and Yaumati Ferry several years after the opening of the North Bridge.

Structure

edit

Tsing Yi North Bridge was, when opened in 1987, Hong Kong's largest prestressed balanced cantilever bridge with a main navigation span of 160 metres, side spans of 90 metres, and approach viaducts that brought the total length to 1,015 metres.[2] The design can support a 2-way and 4-lane traffic. The balustrade on the bridge was an aluminium-type to prevent rusting, although it was changed to welded stainless steel, because of the frequent stolen cases of aluminium bars in the past decades.

Extension

edit

On 1 February 2002, the day of the opening of Tsing Yi North Coastal Road, the North Bridge was connected and became the main path from Tsuen Wan to Tung Chung on Lantau Island and the International Airport in Chek Lap Kok.

References

edit
  1. ^ a b c McKenna, B.R.; Palmer, G. (June 1989). "Tsing Yi North Bridge: construction". Proceedings of the Institution of Civil Engineers. 86 (3): 491–511.
  2. ^ a b Denton-Cox, R.A.; Weir, K.L. (June 1989). "Tsing Yi North Bridge: planning and design". Proceedings of the Institution of Civil Engineers. 86 (3): 471–489.
  3. ^ a b c Wong, Brian (11 December 1987). "Government to look again at Tsing Yi plans". South China Morning Post. p. 6.
  4. ^ a b "New Tsing Yi bridge fails to divert traffic". South China Morning Post. 17 December 1987. p. 2.
  5. ^ "The Annual Traffic Census 2016" (PDF). Transport Department. August 2017.