Talk:SBB Ae 4/8

Latest comment: 8 days ago by RMCD bot in topic Move discussion in progress

Article mainly adapted

edit
  • Some links not yet OK -> might come with future articels or will be corrected due to errors soon
  • Could't manage the pic from the German site -> maybe somebody can help
  • Please improve my English Lord Koxinga (talk) 19:19, 4 May 2010 (UTC)Reply

Cleanup

edit

I've tried to improve the English language and phrasing of this article, hope it is OK. There are two technical points where I have checked with the original German article and have hopefully used the correct translations:

  • electrical brake "wechselstromerregte Widerstandsbremse" -> "AC excited resistor brake", taking the standard meaning of "wechselstrom" to mean AC.
  • "Stufenschalter-Überschläge" to mean an electrical flashover (one possible meaning of "Überschläge") at the step switch - nothing to do with track points (switches) as may have appeared from the original.

The phrase "Shortly thereafter the Ae 4/8 disappeared from the rosters", although an accurate translation, doesn't seem to fit in with the narrative so I have removed it. Threefoursixninefour (talk) 08:00, 14 June 2014 (UTC)Reply

Move discussion in progress

edit

There is a move discussion in progress on Talk:SBB-CFF-FFS RAe TEE II which affects this page. Please participate on that page and not in this talk page section. Thank you. —RMCD bot 15:36, 12 December 2024 (UTC)Reply