Connecticut Turnpike

(Redirected from Connecticut Route 695)

The Connecticut Turnpike (officially the Governor John Davis Lodge Turnpike) is a freeway and former toll road in the U.S. state of Connecticut; it is maintained by the Connecticut Department of Transportation (ConnDOT). Spanning approximately 128 miles (206 km) along a generally west–east axis, its roadbed is shared with Interstate 95 (I-95) for 88 miles (142 km) from the New York state border in Greenwich to East Lyme; I-395 for 36 miles (58 km) from East Lyme to Plainfield; and SR 695 for four miles (6.4 km) from Plainfield to the Rhode Island state line at U.S. Route 6 (US 6) in Killingly. The turnpike briefly runs concurrently with US 1 from Old Saybrook to Old Lyme and Route 2A from Montville to Norwich.

Gov. John Davis Lodge Turnpike
Connecticut Turnpike
Map
Connecticut Turnpike highlighted in green
Route information
Maintained by ConnDOT
Length128.47 mi[1] (206.75 km)
ExistedJanuary 2, 1958 (January 2, 1958)[2][3]–present
Component
highways
Major junctions
South end I-95 at the New York state line
Major intersections
North end US 6 in Killingly
Location
CountryUnited States
StateConnecticut
CountiesFairfield, New Haven, Middlesex, New London, Windham
Highway system
  • Connecticut State Highway System

Construction on the Connecticut Turnpike began in 1954 and the highway was opened in 1958. It originally followed a sequential exit numbering system that disregarded route transition, where the exit numbers on I-395 were a continuation of the exit numbers on I-95. In 2015, the I-395 exit numbers were changed to a mileage-based system reflecting their distance from the split from I-95, effectively removing the defining element of the turnpike. In some sections southwest of New Haven, it carries an annual average daily traffic of over 150,000 vehicles.[4]

Route description

edit
 
Northbound exit 48 offramp from the I-95 section, before the reconstruction of the I-95/I-91 interchange

I-95

edit

I-95 enters Connecticut as the Connecticut Turnpike in Greenwich at the New York state line. The turnpike stretches for 128.5 miles (206.8 km) across the state, but only the first 88 miles (142 km) is signed as I-95. This portion of the highway passes through the most heavily urbanized section of Connecticut along the shoreline between Greenwich and New Haven, going through the cities of Stamford, Norwalk, Bridgeport, and New Haven, with daily traffic volumes of 120,000 to over 150,000 throughout the entire 48-mile (77 km) length between the New York border and the junction with I-91 in New Haven.[4] The turnpike intersects with several major expressways, namely US 7 at exit 15 in Norwalk, Route 8 at exit 27A in Bridgeport, the Merritt and Wilbur Cross parkways at exit 38 (via the Milford Parkway) in Milford, and I-91 at exit 48 in New Haven.

North (east) of I-91, the turnpike continues along the Connecticut shoreline, usually with less traffic. The six-lane highway is reduced to four lanes in Branford, interchanges with Route 9 at exit 69 in Old Saybrook, crosses the Connecticut River on the Raymond E. Baldwin Bridge and continues until the interchange with I-395 at exit 76 near the East Lyme–Waterford line.

I-395

edit

The turnpike leaves I-95 at exit 76 in East Lyme, continuing on as I-395 north heading towards Norwich, Jewett City and Plainfield until exit 35, where the turnpike and I-395 split. I-395 continues north towards Worcester, Massachusetts, ending at I-290 and the Massachusetts Turnpike. The Connecticut Turnpike officially ends at US 6 (Danielson Pike) in Killingly, which continues on towards Providence, Rhode Island. Unlike the I-95 portion, the I-395 portion of the turnpike has changed very little over the years, retaining its grass median with a guardrail separating directions of travel.

US 1

edit

The Connecticut Turnpike incorporated a pre-existing relocation of US 1 between Old Saybrook and Old Lyme, which included the original Raymond E. Baldwin Bridge over the Connecticut River, which opened in 1948. Upon the turnpike's opening in 1958, US 1 has been co-signed with the turnpike between exit 68 in Old Saybrook and exit 70 in Old Lyme.

Route 2A

edit

Route 2A was constructed to serve as a bypass around Norwich. It shares its alignment with the Connecticut Turnpike from its northern terminus at Route 2 to exit 9 on I-395, where it turns east and serves the Mohegan Sun Casino before crossing the Thames River and ending at Route 2 south of Norwich.

SR 695

edit

SR 695 is the 4.49-mile (7.23 km) unsigned portion of the turnpike from I-395 in Plainfield to US 6 at the Rhode Island state line in Killingly. The road is not signed as SR 695 but eastbound as "To US 6 East" and westbound as "To I-395 South". SR 695 would have become part of the now-defunct alignment of the I-84 freeway between Hartford, Connecticut, and Providence, Rhode Island, had that freeway been built. (Present-day I-84 continues eastbound from Hartford into Massachusetts where it ends at I-90, the Massachusetts Turnpike). There are two partial exits on SR 695. Westbound exit 1 (formerly exit 90) at Squaw Rock Road is only accessible westbound. The easternmost exit (also numbered exit 1, but formerly unnumbered), located 1,500 feet (460 m) east of the Squaw Rock Road onramp and accessible only eastbound, is for Ross Road, and the only onramp provided from Ross Road is for SR 695 westbound. The interchange with I-395 is only partial: there is no access provided from SR 695 westbound to I-395 northbound and no access from I-395 southbound to SR 695 eastbound.

History

edit

The general route and construction of the turnpike were both mandated by state law.[5] Intended to relieve congestion on US 1 and Route 15 (the Merritt and Wilbur Cross parkways), design work began in 1954. The Connecticut Turnpike opened to traffic on January 2, 1958, at 2:30 p.m.[2][3] However, the westernmost portion of the highway (the three miles [4.8 km] connecting Greenwich with the New England Thruway) opened 10 months later. Tolls were originally collected through a series of eight toll booths along the route.

The Connecticut Turnpike was designed and built much differently than other toll roads built around the same time. Unlike toll roads in other states that operated under semi-autonomous, quasi-public toll road authorities, the Connecticut Turnpike was operated by the Connecticut Highway Department (later the Connecticut Department of Transportation) from its inception. Additionally, unlike toll roads in other states where revenues collected from motorists were legally required to be kept within the toll road authority and used to finance the facility's construction and upkeep, toll revenues from the Connecticut Turnpike were placed into the state's general fund and used for highway and non-highway expenditures alike. Finally, the closely spaced interchanges and eight mainline barriers were a result of each town through which the Connecticut Turnpike passed being guaranteed a certain number of access points to gain the support of each affected town for construction of the highway. This is in contrast to toll roads built in neighboring states with widely spaced interchanges that normally featured a ticket system where one obtained a ticket at entering the toll road, then paid a distance-based fare upon exiting.

The turnpike was renamed after former Connecticut Governor John Davis Lodge on December 31, 1985, two months after the tolls were removed. Local legend is the initial phase of turnpike construction in 1954 was so disruptive in heavily Republican Fairfield County that local voters there turned on incumbent Republican Governor Lodge, leading to his defeat by Abraham Ribicoff.[6]

Initially, the Connecticut Turnpike was signed as an east–west route, even after the I-95 designation was added to the turnpike between Greenwich and Waterford in the early 1960s. Signs indicating I-95/Connecticut Turnpike as an east–west route existed in places until the early 1990s, when the remaining east–west signage was replaced by north–south signage.[citation needed]

From Waterford to Killingly, the turnpike was initially designated as Route 52 in 1967, following the opening of the toll-free section of Route 52 from Killingly to the Massachusetts border. To accommodate the truncation of the Hartford to Providence extension of I-84 to Killingly, following Rhode Island's cancellation of its portion of that extension in the early 1980s, Route 52 was to be re-designated as an Interstate. Initially, Connecticut and Massachusetts requested that the American Association of State Highway and Transportation Officials (AASHTO) extend the I-290 designation southward along free Route 52 and the Connecticut Turnpike to I-95 in Waterford. AASHTO rejected the I-290 request and instead approved the I-395 designation in 1983.[7]

Accidents

edit

Several notorious accidents have occurred throughout the turnpike's history. The worst of these was a serious incident on January 19, 1983, in which a tractor trailer after a brake failure collided with four cars at the Stratford toll plaza, killing seven people and injuring several others. The investigation following the crash determined that the truck driver fell asleep at the wheel just before the crash took place.[8] At the time, the government of Connecticut was removing tolls along the turnpike; as a result of the incident, the government expedited the removal of the remaining tollbooths.[9]

In June 1983, a section of the turnpike's northbound Mianus River Bridge in Greenwich collapsed due to corrosion of its substructure, killing three motorists crossing it at the time.[10]

On March 25, 2004, a tanker truck carrying fuel swerved to avoid a car that cut the truck off and subsequently overturned, dumping 8,000 US gallons (30,000 L) of home heating oil onto the Howard Avenue overpass in Bridgeport. Passing vehicles kicked up the oil which ignited a towering inferno that subsequently melted the bridge structure and caused the southbound lanes to sag several feet. The northbound lanes, which received less damage from the fire, were opened five days later after being reinforced with temporary scaffolding. The southbound lanes opened on April 1, after a temporary bridge was erected.[11]

Stalling of upgrades by budget deficits and lawsuits

edit
 
Northbound I-95 in Stamford

The Connecticut Turnpike opened southwest Connecticut to a mass migration of New Yorkers, leading to substantial residential and economic growth in Fairfield and New Haven counties. The turnpike became a primary commuter route to New York City. With additional segments of I-95 that opened in the 1960s connecting to Providence and Boston, the turnpike became an essential route for transporting people and goods throughout the Northeast. As a result, much of the turnpike had become functionally obsolete by 1965, with traffic exceeding its design capacity. Originally designed to carry 60,000 vehicles per day (VPD) on the four-lane sections and 90,000 VPD on the six-lane portion west of New Haven, the turnpike carried 75,000–100,000 VPD east of New Haven, and 130,000–200,000 VPD between New Haven and the New York state line as of 2006.

There were dozens of plans discussed to alleviate traffic congestion and improve safety on the turnpike for nearly 30 years, but most of these plans languished amid political infighting and lawsuits brought on by special-interest groups. Still, traffic and deadly accidents continued to increase each year on the turnpike, and by the 1990s the Connecticut Turnpike had started to become known as "the Highway of Death".[12]

Furthermore, while most of the turnpike is signed as I-95 or I-395, the highway was designed and built before the Interstate Highway System was established. As a result, much of the turnpike does not meet Interstate standards, particularly with overpasses ranging from 13.5 to 15 feet (4.1 to 4.6 m); Interstate Highway standards require 16 feet [4.9 m] of vertical clearance. Interchanges are too closely spaced; ramps and acceleration-deceleration lanes need to be lengthened. In some areas, median and shoulder widths and curve radii also fall short of Interstate standards.[13]

Complicating efforts to upgrade the turnpike to Interstate standards is that engineers did not acquire enough right-of-way to accommodate future expansion when the Connecticut Turnpike was built during the late 1950s, which means adjacent land must be seized to upgrade the turnpike, resulting in lengthy and costly eminent domain battles between the State of Connecticut and landowners refusing to give up their property. Additionally the turnpike passes through areas with some of the highest property values in the country, making land acquisition for expanding the highway extremely expensive.[clarification needed] Finally, the turnpike was built through environmentally sensitive ecosystems and wetlands associated with Long Island Sound, meaning most expansion projects require lengthy environmental impact studies that are able to withstand constant litigation by environmental groups. Air pollution laws also cause conflict, since Connecticut is grouped into the federal statistical areas around New York City and it suffers from consequences and special regulations applied to non-compliant air quality areas. An example of this is that it is easier to lengthen an entrance or exit ramp than to add a full lane, since adding any capacity to a road, by definition, will increase the pollution created by the road, further violating federal air quality standards. In 2000, one ConnDOT official commented during a public meeting on expanding I-84 (an Interstate that parallels I-95 about 20 miles [32 km] further inland), "If we had tried to build I-95 today, it would be impossible because of the sensitive ecosystems it passes through. It would never get approved."[citation needed]

Bridge collapse jumpstarts turnpike upgrades

edit

A comprehensive plan to address safety and capacity issues on the Connecticut Turnpike did not progress beyond the initial planning stages until the collapse of the Mianus River Bridge on June 28, 1983.[14] Following the collapse, Governor William A. O'Neill initiated an $8 billion program to rehabilitate Connecticut's highways. Included in this program was the inspection and repair of the turnpike's nearly 300 bridges and overpasses. Furthermore, O'Neill directed ConnDOT to develop a viable plan for addressing safety and congestion on the state's roads.

High-priority status

edit

Throughout the late 1980s and early 1990s, ConnDOT developed a comprehensive plan to improve the turnpike through Fairfield and New Haven counties. In 1993 ConnDOT embarked on a 25-year multibillion-dollar program to upgrade the Connecticut Turnpike from the Connecticut River at Old Saybrook to the New York state line at Greenwich. The program included the complete reconstruction of several turnpike segments, including replacing bridges, adding travel lanes, reconfiguring interchanges, upgrading lighting and signage, and implementing the intelligent transportation system with traffic cameras, a variety of embedded roadway sensors, and variable-message signs. Since the start of the program, a six-mile (9.7 km) section through Bridgeport was completely rebuilt to Interstate standards. In 2015, a long-term $2 billion program was completed, to rebuild 12 miles (19 km) of turnpike between West Haven and Branford, including a new extradosed Pearl Harbor Memorial Bridge over the Quinnipiac River and New Haven Harbor.

Plans to upgrade the turnpike received a boost in 2005 when federal legislation known as SAFETEA-LU designated the I-95 portion of the Connecticut Turnpike from the New York state line to Waterford as High Priority Corridor 65. Corridor 65 also includes the 24-mile (39 km) section of I-95 from Waterford to the Rhode Island state line that was built in 1964, which is not part of the Turnpike.

Plans for the I-395/SR 695 section

edit

Traffic is relatively light on the rural I-395 section and the northeast leg (SR 695) in Killingly; this section is largely unchanged from its original 1958 profile. The only two major projects completed on this section since were the 2015 renumbering of exits based on I-395 mileposts (exit 77 became exit 2, up to exit 90 which became exit 35) and the reconstruction of the northbound on and off ramps at exit 11 (old exit 80) in Norwich, completed in 2009.

Improvement projects

edit
  • Raymond E. Baldwin Bridge replacement (Connecticut River), Old Saybrook (to Old Lyme): $460 million, completed in 1994
  • Saugatuck River Bridge replacement, Westport: $65 million, completed in 1996
  • Lake Saltonstall Bridge Widening, East Haven: $50 million, completed in 1997
  • Widening and reconstruction exits 8-10, Stamford: $80 million, completed in 2000
  • Reconstruction of exit 40, Milford: $30 million, completed in 2002
  • Reconstruction of exit 41, Orange: $60 million, completed in 2000
  • Reconstruction/widening exits 23-30, Bridgeport: $570 million, completed in 2006 (two years behind schedule and $170 million over budget) (NOTE 2)
  • Widening between exits 51 to 54, East Haven–Branford: $86 million, completed in 2006
  • Reconfigure northbound ramps at exit 80, Norwich: $8 million, started in April 2009, completed in November 2009.
  • Widening between exits 51 and 49 (NOTE 1), East Haven–New Haven: $70 million, started in 2005, completed in 2008
  • Pearl Harbor Memorial Bridge replacement, New Haven: $490 million, started in 2008, completed in 2015 (NOTE 3)
  • I-91/Route 34 interchange reconstruction, New Haven: $270 million, initial phases started in 2004, completed in 2016
  • Exit 42 reconstruction, West Haven: $36 million, started in 2003, completed in 2007
  • Housatonic River Bridge replacement, Milford–Stratford: $300 million, work started in September 2009, completed in 2016
  • West River Bridge replacement and widening (including reconstructing exit 44 and removing exit 45), New Haven: $200 million; construction began in 2014, completed in 2018
  • Widening between exits 10 and 13, Darien: $35 million, started in 2008, completed in 2010
  • Widening between exits 14 and 15, Norwalk: $50 million, started in 2013, completed in 2015
  • Widening and reconstruction between exits 45 and 47 (Long Wharf Section), New Haven: $200–500 million, started in 2009, completed in 2013
  • Add a travel lane in each direction from Branford to Waterford: $1.0 billion
  • Reconstruction and widening exits 6-8, Stamford: Cost TBD, expected start TBD, expected completion TBD.
  • Add a travel lane in each direction from New York state Line to Bridgeport: Cost TBD, expected start TBD, expected completion TBD
  • In addition, ConnDOT has been reconstructing the median of the turnpike in stages, replacing the pre-existing steel guide rail and grass divider with a six-foot-wide (1.8 m), 48-inch-tall (120 cm) Jersey barrier along the highway's length from the Baldwin Bridge to the New York state line.
  1. Exit 49 was permanently closed in October 2006 as part of this project. Access to Stiles Street is now provided at exit 50 via the newly constructed Waterfront Connector. The southbound on-ramp still exists onto the Pearl Harbor Memorial Bridge.
  2. The southbound off-ramp and northbound on-ramp for exit 28 were removed in 2000 during reconstruction of the Connecticut Turnpike in Bridgeport.
  3. Replacement of the Pearl Harbor Memorial Bridge in New Haven was planned to start in 2007. Due to the rising cost of materials however, there were no contractors interested in the project when it was advertised for bid in 2006. ConnDOT broke the project up into several smaller contracts, with construction completed on all contracts by November 2016.

Tolls

edit

Tolls on the Connecticut Turnpike have been a source of controversy from the turnpike's opening in 1958 to the removal of tolls in 1985, and the debate continues today. The Connecticut Turnpike originally opened with a barrier toll system (or open system), unlike toll roads in neighboring states, which used a ticket system (or closed system) for collecting tolls. Initially tolls on the Connecticut Turnpike were $0.25, and the toll barriers were located in the following locations: Greenwich, Norwalk, Stratford, West Haven, Branford, Madison, Montville, and Plainfield. Tolls also were collected until 1969 in Old Saybrook at the west end of the Baldwin Bridge over the Connecticut River. Additionally, unlike other toll roads which featured widely spaced interchanges and generally ran along the outskirts of major urban centers, the Connecticut Turnpike was built through the middle of several large cities (notably Stamford, Bridgeport, and New Haven) and has over 90 interchanges along its 129-mile (208 km) length—50 of which are along the 50-mile (80 km) stretch between the New York state line and New Haven.[citation needed]

Token war with New York City Subway

edit

There was some controversy in the early 1980s when New York City Subway riders discovered that tokens purchased for use in the Connecticut Turnpike toll booths were of the same size and weight as New York City Subway tokens. Since the turnpike tokens cost less than one third as much, they began showing up in subway collection boxes regularly.[15] Connecticut authorities initially agreed to change the size of their tokens,[16] but later reneged and the problem went unsolved until 1985, when Connecticut discontinued tolls on the turnpike.[17] At that time, the MTA was paid 17.5 cents for each of more than two million tokens that had been collected during the three-year "token war".[17]

Abolition of tolls

edit

After the 1983 truck crash at the Stratford toll plaza, toll opponents pressured the State of Connecticut to remove tolls from the turnpike[9] in 1985. Three years later, these same opponents successfully lobbied the Connecticut General Assembly to pass legislation abolishing tolls on all of Connecticut's highways (with the exception of two car ferries across the Connecticut River in Chester and Glastonbury). While the 1983 Stratford accident was cited as the main reason for abolishing tolls in Connecticut, the underlying reason was that federal legislation at that time forbade states with toll roads from using federal funds for road projects. Because the Mianus River Bridge was rebuilt with federal highway funds following its June 1983 collapse, Connecticut was required by Section 113(c) of the Federal Aid Highway Act of 1956 to remove tolls from the turnpike once its construction bonds were paid off.[18]

The debate over tolls on the Connecticut Turnpike did not end in 1988 with the abolition of tolls. Prior to their removal in 1985, the tolls generated over $65 million annually. Since their removal in the late 1980s, Connecticut lawmakers have continuously discussed reinstating tolls, but have balked at bringing tolls back out of concern of having to repay $2.6 billion in federal highway funds that Connecticut received for turnpike construction projects following the abolition of tolls.

During the economic recession of the early 1990s, legislators studied reinstating tolls on parts of the Connecticut Turnpike and portions of highways around Hartford to make up for budget deficits. Proposals for reinstating tolls were scrapped in lieu of implementing an income tax and increasing the state gasoline tax and sales tax, and imposing a new tax on corporate windfall profits.

Continuation of toll debate

edit

With continual budget woes in Hartford, the idea of reinstating tolls resurfaced in January 2010. State Representative Tony Guerrera estimated a $5 toll at Connecticut's borders could generate $600 million in revenue. Governor Dannel P. Malloy expressed pessimism that toll revenue would be spent exclusively on infrastructure repairs, but a need to generate additional revenue, paired with decreases in traditional highway funding sources (such as federal aid and gas tax revenue) means the idea could receive serious consideration in the state legislature.[citation needed]

Services

edit
 
Fairfield Service Plaza southbound

The turnpike has 13 service plazas, which are open 24 hours a day. All feature a Subway, a Dunkin' Donuts, a convenience store and fuel service provided by ExxonMobil (branded as Mobil). Most plazas also offer a variety of other food service options, including McDonald's and Sbarro. From 2011 to 2015, the original plazas were rebuilt with new and expanded buildings and improved fueling facilities. Prior to the rebuilding, the plazas on the I-395 section only had a convenience store.

  • Darien southbound—between exits 10 and 9—food and fuel—rebuilt 2013
  • Darien northbound—between exits 12 and 13—food and fuel—Connecticut Welcome Center—Rebuilt 2013. The McDonald's restaurant at this service area claims to be the busiest in the country.[19]
  • Fairfield northbound and southbound—between exits 21 and 22—food and fuel—rebuilt 2014
  • Milford northbound and southbound—between exits 40 and 41—food and fuel—rebuilt 2011
  • Branford northbound and southbound—between exits 53 and 54—food and fuel—rebuilt 2013–14
  • Madison northbound and southbound—between exits 60 and 61—food and fuel—NB rebuilt 2014, SB rebuilt 2015
  • Montville southbound only—between exits 9 and 6—food and fuel—rebuilt 2013
  • Plainfield northbound and southbound—between exits 32 and 35—food and fuel—rebuilt 2012

The former northbound Montville service area has been turned into a State Police barracks.

In addition to the service areas listed above, there is a rest area, with restrooms, picnic area, vending machines, and tourist information, located northbound at milepost 74 between exits 65 and 66. In July 2016, the rest area was closed due to budget cuts and barriers were placed on the highway blocking access to the facility. In September 2019, the rest area was reopened on a seasonal basis, being closed from November until mid May (with no access during that time).

There are three State Police stations located on the turnpike: Troop F: Westbrook at milepost 74 on southbound side of turnpike. Troop E: Montville at milepost 96 on northbound side of turnpike (at former service plaza). Troop G: Bridgeport at milepost 29 and the junction with Route 25 and Route 8 (on surface road, exit 27, just below interchange).

There is one weigh station located northbound at milepost 2 in Greenwich, at the location of the former toll plaza. Weigh stations on both sides of the turnpike used to exist near exit 18 in Westport; these were removed during the 1990s. The former southbound weigh station in Westport is now used by ConnDOT to store construction materials, while the northbound station was demolished; the grounds returned to their natural state.

The administration building for the former West Haven toll plaza can still be seen by drivers between exits 42 and 43. Today, ConnDOT uses the old toll building as a maintenance facility.

In 2013, Telsa Supercharger points for electric vehicles were added at each Milford plaza, the second along I-95, with new charging stations, including CHAdeMO-compatible points, added through the years to other service plazas.[20]

Exit list

edit

Exits were renumbered to mile-based numbering on the I-395 and SR 695 portions of the turnpike as part of a sign replacement project in 2015.

}}

CountyLocationmi[1]kmOld exitNew exitDestinationsNotes
FairfieldGreenwich0.000.00 
 
 
 
 
I-95 south to I-287 west – New York City
Continuation into New York; southern end of I-95 concurrency
0.801.292Delavan Avenue – Byram
2.003.22Former toll plaza
2.544.093Arch Street
3.736.004Indian Field Road – Cos Cob
4.35–
4.85
7.00–
7.81
Mianus River Bridge
5.538.905  US 1 – Riverside, Old Greenwich
Stamford6.50–
6.62
10.46–
10.65
6Harvard Avenue / West AvenueSigned for Harvard Avenue northbound, West Avenue southbound
7.3411.817 
 
 
Greenwich Avenue to Route 137 north
Northbound exit and southbound entrance; access to Route 137 via SSR 493
7.6812.368Canal StreetNorthbound exit and southbound entrance
7 
 
 
To Route 137 north / Atlantic Street
Southbound exit and northbound entrance
8.2013.208Elm StreetSouthbound exit and northbound entrance
9.2814.939  
 
US 1 / Route 106 north – Glenbrook
Southern terminus of Route 106
Darien10.7517.3010NorotonAccess via Noroton Avenue
11.6118.6811  US 1 – Darien, Rowayton
12.2319.6812  Route 136 (Tokeneke Road) – RowaytonNorthbound exit and southbound entrance
13.1621.1813  US 1 (Post Road)
Norwalk14.8323.8714  US 1 (Connecticut Avenue) – South NorwalkSigned for US 1 southbound, South Norwalk northbound
15.5024.9415 
 
US 7 north – Norwalk, Danbury
Southern terminus of US 7
15.91–
16.08
25.60–
25.88
Yankee Doodle Bridge over the Norwalk River
16.2426.1416East NorwalkAccess via East Avenue
18.029.0Former toll plaza
Westport18.1429.1917 
 
  Route 33 north / Route 136 – Westport, Saugatuck
Southern terminus of Route 33
20.3632.7718Sherwood Island Connector (SSR 476)To US 1 and Sherwood Island State Park
Fairfield22.88–
23.12
36.82–
37.21
19  US 1 – Southport
23.7238.1720Bronson RoadSouthbound exit and northbound entrance
24.3839.2421Mill Plain Road
25.0340.2822Round Hill Road – Service PlazaNorthbound exit and southbound entrance
25.2240.59  
 
US 1 / Route 135 north (North Benson Road)
Southbound exit and northbound entrance; US 1 not signed; southern terminus of Route 135
25.7341.4123  US 1 (Kings Highway)
26.7042.9724Black Rock TurnpikeAccess via US 1
Bridgeport27.4444.1625Commerce Drive / State StreetNorthbound exit and southbound entrance
27.6644.51  Route 130 (Fairfield Avenue)Southbound exit and northbound entrance
28.3045.5426Wordin Avenue
29.0046.6727Lafayette Boulevard – Downtown BridgeportNorthbound exit and southbound entrance
29.0346.7227A 
 
 
 
Route 8 north / Route 25 north – Trumbull, Waterbury
Southern terminus and exits 1A-B on Route 8/Route 25
29.1546.9127B    Transportation Center, Long Island Ferry, Total Mortgage ArenaSouthbound exit and northbound entrance; access via Lafayette Street
27CLafayette Boulevard – Downtown BridgeportSouthbound exit and northbound entrance
29.33–
29.81
47.20–
47.97
P.T. Barnum Bridge over the Pequonnock River
29.8748.0728 
 
  Route 127 north (East Main Street) / Route 130
Northbound exit and southbound entrance; southern terminus of Route 127; Route 130 not signed
30.1948.5929  Route 130 (Stratford Avenue)Access via Seaview Avenue
BridgeportStratford line31.07–
31.30
50.00–
50.37
30 
 
Route 113 north (Lordship Boulevard) / Surf Avenue
Signed for Route 113 northbound, Surf Avenue southbound; southern terminus of Route 113
Stratford32.12–
32.30
51.69–
51.98
31Honeyspot Road / South Avenue / Stratford AvenueSigned for Honeysport Road northbound, South Avenue southbound
32.8752.9032West Broad Street – Stratford
33.053.1Former toll plaza
34.0054.7233  
 
US 1 / Route 110 north (East Main Street) / Ferry Boulevard (Route 130 west)
Southern terminus of Route 110
Housatonic River34.25–
34.86
55.12–
56.10
Moses Wheeler Bridge
New HavenMilford35.3756.9234  US 1 – Milford
35.8557.6935School House Road / Sub Way / Bic DriveTo Subway headquarters
36.6959.0536Plains Road
37.4560.2737High StreetNorthbound exit and southbound entrance
37.6060.5138 
 
To Route 15 (Merritt Parkway / Wilbur Cross Parkway)
Access via Milford Parkway
39.1362.9739  US 1 – Downtown MilfordSigned as exits 39A (south) and 39B (north)
40Old Gate Lane (SR 708 east) to Woodmont RoadNorthbound exit only
40.2564.78Woodmont RoadNo northbound exit
Orange41.8067.2741Marsh Hill Road
West Haven43.9370.7042  Route 162 (Saw Mill Road)
44.070.8Former toll plaza
44.8772.2143Campbell Avenue – Downtown West HavenNorthbound exit and southbound entrance
45.1972.73 
 
Route 122 north (First Avenue)
Southbound exit and northbound entrance; southern terminus of Route 122
New Haven46.0674.1344 
 
 
 
 
Route 10 north (Ella T. Grasso Boulevard) to Route 34 west – Downtown New Haven, Yale Stadiums
Southern terminus of Route 10; former exit 45 southbound; Downtown New Haven not signed northbound
46.82–
47.26
75.35–
76.06
46Long Wharf Drive / Sargent Drive
47.46–
47.75
76.38–
76.85
47Oak Street Connector (SR 724 west) – Downtown New HavenSigned as MLK Boulevard; former Route 34
47.58–
47.91
76.57–
77.10
48 
 
I-91 north – Hartford
Southern terminus and exits 1A-C on I-91
47.80–
48.67
76.93–
78.33
Pearl Harbor Memorial Bridge over Quinnipiac River
49.2179.2050  
 
US 1 / Route 337 east / Woodward Avenue – Lighthouse Point, Port Area
Northbound exit and southbound entrance; US 1/Route 337 not signed
East Haven49.50–
50.22
79.66–
80.82
51  US 1 (Frontage Road) – Lighthouse PointSigned for East Haven northbound, Lighthouse Point southbound
50.5381.3252  Route 100 (North High Street) – East HavenSouthbound exit and northbound entrance
Branford51.082.1Former toll plaza
52.3384.2253 
 
 
 
 
 
 
 
To US 1 / Route 142 west / Route 146 east – Short Beach
Northbound exit and southbound entrance; access via SR 794
53.2485.6854Cedar Street (SR 740) – Branford
55.1988.8255  US 1 (East Main Street) – North BranfordNorth Branford not signed southbound
56.2590.5356Leetes Island Road – Stony Creek
Guilford59.3295.4757  US 1 (Boston Post Road) – North BranfordNorth Branford not signed northbound
60.2396.9358  Route 77 – North Guilford, Guilford
61.4998.9659   US 1 / Route 146 / Goose LaneUS 1/Route 146 not signed
Madison63.0101.4Former toll plaza
63.48102.1660Mungertown RoadSouthbound exit and northbound entrance
Madison service plaza
64.73104.1761  Route 79 – North Madison, Madison
66.43106.9162Hammonasset State ParkAccess via SSR 450
MiddlesexClinton68.61110.4263  Route 81 – Clinton, Killingworth
Westbrook70.78113.9164  Route 145 (Horse Hill Road) – Clinton
73.14117.7165  Route 153 – Westbrook
Old Saybrook74.40119.7466  Route 166 (Spencer Plain Road)
75.93–
76.74
122.20–
123.50
67  Route 154 – Old Saybrook
77.80–
78.28
125.21–
125.98
68 
 
US 1 south – Old Saybrook
Southern end of US 1 concurrency; southbound exit and northbound entrance
78.07125.6469 
 
Route 9 north – Essex, Hartford
Southern terminus and exits 1A-B on Route 9; trumpet interchange
78.1125.7Former toll plaza
Connecticut River78.45–
78.93
126.25–
127.03
Raymond E. Baldwin Bridge
New LondonOld Lyme79.16127.4070 
 
  US 1 north / Route 156 – Old Lyme
Northern end of US 1 concurrency; US 1 not signed southbound
83.49134.3671Four Mile River Road
East Lyme84.02135.2272Rocky Neck State ParkAccess via SSR 449
85.79138.0773Society Road
87.28140.4674  Route 161 – Flanders, Niantic
88.05141.7075  US 1 – Waterford, Flanders
88.48
0.00
142.39
0.00
76 
 
I-95 north – New London, Providence
 
 
I-395 begins
Northern end of I-95 concurrency; northbound exit and southbound entrance; southern terminus of I-395
Waterford2.133.43772  Route 85 – Waterford, Colchester
Montville5.348.59785 
 
 
To Route 32 south – New London
Southbound exit and northbound entrance; access via SR 693
6.3310.19796  Route 163 – Uncasville, Montville
7.5212.10Former toll plaza
9.6015.4579A9 
 
Route 2A east – Ledyard, Preston
Southern end of Route 2A concurrency
Norwich11.0817.838011  Route 82 – Salem, Downtown Norwich
13.7122.068113   Route 2 / Route 32 – Norwich, Hartford
 
 
Route 2A ends
Signed as exits 13A (east/south) and 13B (west/north); northern terminus of Route 2A
14.2322.908214West Town Street (SR 642) – Yantic, Norwichtown
 
 
 
 
 
 
To Route 2 west / Route 32 north – Hartford, Colchester
Signed southbound only
18.1729.248318  Route 97 – Taftville, Occum
Lisbon19.5331.4383A19  Route 169 – Lisbon, CanterburyNorthbound exit and southbound entrance
21.1634.058421  Route 12 – Jewett City, Griswold, Lisbon, TaftvilleSigned as exits 21A (north) and 21B (south) southbound
Griswold21.8035.088522  
 
Route 164 to Route 138 – Preston City, Pachaug
Northbound exit and southbound entrance; access to Route 138 via SR 630
22.2835.86  
 
Route 138 to Route 164 – Jewett City, Griswold
Southbound exit and northbound entrance; access to Route 164 via SR 629
24.2639.048624  Route 201 – Hopeville, Jewett City
WindhamPlainfield28.2345.438728Lathrop Road (SR 647)
29.6547.728829  Route 14A – Plainfield, Oneco
32.3051.988932  Route 14 – Central Village, Moosup
32.5252.34Former toll plaza
35.50
0.00
57.13
0.00
9035 
 
 
 
 
I-395 north to US 6 west – Worcester, Hartford
SR 695 begins
Northern end of I-395 concurrency; northbound exit and southbound entrance; western terminus of SR 695
Killingly0.260.42911Squaw Rock RoadSouthbound exit and northbound entrance
0.961.54Ross RoadNorthbound exit and southbound entrance
4.497.23 
 
US 6 east – Providence
SR 695 ends
Northern terminus; eastern terminus of SR 695
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

edit

References

edit
  1. ^ a b "Highway Log" (PDF). Connecticut Department of Transportation. December 31, 2014. Archived from the original (PDF) on September 5, 2015. Retrieved December 12, 2021.
  2. ^ a b "Connecticut Turnpike, Under Construction Almost 4 Years, to Be Opened to Traffic Today". The New York Times. January 2, 1958. p. 31.
  3. ^ a b Connecticut Department of Transportation. "ConnDOT: Chapter 7 DOT History". Archived from the original on February 27, 2020. Retrieved November 6, 2016.
  4. ^ a b "2006 Traffic Volumes" (PDF). www.ct.gov.
  5. ^ "Section 13a-21 of the General Statutes of Connecticut". Archived from the original on November 7, 2016. Retrieved October 4, 2014.
  6. ^ "Providence Journal: I-95 in Fairfield". WestportNow.com. Westport, Connecticut. April 24, 2003. Retrieved October 4, 2014.
  7. ^ "State Ordered to Lift Ban on Tandem Trucks". Hartford Courant. June 14, 1983.[full citation needed] The article lists "I-290 (formerly Route 52)" as one of the highways to which the lifting of the ban applies.
  8. ^ "6 Die in Crash at Toll Station in Connecticut". The New York Times. January 20, 1983. ISSN 0362-4331. Retrieved January 3, 2023.
  9. ^ a b "Crash survivor recalls accident that removed Connecticut's tolls". WTNH.com. April 24, 2015. Retrieved January 3, 2023.
  10. ^ Schmalz, Jeffrey (June 24, 1984). "Year After Bridge Collapse, Questions and Pain Still Linger". The New York Times. ISSN 0362-4331. Retrieved January 3, 2023.
  11. ^ Tavernise, Sabrina; Salzman, Avi (March 26, 2004). "Fiery Truck Crash Closes I-95 in Connecticut For Weeks". The New York Times. ISSN 0362-4331. Retrieved January 3, 2023.
  12. ^ "The Most Dangerous Roads Highways in America". Reiff & Bily. June 25, 2014.
  13. ^ "Mitigation Strategies for Design Exceptions". Federal Highway Administration. July 2007.
  14. ^ Weizel, Richard (October 17, 2011). "Road Crews Toil as Fairfield County Bridges Age". The Greenwich Daily Voice. Retrieved July 18, 2012.
  15. ^ "Connecticut Highway Token Buys Subway Ride, Too". The New York Times. November 18, 1982. p. 1.
  16. ^ "Connecticut to Alter Its Turnpike Tokens, Solving Subway Issue". The New York Times. December 15, 1982. p. 1.
  17. ^ a b "7 1⁄2 Accord Accord Puts an End to the Great Token War". The New York Times. November 7, 1985.
  18. ^ "Why Does The Interstate System Include Toll Facilities?". Ask the Rambler. Federal Highway Administration. Retrieved November 6, 2016.
  19. ^ "Visit One of the Busiest McDonald's in U.S".
  20. ^ Hanley, Richard C. "EV Infrastructure Project Mgr". Connecticut Department of Transportation Research & Implementation Unit. {{cite web}}: Missing or empty |url= (help)
edit
KML is from Wikidata